Valid

GB/T 32797-2016Cogeneration systems -- Technical declarations for planning, evaluation and procurement (English PDF)

热电联产系统 用于规划、评估和采购的技术说明

Preview PDF

Also coversGBT32797-2016

This is a limited preview

Buy now to download the full PDF (21 pages)

Need quotation for your management?

Get a formal quotation for GB/T 32797-2016 in 30 minutes.

Issued by

General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China

Level / Type

National · Recommended

Issue date

August 29, 2016

Implementation date

March 1, 2017

Scope

GB/T 32797-2016 is the English-translated version of 热电联产系统 用于规划、评估和采购的技术说明.

GB/T 32797-2016 — This standard provides technical specifications for the planning, evaluation and procurement of simultaneous cogeneration systems for the provision of electricity, heat and/or cold.

This standard applies to the identification of research content in the project evaluation, the main information on CHP system assessment and cogeneration system procurement jobs.

This standard also specifies the necessary inspection items during the planning of the cogeneration system, providing a project for the realization of the project cogeneration system Reasonable configuration of the program, and contains a detailed development steps of the detailed flow chart.

Found what you need?

Document preview — GB/T 32797-2016

National Standard of the People's Republic of China

ICS
27.040
Classification
K 56

Issued by: General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China

Contents

  • Preface
  • 1 Scope
  • 2 Normative reference document
  • 3 Terms and definitions
  • 4 Key project information and assessment analysis
  • 5 CHP system assessment
  • 6 Main information and work on cogeneration system procurement
  • Appendix A (informative) Typical Cogeneration System Planning Assessment Procedure
  • Appendix B (informative) Typical life cycle cost analysis
  • Appendix C (informative) Typical cogeneration system diagram and flow chart
  • Appendix D (informative) Time period calculation method with equivalent expenditure of cogeneration system and conventional system
  • Appendix E (informative) Calculation method of total profit of power plant life cycle
  • Appendix F (informative) Information and work division of cogeneration systems
  • Reference

Foreword

This standard is drafted in accordance with the rules given in GB/T 1.1-2009.

This standard uses the translation method equivalent to ISO 26382.:2010 "Technical specification for CHP for planning, evaluation and procurement".

This standard is proposed by the China Machinery Industry Federation.

This standard is under the jurisdiction of the National Gas Turbine Standardization Technical Committee (SAC/TC259).

The drafting of this standard. Zhejiang Electric Power Design Institute, Nanjing Gas Turbine Research Institute, China United Engineering Company, Hangzhou Huadian Xiasha Thermal Power Limited company.

1 Scope

This standard provides technical specifications for the planning, evaluation and procurement of simultaneous cogeneration systems for the provision of electricity, heat and/or cold.

This standard applies to the identification of research content in the project evaluation, the main information on CHP system assessment and cogeneration system procurement jobs.

This standard also specifies the necessary inspection items during the planning of the cogeneration system, providing a project for the realization of the project cogeneration system Reasonable configuration of the program, and contains a detailed development steps of the detailed flow chart.

2 Normative reference documents

The following documents are indispensable for the application of this document. For dated references, only the dated edition applies to this article Pieces. For undated references, the latest edition (including all modifications) applies to this document.

GB/T 19829.2-2005 Oil and gas industry life cycle cost analysis Part 2. Methodology and calculation methods Application Guide (ISO 15663-2.:2001, IDT)

3 Terms and definitions

The following terms and definitions apply to this document.

Assets

The resources owned by an organization are often used to generate revenue or add value.

Auxiliary heat source and/or cold source auxiliaryheatingand/orcoolingsources Installed in the cogeneration system, on-demand additional heat and/or cooling equipment.

Such as steam boilers and/or hot water boilers, direct-fired absorption chillers/heaters and motor-driven equipment.

Availability

Within the specified time period (usually a calendar year), the CHP system generates electricity, heat and/or cold total time shares as required.

Capital expenditure Used to purchase, install and commission a capital asset.

[ISO 15663-1.:2000, definition 2.1.6] 3.5 Cogeneration system CGS at the same time as the power generation, the use of engine or prime mover exhaust, row (pumping) steam or waste heat to produce heat and/or cold facilities.

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 21 pages — is available in the English PDF.

How to Download GB/T 32797-2016

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
21 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

GB/T 32797-2016

$325.00