GB/T 35047-2018Societal security -- Mass evacuation -- Guidelines for planning (English PDF)
Also coversGBT35047-2018
Open the GB/T 35047-2018 preview as PDF
This is a limited preview
Buy now to download the full PDF
Issued by
State Administration for Market Regulation, China National Standardization Administration
Level / Type
National · Recommended
Issue date
May 14, 2018
Implementation date
November 1, 2018
Scope
GB/T 35047-2018 (Societal security -- Mass evacuation -- Guidelines for planning) is available as an English-translated PDF.
GB/T 35047-2018 — This standard provides guidance for the establishment, implementation, monitoring, evaluation, and improvement of large-scale evacuation planning. This standard is a large-scale evacuation of all activities Moving provides a framework. It can help organizations form a fact-based plan that can be used to evaluate performance. This standard applies to all types and sizes of organizations responsible for or involved in the formulation of large-scale evacuation plans, such as. national and local levels of government Governments, statutory agencies, international and non-governmental organizations, businesses, the public, and social groups. This standard aims to obtain a more effective response in the actual evacuation process, helping organizations to reduce casualties. This standard does not involve related actions such as maintenance of stability, property, and environmental protection in the affected areas after evacuation.
Document preview — GB/T 35047-2018
National Standard of the People's Republic of China
- ICS
- 13.200
- Classification
- A 90
Issued by: State Administration for Market Regulation, China National Standardization Administration
Contents
- Foreword
- Introduction
- 1 Scope
- 2 Normative references
- 3 Terms and Definitions
Foreword
This standard was drafted in accordance with the rules given in GB/T 1.1-2009.
This standard uses the translation method equivalent to the adoption of ISO 22315.2014 "Public Safety Large-scale Evacuation Planning Guide."
The Chinese documents that have a consistent correspondence with the normatively cited international documents in this standard are as follows.
--- GB/T 27921-2011 risk management risk assessment technology (ISO /IEC 31010.2009, MOD).
This standard is proposed and managed by the National Public Safety Fundamental Standardization Technical Committee (SAC/TC351).
This standard was drafted by. China National Institute of Standardization, Beijing Institute of Safe Production Science and Technology, China Institute of Safe Production Science,
Beijing Urban Systems Engineering Research Center, China University of Science and Technology, Tsinghua University, North China University of Technology, Zhengzhou Institute of Technology.
Introduction
This standard provides guidelines for planning large-scale evacuation. Evacuation refers to the evacuation of the public from designated locations in order to deal with danger or threats.
A large-scale evacuation will involve a large number of people and a wider area, requiring cross-organizational cooperation and resources. Due to the type of disaster, the nature of the community
There is a difference in the ability of responders and it is difficult to define mass evacuation in terms of quantity or scale. However, the number of evacuees can be exceeded
Consider the scale of daily response, such as the evacuation of a city, area or densely populated area.
The demand for evacuation can be derived from naturally occurring, human-induced (including intentional and unintentional) and technical failures.
Some events require immediate evacuation, while others have early warnings.
Effective planning is essential to reduce casualties. Planning can promote the effective response of personnel, which is part of emergency management
Minute. This standard provides guidance for the formulation of large-scale evacuation planning, decision support, promotion of effective response, and strengthening of emergency preparedness for the public and organizations.
south. This standard also points out factors that hinder public evacuation, such as pets, valuables, etc.
This standard can be used for the preparation of large-scale evacuation planning and the provision of evacuation sites for large numbers of evacuees. It includes the following 8
On the other hand, these eight aspects are also the structure of this standard (Chapter 4 to Chapter 11, see Table 1).
Table 1 Chapter 4 to Chapter 11 of this standard
Overview of Mass Evacuation Planning (Chapter 4)
Mass evacuation
Public preparation
Chapter 5)
Dangerous or affected
Visualization of the area
(Chapter 6)
Evacuation decision
Chapter 7)
Public warning
Chapter 8)
Evacuation operations
Analysis (Chapter 9)
Evacuation of evacuees
Difficult place demand assessment
Estimation (Chapter 10)
Assessment and continuous improvement
Into (Chapter 11)
Table 1 describes the overview of large-scale evacuation planning (Chapter 4) (eg, risk assessment and drills). These are related to Chapter 5 to Chapter 11.
The regulations provide support. Planning for the efficient response of the public (Chapter 5) and plans for visualization of dangerous or affected areas (Chapter 6)
The policy provider provides information on whether to organize the evacuation. Planning for evacuation decisions (Chapter 7) aims to ensure decision-making processes, goals, and references
The match is appropriate. Public Alerts (Chapter 8) deals with communications and community alert system protocols. The plan also includes an analysis of the actions of evacuees
(Chapter 9), such as understanding transportation needs and availability. In addition, the plan also requires an evacuation site evacuation site needs assessment (Chapter 10).
For example, identifying the needs of evacuation sites and establishing an agreement to provide evacuation sites. Evacuation planning assessment and continuous improvement (Chapter 11) is the subject
The final part of the standard.
This standard refers to the importance of maintaining stability and property and environmental protection in the affected areas after evacuation, but these two aspects are not
The focus.
Public Safety Mass Evacuation Planning Guide
1 Scope
This standard provides guidance for the establishment, implementation, monitoring, evaluation, and improvement of large-scale evacuation planning. This standard is a large-scale evacuation of all activities
Moving provides a framework. It can help organizations form a fact-based plan that can be used to evaluate performance.
This standard applies to all types and sizes of organizations responsible for or involved in the formulation of large-scale evacuation plans, such as. national and local levels of government
Governments, statutory agencies, international and non-governmental organizations, businesses, the public, and social groups.
This standard aims to obtain a more effective response in the actual evacuation process, helping organizations to reduce casualties.
This standard does not involve related actions such as maintenance of stability, property, and environmental protection in the affected areas after evacuation.
2 Normative references
The following documents are indispensable for the application of this document. For dated references, only dated versions apply to this article
Pieces. For undated references, the latest version (including all amendments) applies to this document.
ISO 22300 Public Security Term (Societal security-Terminology)
ISO 22320 Public Safety Emergency Management Emergency Response Request (Societal security-Emergencyman-
agement-Requirementsforincidentresponse)
ISO 22322 Public Safety Emergency Management Public Warning (Societal Security-Emergency management-
Publicwarning)
ISO 22398 Guide to Public Safety Practices (Societal security-Guidelines for exercises)
ISO 31000 Risk Management Principles and Guidelines (Riskmanagement-Principles and Guidelines)
ISO /IEC 31010 Risk Management Risk Assessment Technology (Riskmanagement-Riskassessmenttechniques)
3 Terms and Definitions
The following terms and definitions defined by ISO 22300 apply to this document.
3.1
Incident management system incidentmanagementsystem
A system that defines the roles, responsibilities, and operating procedures of personnel in the accident management process.
3.2
Prepared preparedness
In order to be able to effectively predict, respond to, and recover from impending or already occurring hazards, the knowledge and capabilities required.
3.3
Community alarm system community-basedwarningsystem
The method of communicating information to the public through the established network.
3.4
Hazardous area areaatrisk
Areas that may be affected by the disaster.
Note. This term is more common in preventive evacuation.
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — all pages — is available in the English PDF.
Referenced standards
Normative references
ISO 22300 · ISO 22320 · ISO 22322 · ISO 22398 · ISO 31000 · IEC 31010
How to Buy GB/T 35047-2018
- 1Add to cart. Click the "Buy GB/T 35047-2018" button on this page. You can add more standards before checkout.
- 2Checkout. Enter your email and billing details. Payment is processed securely by Stripe (cards, Apple Pay, Google Pay supported).
- 3Instant delivery (0–9 sec). Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4Invoice included. A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
GB/T 46830.2-2026 — Plastics - Liquid crystal polymer (LCP) moulding and extrusion materials - Part 2: Preparation of test specimens and determination of properties
GB/T 28593-2026 — Sand and dust weather warning levels
GB/T 19608.3-2026 — Classification of special environmental conditions - Part 3: Plateau
Secure payment via Stripe
Payments accepted
GB/T 35047-2018
$300.00