Valid

GB/T 34148-2017Guide for calculation of water saved by projects (English PDF)

项目节水量计算导则

Preview PDF

This is a limited preview

Buy now to download the full PDF (15 pages)

Need quotation for your management?

Get a formal quotation for GB/T 34148-2017 in 30 minutes.

Issued by

SAMR; SAC

Level / Type

National · Recommended

Issue date

September 7, 2017

Implementation date

April 1, 2018

Scope

GB/T 34148-2017 is the English-translated version of 项目节水量计算导则.

GB/T 34148-2017 is the Chinese standard "Guide for calculation of water saved by projects". Its scope clause reads: This standard specifies the project terms and definitions of water-saving calculation, the general requirements and methods.

This standard applies to water-saving technological transformation projects (hereinafter referred to as "project") calculation of water-saving, new projects, water-saving management projects The calculation can be used for reference. Its clauses include terms and definitions; general requirements.

Found what you need?

Document preview — GB/T 34148-2017

National Standard of the People's Republic of China

ICS
13.060.25
Classification
F 04

Issued by: State Administration for Market Regulation; Standardization Administration of the PRC

Contents

  • 1 Scope
  • 2 Normative references
  • 3 Terms and definitions
  • 4 General requirements

1 Scope

This standard specifies the project terms and definitions of water-saving calculation, the general requirements and methods.

This standard applies to water-saving technological transformation projects (hereinafter referred to as "project") calculation of water-saving, new projects, water-saving management projects

The calculation can be used for reference.

2 Normative references

The following documents for the application of this document is essential. For dated references, only the dated version applies to this article

Pieces. For undated references, the latest edition (including all amendments) applies to this document.

GB/T 12452 business water balance test rules

GB/T 21534 industrial water-saving terms

GB 24789 water units of water measuring instruments and management of general rules

GB/T 26719 General rules of business water use

3 Terms and definitions

GB/T 12452, GB/T 21534 and GB/T 26719 and defined by the following terms and definitions apply to this document.

3.1 Project water saving

To meet the same needs or to achieve the same purpose, through the implementation of the project, the amount of water taken by the water unit relative to the reduction of unimplemented projects

A small amount.

3.2 Baseline

To compare and determine the amount of water-saving, water-saving measures before the implementation of a certain period of time.

3.3 Statistical report period

To compare and determine the amount of water-saving, water-saving measures after the implementation of a certain period of time.

3.4 Adjust water withdrawal

Water use units (enterprises), systems and equipment within the boundary of the project will be used to take water before the project is implemented, and after the conditions are calibrated according to the statistical reporting period

Get the amount of water.

4 General requirements

4.1

The calculation and statistics of water withdrawal shall comply with the requirements of GB/T 12452 and GB/T 26719.

4.2

water measuring instruments and management should be equipped with GB 24789 requirements.

4.3

According to project requirements and site conditions to determine the project boundary, all affected by water-saving measures of water units, equipment, systems (including subsidiary, […]

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 15 pages — is available in the English PDF.

Similar standards

How to Download GB/T 34148-2017

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Fast delivery

    After payment you'll receive an email confirmation. The English PDF is sent to the same address, usually within minutes and at the latest within 1 business day.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
15 pages
Fast delivery
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

GB/T 34148-2017

$145.00