GB/T 34961.2-2024Information technology - Implementation and operation of customer premises cabling - Part 2: Planning and installation (English PDF)

Preview PDF

This is a limited preview

Buy now to download the full PDF (131 pages)

Need quotation for your management?

Get a formal quotation for GB/T 34961.2-2024 in 30 minutes.

Issued by

State Administration for Market Regulation, China National Standardization Administration

Level / Type

National · Recommended

Issue date

March 15, 2024

Implementation date

October 1, 2024

Scope

GB/T 34961.2-2024 (Information technology - Implementation and operation of customer premises cabling - Part 2: Planning and installation) is available as an English-translated PDF.

GB/T 34961.2-2024 — This document specifies requirements for the planning, installation and operation of telecommunications cabling and cabling infrastructure, including supporting common cabling standards and related documentation.

The requirements for cabling, paths, spaces and telecommunication connections (except those specified in GB/T 43783) of the equipment mainly specify the following aspects. a) Installation specifications; b) quality assurance; c) Installation planning; d) installation and implementation; e) documentation; f) management; g) testing; h) inspection; i) operation; j) maintenance; k) Repairs.

The requirements and recommendations in Chapters 5 to 14 are not relevant to the type of building complex. Requirements and recommendations for specific building complexes are in Appendix C to Appendix G. Make regulations.

Additionally, this document describes methods for evaluating spaces, pathways, pathway systems, and cabling (installed or planned) to support remote power delivery.

This document does not include specific requirements applicable to other cabling systems (such as power cabling); however, it takes into account the impact of other cabling systems on telecommunications.

The impact of cabling installation (and vice versa) is discussed and general recommendations are given. This document does not cover free space communications between transmitters, receivers or their associated antenna systems (e.g. wireless, radio, microwave or satellite).

Installation aspects related to signal transmission. This document applies to certain hazardous environments but does not exclude additional requirements applicable to special environments (such as power supply and electrified railways).

Safety and electromagnetic compatibility (EMC) requirements are specified by other standards and are outside the scope of this document. This information helps meet these standards and regulations.

Found what you need?

Document preview — GB/T 34961.2-2024

National Standard of the People's Republic of China

ICS
35.200
Classification
L 65
Replacing
GB/T 34961.2-2017

Issued by: State Administration for Market Regulation, China National Standardization Administration

Contents

  • Preface
  • Introduction
  • 1 Scope
  • 2 Normative references
  • 3 Terms and definitions, abbreviations
  • 3.1 Terms and Definitions
  • 3.2 Abbreviations
  • 3.3 Conventions
  • 4 Compliance
  • 5 Installation Specifications
  • 5.1 Overview
  • 5.2 Installation Instructions
  • 5.3 Technical Notes
  • 5.4 Scope of work
  • 5.5 Quality Assurance
  • 6 Quality Planning 16
  • 6.1 Quality Plan
  • 6.2 Cabling assembly description
  • 6.3 Sampling
  • 6.4 Handling of critical results
  • 6.5 Handling of unqualified results
  • 6.6 Change Control
  • 7 Installation Planning
  • 7.1 General
  • 7.2 Security
  • 7.3 Environment
  • 7.4 Electrical contacts
  • 7.5 Provisions on outsourcing services 22
  • 7.6 Paths and Path Systems
  • 7.7 Equipment Space
  • 7.8 Functional Elements
  • 7.9 Separation of telecommunication cabling and power supply cabling within buildings
  • 7.10 Separation of underground telecommunication cabling and power supply cabling outside buildings
  • 7.11 Separation of aerial telecommunication cabling
  • 7.12 Maintenance Planning
  • 7.13 Cabling requirements
  • 7.14 Cabling planning and assessment to support remote power delivery objectives
  • 8 Installation and Implementation
  • 8.1 Requirement
  • 8.2 Security
  • 8.3 Environment
  • 8.4 Component inspection and testing requirements
  • 8.5 Path
  • 8.6 Device Space
  • 8.7 Path System Installation
  • 8.8 Chassis Installation
  • 8.9 Cable Installation
  • 8.10 Cable Connection and Termination
  • 8.11 Jumper
  • 8.12 Surge protection device
  • 8.13 Acceptance
  • 9 Documentation and Management
  • 9.1 Notation and preparation of documentation
  • 9.2 Management
  • 10 Test
  • 10.1 General
  • 10.2 Test steps for balanced cabling
  • 10.3 Test Procedures for Optical Fiber Cabling
  • 11 Test
  • 11.1 General
  • 11.2 Level 1 Inspection
  • 11.3 Level 2 Inspection
  • 11.4 Level 3 Inspection
  • 11.5 Inspection Document Requirements
  • 12 Run
  • 12.1 Device Connection
  • 12.2 Standard operating procedures
  • 12.3 Jumper
  • 12.4 Fiber Optic Adapters
  • 13 Maintenance
  • 13.1 Maintenance Methods
  • 13.2 Maintenance Procedures
  • 14 Maintenance
  • Appendix A (Normative) Fiber Polarity Maintenance. Multi-fiber Connection Hardware
  • Appendix B (Normative) Common Infrastructure in Multi-family Buildings
  • Appendix C (Normative) Cabling in accordance with GB/T 18233.2
  • Appendix D (Normative) Cable laying in accordance with GB/T 18233.3
  • Appendix E (Normative) Cabling in accordance with ISO/IEC 11801-4
  • Appendix F (Normative) Cable laying in accordance with GB/T 18233.5
  • Appendix G (Normative) Cable laying in accordance with GB/T 18233.6
  • Appendix H (Informative) Equipment Accommodation Environment
  • Appendix I (Normative) Remote Power Supply Information
  • References

Foreword

This document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for standardization work Part 1: Structure and drafting rules for standardization documents" Drafting.

This document is part 2 of GB/T 34961 "Implementation and operation of cabling in user buildings for information technology". GB/T 34961 has been the following parts have been published.

--- Part 1: Management;

--- Part 2: Planning and installation;

--- Part 3: Optical fiber cabling tests;

--- Part 4: Measurements on end-to-end (E2E) links, modular plug-terminated links (MPTLs) and direct connect cabling.

This document replaces GB/T 34961.2-2017 "Implementation and operation of cabling in user buildings of information technology Part 2: Planning and Compared with GB/T 34961.2-2017, in addition to structural adjustments and editorial changes, the main technical changes are as follows.

--- Added the terms "access provider equipment space" (see 3.1.2), "automated infrastructure management system" (see 3.1.4), "closed Path system" (see 3.1.11), "incoming line room" (see 3.1.13), "external conductive parts" (see 3.1.14), "hot zone" (see 3.1.19), "multi-family building" (see 3.1.30), "open path system" (see 3.1.32), "open path system" (see 3.1.33), "Power supply cable" (see 3.1.36), "Power supply cabling" (see 3.1.37), "Remote power supply" (see 3.1.45), "Service provider" (see 3.1.49), "Service Provider Equipment Space" (see 3.1.50), "Telecommunications Equipment" (see 3.1.53), "Entrance Facilities" (see 3.1.55) and its definition;

--- Change the term "acceptance test (for installed cabling)" to "acceptance test" (see 3.1.1, 3.1.1 of the 2017 edition), "anchor pull "Anchor line" means "anchor line" (see 3.1.3, 3.1.2 of the 2017 edition), "cable bundle" means "cable bundle" (see 3.1.5, 3.1.5), "electrostatic discharge" means "electrostatic discharge" (see 3.1.12, 3.1.16 of the 2017 edition), "rack (rack)" means "floor-standing rack" (See 3.1.15, 3.1.19 of the 2017 edition), "Construction unit" means "Construction personnel" (See 3.1.21, 3.1.28 of the 2017 edition), "Junction box" is "junction box" (see 3.1.22, 3.1.30 of the 2017 edition), "manhole (telecommunications)" is "manhole" (see 3.1.24, 3.1.34 of the 2008 edition), "information technology metal cables (cabling)" are "metal telecommunications cables" and "metal telecommunications cabling" (see 3.1.25, 3.1.26, 3.1.37 of the 2017 edition), "Minimum bending radius (installation)" is "Minimum bending radius during installation" (see 3.1.27, 2017 version of 3.1.38), "Minimum bending radius (operating static)" is "Static minimum bending radius" (see 3.1.28, 2017 3.1.39 of the 2017 edition), "Minimum bending radius (operating dynamic)" is "Dynamic minimum bending radius" (see 3.1.29 of the 2017 edition 3.1.40), "non-distorted main grid power supply" is "non-distorted power supply" (see 3.1.31, 3.1.41 of the 2017 edition), "protective (grounding) conductor "Protective earth conductor" is "protective earth conductor" (see 3.1.40, 3.1.48 of the 2017 edition), "work order" is "work order" (see 3.1.56, Version 3.1.63);

--- Delete the terms "unbalanced voltage device" (see 3.1.3 of the 2017 edition), "connected network" (see 3.1.4 of the 2017 edition), "building "Entrance facilities" (see 3.1.6 of the 2017 edition), "Civil engineering works" (see 3.1.12 of the 2017 edition), "Shared connection network" (see 3.1.13 of the 2017 edition), "grounding electrode" (see 3.1.14 of the 2017 edition), "grounding conductor" (see 3.1.15 of the 2017 edition), "Electromagnetic interference" (see 3.1.17 of the 2017 edition), "Equipotential bonding" (see 3.1.18 of the 2017 edition), "Functional grounding conductor" (see 3.1.20 of the 2017 edition), "Impedance Matching Devices" (see 3.1.25 of the 2017 edition), "Information Technology (Telecommunications)" (see 2017 edition), "information technology equipment" (see 3.1.27 of the 2017 edition), "isolated network" (see 3.1.29), "Local wiring space" (see 3.1.32 of the 2017 edition), "Main grounding terminal" (see 3.1.33 of the 2017 edition), "Network "Connected network" (see 3.1.35 of the 2017 edition), "satisfied by design" (see 3.1.36 of the 2017 edition), "parallel grounding conductor" (see 3.1.42 of the 2017 edition), "PEN conductor" (see 3.1.45 of the 2017 edition), "Stage 1" (see 3.1.58), "Phase 2" (see 3.1.59 of the 2017 edition), "Telecommunications" (see 3.1.60 of the 2017 edition), "Wall Segment" (see 3.1.61 of the 2017 edition), "Phase 2" (see 3.1.59 of the 2017 edition), "Telecommunications" (see 3.1.60 of the 20 3.1.62 of the 2015 edition) and its definitions;

--- Added the abbreviations AIM, MPO, SCP, SD, SO (see 4.1);

--- Deleted the abbreviations ACR, BN, CATV, CBN, CSA, EMC, EMS, EQP, ESD, HV, IBN, ICT, ISDN, LV, MESH-BN, MET, NEXT, NVP, ODF, PDF, PE, PEC, PMCA, RU, SPD, XML (see 2017 Version 3.2);

--- Deleted the requirements and recommendations for the planning and installation of telecommunication connection networks (see Chapter 4, Chapter 8, 2017 edition) 7.14), relevant technical contents are incorporated into GB/T 43783;

--- Added planning and installation practice requirements and recommendations for remote power supply to support the telecommunications cabling infrastructure for remote power supply (see 5.3.4, Chapter 7, 9.2.2.4, 10.2.6.3 and Appendix I);

--- Added requirements for quality planning of cabling components (see 6.2);

--- Added optical fiber cabling test parameters (see 6.3.2);

--- Added requirements for fire resistance of telecommunication cabling (see 7.2.3, 8.2.3);

--- Added requirements for transmission and terminal equipment (see 7.2.5);

--- Added open path system and open path system (see 7.6, 8.9);

--- Changed the requirements and recommendations for path and path system selection and capacity planning (see 7.6.1.2, 7.6.1.3, 2017 edition 7.6.1.2, 7.6.1.3);

--- Changed the requirements for loading and protection inside buildings, changed the maximum stacking height calculation formula and the maximum traction point spacing of the conduit (see 7.6.2.1, 7.6.2.1 of the 2017 edition);

--- Added requirements and recommendations for path systems under floors in buildings (see 7.6.2.1.5, 7.6.2.2.4) and Recommendations for system coordination (see 7.6.2.2.1);

--- Deleted the recommendations on the capacity design of the path system in the building and the maximum traction point spacing of the conduit (see the 2017 edition 7.6.2.2);

---Added planning and installation practices for the exterior of buildings, including requirements and recommendations for direct burial, factors to consider for underground paths, and Requirements for paths between building boundaries, factors to be considered for overhead paths, requirements and recommendations for installation, and racks dedicated to telecommunication cabling.

Requirements and recommendations for overhead path systems, requirements for overhead path systems shared with overhead power supply infrastructure (see 7.6.3), buildings Separation of external underground telecommunications cabling and power cabling (see 7.10) and installation complexity (see 9.2.2.2);

--- Increased space and structure inside the building (see 7.7.1.1) and telecommunications cabinets outside the building (see 8.6.1.3);

--- Added cabinets and racks containing only patch panels and cabinets and racks containing or intended to contain active equipment (see 7.8.1.4);

--- Added separation with multiple separators (see 7.9.2.1);

--- Changed the conditions for zero separation (see 7.9.2.2, 7.9.2.2 of the 2017 edition);

--- Added separation of aerial telecommunication cabling (see 7.11);

--- Added maintenance planning (see 7.12);

--- Added cable installation in manholes in buildings (see 8.9.3);

--- Changed the recommendations for maintenance procedures (see 13.2.2, 7.9.2.2 of the 2017 edition);

--- Added hardware interfaces for connecting arrays with 12 fibers per row and connecting arrays with more than 12 fibers (see Appendix A);

--- Deleted Appendices C to G of the 2017 edition, as their corresponding standards have been replaced or revoked;

--- Added Appendix C to Appendix G to support compliance with GB/T 18233.2 to GB/T 18233.6 and ISO/IEC 11801-4 Planning, installation and operation of universal cabling in specific locations;

--- Added information on the equipment accommodation environment (see Appendix H).

This document modifies ISO/IEC 14763-2:2019 "Information technology user building complex cabling implementation and operation Part 2.

Planning and Installation.

This document has the following structural adjustments compared to ISO/IEC 14763-2:2019.

--- Set an untitled bar in 7.6.3.2.5 (see 7.6.3.2.5.1 to 7.6.3.2.5.4); Set an untitled bar in 7.6.3.2.6 (see 7.6.3.2.6.1~7.6.3.2.6.3); set untitled bar in 7.6.3.2.7 (see 7.6.3.2.7.1~7.6.3.2.7.8); set Set no title bar (see 7.12.1~7.12.3);

--- Set an untitled bar in 8.6.1.3 (see 8.6.1.3.1 to 8.6.1.3.2); set an untitled bar in 8.9.1.1.1 (see 8.9.1.1.1.1 to

--- Set untitled bar in 9.2.1 (see 9.2.1.1 ~ 9.2.1.2).

The technical differences between this document and ISO/IEC 14763-2:2019 and their reasons are as follows.

--- Replaced ISO/IEC 30129 with the normative reference GB/T 43783 (see 3.1, Chapter 4, 5.3.4, 7.7.1.1.5, 7.9.1, 8.9.1.1.1, 9.2.4.1, 9.2.5.5) to adapt to my country's technical conditions;

--- Replaced ISO/IEC 11801-6 with the normative reference GB/T 18233.6 (see 3.1, 5.3.4, 7.6.3.3.2, 7.10.1, 7.11.1, Appendix G), to adapt to my country's technical conditions;

--- Replaced ISO/IEC 11801-3 with the normative reference GB/T 18233.3 (see 3.1, 5.3.4, 7.10.1, 7.11.1, Appendix D) to adapt to my country's technical conditions;

--- Replaced ISO/IEC 11801-5 with the normative reference GB/T 18233.5 (see 3.1, 5.3.4, 7.10.1, 7.11.1, 10.1.1, Appendix F) to adapt to my country's technical conditions;

--- The definition of the term "rack" (see 3.1.41) has been modified to adapt to my country's technical conditions;

--- The term "user entrance facility" (see ISO/IEC 14763-2:2019) is replaced by the term "entrance facility" (see 3.1.55).

3.1.55), because "resident entrance facilities" are not mentioned in the text;

--- Added abbreviations AC, BD, BEF, DC, LDP, MICE, SCP, SD, SO, TCL (see 3.2);

--- Deleted the abbreviations CATV, CSA, EMS, HV, LV, IS, NVP, QP, SPD, U (see ISO/IEC 14763-2:2019 3.2);

--- IEC 62305-4 (see Chapter 4) was replaced by the normative reference GB/T 21714.4 to adapt to my country's technical conditions;

--- Replaced ISO/IEC 11801-2 (see 5.3.4, 6.3.2.2, 10.1.1, Appendix C) with the normative reference GB/T 18233.2.

Adapt to the technical conditions of our country;

--- Replaced ISO/IEC 11801-1:2017 with the normative reference GB/T 18233.1-2022 (see 5.3.5.1, 6.3.1.4, 7.3, 7.9.2.2, 9.2.4.1, 10.3.1), the consistency of the two documents is modified to adapt to the technical conditions of my country;

--- Replaced ISO/IEC 14763-3 (see 6.4.2, 8.10.4, 10.3.1) with the normative reference GB/T 34961.3 to adapt to our Technical conditions of the country;

--- Replaced IEC 62368-1:2018 (see 7.2.5, 12.1) with the normative reference GB 4943.1-2022.The two documents are consistent the degree of modification is to adapt to the technical conditions of our country;

--- Replaced IEC 61537 (see 7.6.1.2.1) with the normative reference GB/T 21762 to adapt to my country's technical conditions;

--- Replaced IEC 60364-5-52 with the normative reference GB/T 16895.6 (see 7.9.2.1, 7.9.2.2, 7.14.2.1, I.3.1, I.4), to adapt to my country's technical conditions;

--- Replaced ISO/IEC 18598 (see 3.1, 9.2.2.4.1, 9.2.6.3) with the normative reference GB/T 41904 to adapt to my country technical conditions.

The following editorial changes were made to this document.

--- "Installation", "Static" and "Dynamic" are specified before the term "minimum bending radius" respectively (see 3.1.27, 3.1.28 and 3.1.29);

--- Replaced IEC 60332-1-2 with GB/T 18380.12 for informative application (see 7.2.3, 7.7.1.1.2, 8.9.2.1);

--- Replaced ISO/IEC TS29125:2017 with the informative reference GB/T 36638-2018 (see 7.14.1, 7.14.2).

Introduction

GB/T 34961 "Implementation and operation of cabling in user buildings of information technology" is intended to guide the installation, implementation, Testing, measurement and other operation processes. GB/T 34961 is compiled based on ISO/IEC 14763.According to ISO/IEC 14763, GB/T 34961 it is planned to consist of 4 parts.

--- Part 1: Management. The purpose is to guide the development of a common cabling management system.

--- Part 2: Planning and installation. The purpose is to guide the planning, installation and operation of general cabling and its infrastructure.

--- Part 3: Optical fiber cabling testing. The purpose is to guide the testing of optical fiber cabling systems.

--- Part 4: Measurement of end-to-end (E2E) links, modular plug-terminated links (MPTLs) and direct-attach cabling.

Guidelines for the performance of end-to-end (E2E) links, modular plug-terminated links (MPTLs), and direct attach cabling in general cabling Measurement.

This document does not cover signal transmission between transmitters, receivers and their associated antenna systems in open space (such as wireless, Installation of radio frequency microwave or satellite).

The following appendices are provided to support specific aspects of cabling planning and installation.

--- Appendix A. Fiber polarity maintenance. multi-fiber connection hardware;

--- Appendix B. Common infrastructure within multi-family buildings.

The requirements and recommendations in Chapters 5 to 14 of this document are independent of the building type.

Planning, installation and operation requirements are specified in Appendix C to Appendix G.

--- Appendix C. Cabling in accordance with GB/T 18233.2;

--- Appendix D. Cabling in accordance with GB/T 18233.3;

--- Appendix E. Cabling in accordance with ISO/IEC 11801-4;

--- Appendix F. Cabling in accordance with GB/T 18233.5;

--- Appendix G. Cabling in accordance with GB/T 18233.6.

Appendix H provides information on environmental ratings for spaces containing telecommunications equipment.

Appendix I provides additional information on remote powering.

Figure 1 shows the 25th Technical Committee of the First Joint Technical Committee of the International Electrotechnical Commission of the International Organization for Standardization. Information Technology

The relationship between the information technology cabling standards developed by the International Organization for Standardization (ISO/IEC JTC1/SC25) and the information technology cabling standards translated into Chinese.

Figure 1 Relationship between the information technology cabling standards developed by ISO/IEC JTC1/SC25 and those converted by my country

Implementation and operation of cabling in information technology user buildings Part 2: Planning and Installation

1 Scope

This document specifies requirements for the planning, installation and operation of telecommunications cabling and cabling infrastructure, including supporting common cabling standards and related documentation.

The requirements for cabling, paths, spaces and telecommunication connections (except those specified in GB/T 43783) of the equipment mainly specify the following aspects.

a) Installation specifications;

b) quality assurance;

c) Installation planning;

d) installation and implementation;

e) documentation;

f) management;

g) testing;

h) inspection;

i) operation;

j) maintenance;

k) Repairs.

The requirements and recommendations in Chapters 5 to 14 are not relevant to the type of building complex. Requirements and recommendations for specific building complexes are in Appendix C to Appendix G.

Make regulations.

Additionally, this document describes methods for evaluating spaces, pathways, pathway systems, and cabling (installed or planned) to support remote power delivery.

This document does not include specific requirements applicable to other cabling systems (such as power cabling); however, it takes into account the impact of other cabling systems on telecommunications.

The impact of cabling installation (and vice versa) is discussed and general recommendations are given.

This document does not cover free space communications between transmitters, receivers or their associated antenna systems (e.g. wireless, radio, microwave or satellite).

Installation aspects related to signal transmission.

This document applies to certain hazardous environments but does not exclude additional requirements applicable to special environments (such as power supply and electrified railways).

Safety and electromagnetic compatibility (EMC) requirements are specified by other standards and are outside the scope of this document.

This information helps meet these standards and regulations.

2 Normative references

The contents of the following documents constitute the essential clauses of this document through normative references in this document.

For referenced documents without a date, only the version corresponding to that date applies to this document; for referenced documents without a date, the latest version (including all amendments) applies to this document.

GB 4943.1-2022 Audio, video, information technology and communication technology equipment Part 1: Safety requirements (IEC 62368-1.

2018,MOD)

GB/T 16895.6 Low voltage electrical installations Part 5-52.Selection and installation of wiring systems for electrical equipment (GB/T 16895.6-2014, IEC 60364-5-52:2009, IDT) GB/T 18233.1-2022 Information technology user building common cabling Part 1: General requirements (ISO/IEC 11801-1:2017,MOD)

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 131 pages — is available in the English PDF.

Referenced standards

How to Download GB/T 34961.2-2024

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
131 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

GB/T 34961.2-2024

$1,970.00