Scope
GB/T 34340-2017 is the English-translated version of 燃煤烟气脱硝装备运行效果评价技术要求.
GB/T 34340-2017 sets out how the operating performance of a coal-fired flue gas denitration installation is assessed. It fixes the terms and definitions, the general rules, the assessment requirements, the assessment methods and the content of the assessment report.
It applies to selective catalytic reduction (SCR), selective non-catalytic reduction (SNCR) and combined SNCR-SCR denitration equipment on coal-fired power plant boilers, and denitration equipment in other fields may follow it as a reference.
Seven annexes give the forms to be filled in: the summary of operating results, the basic equipment information table, and the tables for environmental performance, resource and energy consumption, technical and economic performance, operation management and equipment condition. It was issued on 14 October 2017 and has applied since 1 May 2018.
Found what you need?
Document preview — GB/T 34340-2017
National Standard of the People's Republic of China
- ICS
- 13.030.40
- Classification
- J 88
Issued by: State Administration for Market Regulation; Standardization Administration of the PRC
Contents
- Preface
- 1 Scope
- 2 Normative references
- 3 Terms and definitions
- 4 General
- 5 Evaluation Requirements
- 6 Evaluation Method
- 7 Evaluation Report
- Appendix A (Normative) Coal-fired flue gas denitration equipment operating results summary table
- Appendix B (Informative) Basic information on coal-fired flue gas denitration equipment Table
- Appendix C (Normative) Coal-fired flue gas denitration equipment environmental performance evaluation Table
- Appendix D (Normative) Coal gas flue gas denitration equipment resources and energy consumption evaluation table
- Appendix E (Normative) Coal-fired flue gas denitration equipment technical and economic performance evaluation Table
- Appendix F (Normative) Coal-fired flue gas denitration equipment operation management evaluation Table
- Appendix G (Normative) Coal-fired flue gas denitration equipment condition evaluation table
Foreword
This standard was drafted in accordance with the rules given in GB/T 1.1-2009.
1 Scope
This standard specifies the terms and definitions, general rules, evaluation requirements, evaluation methods and evaluation report.
This standard applies to coal-fired power plant boiler flue gas selective catalytic reduction (SCR), selective non-catalytic reduction (SNCR), SNCR-SCR Evaluation of Operation Effect of Denitrification Equipment. Other areas of flue gas denitration equipment evaluation of the operational effect may refer to the implementation.
2 Normative references
The following documents for the application of this document is essential. For dated references, only the dated version applies to this document. For undated references, the latest edition (including all amendments) applies to this document.
GB/T 2589 general rules for calculating energy consumption
GB/T 2888 Fan and Roots blower noise measurement method
GB 8978 Integrated Wastewater Discharge Standard
Emission standard of air pollutants for thermal power plants
GB 18597 hazardous waste storage pollution control standards
GB/T 21509 coal gas flue gas denitration technology and equipment
DL/T 414 Thermal Power Plant Environmental Monitoring Technical Specifications
DL/T 260 coal-fired power plant flue gas denitration device performance acceptance test specification
DL/T 1286 Technical Specification for Performance Test of Thermal Power Plant Flue Gas Denitrification Catalyst
HJ/T 75 Technical Specification for Continuous Monitoring of Flue Gas Emission
HJ/T 76 fixed emission sources of continuous emission monitoring system technical requirements and testing methods
HJ 2040 Technical Specification for Operation and Management of Thermal Power Plant Flue Gas Treatment Facilities
JB/T 8690 industrial fan noise limits
3 Terms and definitions
GB/T 21509 defined and the following terms and definitions apply to this document.
3.1 Evaluation index
Affect the operation of coal-fired flue gas denitration equipment, the specific evaluation of the target audience, including the first-level and second-level indicators of evaluation indicators.
3.2 Environmental performance
During the operation of coal-fired flue gas denitrification equipment, it reflects the effect of nitrogen oxides (NOx) removal and its environmental impact (including waste gas, waste water, solid waste, Noise, etc.) of the evaluation index.
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 15 pages — is available in the English PDF.
Referenced standards
Normative references
- GB/T 2589General rules for calculation of the comprehensive energy consumption
- GB/T 2888Methods of noise measurement for fans blowers compressors and roots blowers
- GB 8978Integrated wastewater discharge standard
- GB 18597Standard for pollution control on hazardous waste storage
- GB/T 21509Denitration equipment of coal-fired flue gas
- DL/T 414Technical specification for environmental monitoring of thermal power plants
HJ/T 75 · HJ/T 76
How to Download GB/T 34340-2017
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
DL/T 1286-2021 — Technical specification for detection of flue gas denitrification catalysts in thermal power plants
DL/T 260-2012 — Performance checkup test code for flue gas denitration equipment of coal-fired power plants
DL/T 2600-2023 — Guidelines for operation and maintenance of coal-fired start-up boilers
Secure payment via Stripe
Payments accepted
GB/T 34340-2017
$235.00