GB/T 33592-2017Specification of operation and controlling for distributed resources connected to power grid (English PDF)
分布式电源并网运行控制规范
This is a limited preview
Buy now to download the full PDF (15 pages)
Need quotation for your management?
Get a formal quotation for GB/T 33592-2017 in 30 minutes.
Issued by
SAMR; SAC
Level / Type
National · Recommended
Issue date
May 12, 2017
Implementation date
December 1, 2017
Scope
GB/T 33592-2017 is the English-translated version of 分布式电源并网运行控制规范.
GB/T 33592-2017 tells grid operators and owners of distributed generation how such plant is to be run and controlled once it is connected.
It covers grid-on and grid-off control, active power control, reactive power and voltage regulation, the response to abnormal grid conditions, power quality monitoring, communication and automation, relay protection and safety automatic devices, and lightning protection and earthing, and it defines point of interconnection, point of common coupling and unintentional islanding.
Plant must hold a test report from a qualified body, with items and methods following NB/T 33011. For a unit on the public network at 10 (6) kV or at 35 kV, disconnection is required within 2 s above 110% and below 135% of rated voltage, and within 0.2 s at 135% and above. Issued on 12 May 2017, it has applied since 1 December 2017.
Found what you need?
Document preview — GB/T 33592-2017
National Standard of the People's Republic of China
- ICS
- 29.240.01
- Classification
- F 20
Issued by: State Administration for Market Regulation; Standardization Administration of the PRC
Contents
- Foreword3
- 1 Scope4
- 2 Normative references4
- 3 Terms and definitions5
- 4 Basic requirements5
- 5 Grid-on/grid-off control6
- 6 Active power control8
- 7 Reactive power regulation8
- 8 Power grid abnormal response10
- 9 Power quality monitoring11
- 10 Communication and automation12
- 11 Relay protection and safety automatic device13
- 12 Lightning protection and grounding14
Foreword
This standard was drafted in accordance with the rules given in GB/T 1.1-2009.
1 Scope
This standard specifies the operation and controlling requirements for the distributed resources connected to power grid in such aspects as on-grid/off-grid control, active power control, reactive voltage regulation, power grid abnormal response, power quality monitoring, communication and automation, relay protection and safety automatic device, and lightning protection and grounding.
This standard is suitable for the operation and controlling of the newly built, reconstructed, and extended distributed resources which are connected to the 35 kV and below voltage level power grid.
2 Normative references
The following documents are essential to the application of this document. For the dated documents, only the versions with the dates indicated are applicable to this document; for the undated documents, only the latest version (including all the amendments) are applicable to this Standard.
GB/T 12325 Power quality - Deviation of supply voltage
GB/T 12326 Power quality - Power fluctuation and flicker
GB 14050 Types and safety technical requirements of system earthing
GB/T 14549 Quality of electric energy supply - Harmonics in public supply network
GB/T 15945 Power quality - Frequency deviation for power system
GB 26859 Safety code of electric power industry - Part of electric lines
GB 26860 Safety code of electric power industry - Electric part of power plants and transformers
GB 50057 Design code for protection of structures against lightning
GB/T 50064 Code for design of overvoltage protection and insulation coordination for AC electrical installations
GB 50065 Code for grounding design of AC electrical installations
GB/T 33593-2017 Technical requirements for grid connection of distributed resources
NB/T 33011 Technical specification for distributed resources connected to power grid
NB/T 33015 Technical guideline for electrochemical energy storage system interconnecting with distribution network
3 Terms and definitions
The following terms and definitions apply to this document.
3.1 Point of interconnection
As for the distributed resources which are connected to the grid through the transformer, it refers to the bus or node at the power grid side of the transformer. As for the distributed resources which are connected to the power grid not through the transformer, it refers to the output collection point of the distributed resources.
3.2 Point of common coupling
It refers to the connection through which the user accesses to the public power grid.
3.3 Unintentional islanding
It refers to the unplanned and uncontrolled occurrence of distributed power islanding.
Note: The distributed resource islanding phenomenon refers to the self-independent operation which is composed of the distributed resources, local loads, and monitoring and controlling device which is independent of the public power grid.
4 Basic requirements
4.1 The distributed resources connected to the power grid shall have the testing report which is issued by the unit or department having corresponding qualifications, the testing items and testing methods shall comply with the provisions of NB/T 33011, AND the test results shall comply with the requirements of GB/T 33593-2017.
4.2
Before the distributed resources connected into the power grid, its operation management party and the power grid enterprise shall, in accordance with the principles of the unified scheduling and leveled
7 Reactive power regulation
7.6 As for the distributed resources connected to the 10 (6) kV ~ 35 kV user internal power grid AND transmitted electricity to the public power grid, it is preferable for it to have the reactive voltage control function. Under the conditions that the distributed resource satisfies the reactive output range and the public connection point power factor limits, the power factor and voltage at its power grid connection point are controlled; meanwhile, it is preferable to accept the reactive order from the power grid scheduling institute, AND its regulation method, reference voltage, voltage difference regulation rate, and power factor, etc., shall follow the requirements of the scheduling agreement.
7.7 As for the distributed resources connected to the 10 (6) kV ~ 35 kV public power grid, it shall participate in the power grid reactive voltage regulation within its reactive output range, AND it shall have the function of accepting the reactive voltage control order from the power grid scheduling institute. Under the conditions of satisfying with the distributed resource reactive output range AND that the voltage at the power grid connection point is qualified, the power grid scheduling unit shall perform the reactive voltage control against the distributed resources in accordance with the scheduling agreement.
8 Power grid abnormal response
8.1 As for the distributed resource directly connected to the public power grid through the 10 (6) kV voltage level AND the distributed resource connected to the power grid through the 35 kV voltage level, it shall have the low voltage ride through capability, AND the low voltage ride through amplitude and time shall comply with the requirements of GB/T 33593 -2017.
8.2 As for the distributed resource directly connected to the public power grid through the 10 (6) kV voltage level AND the distributed resource connected to power grid through the 35 kV voltage level, when the power grid connection point voltage U is above 110% of the rated voltage, it shall operate in the following methods.
a) 110% UN < U < 135% UN, the distributed resource shall be disconnected from the power grid within 2 s;
b) 135% UN <= U, the distributed resource shall be disconnected from the power grid within 0.2 s.
8.3 As for the distributed resource connected to the 220/380 V power grid AND the distributed resource connected to the user side through the 10 (6) kV voltage level, when the power grid connection point voltage U is abnormal, it shall operate in accordance with the methods as listed in Table 1; AND in case of abnormality of any phase of voltage in the three-phase system, it shall also operate in accordance with this method.
Voltage at power grid connection point Requirements U < 50% UN The distributed resource shall be disconnected from the power upload it regularly; as for the distributed resources connected to the 220/380V power grid, it shall record the power quality indicator statistical value every 10 min, AND it shall store at least 1 month of power quality data.
9 Power quality monitoring
9.2 After the distributed resource connected to the power grid, when the power quality at the public connection point does not comply with the requirements of GB/T 33593-2017, it shall produce alarm information; […]
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 15 pages — is available in the English PDF.
Referenced standards
Normative references
- GB/T 12325Power quality - Deviation of supply voltage
- GB/T 12326Power quality - Voltage fluctuation and flicker
- GB 14050Types and safety technical requirements of system earthing
- GB/T 14549Quality of electric energy supply--Harmonics inpublic supply network
- GB/T 15945Power quality - Frequency deviation for power systems
- GB 26859Safety code of electric power industry - Electric lines
GB 50065
Similar standards
How to Download GB/T 33592-2017
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
GB 14050-2008 — Types and safety technical requirements of system earthing
GB 26859-2011 — Safety code of electric power industry - Electric lines
GB 26860-2011 — Safety code of electric power industry - Electric part of power plants and transformer substations
Secure payment via Stripe
Payments accepted
GB/T 33592-2017
$321.00