GB/T 32591-2016Railway applications -- Current collection systems -- Validation of simulation of the dynamic interaction between pantograph and overhead contact line (English PDF)
轨道交通 受流系统 受电弓与接触网动态相互作用仿真的验证
This is a limited preview
Buy now to download the full PDF (9 pages)
Need quotation for your management?
Get a formal quotation for GB/T 32591-2016 in 30 minutes.
Issued by
General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China
Level / Type
National · Recommended
Issue date
April 25, 2016
Implementation date
November 1, 2016
Scope
GB/T 32591-2016 is the English-translated version of 轨道交通 受流系统 受电弓与接触网动态相互作用仿真的验证.
GB/T 32591-2016 — This standard specifies the functional requirements for the following simulation models that assess the performance of the pantograph and catenary. --- input and output parameters; - the reference standard value for evaluating the results of the simulation method; Comparison of test results; Comparison between simulation methods.
This standard is applicable to the rail vehicle flow system which is in contact with the overhead contact net by the pantograph and is not suitable for rigid overhead contact systems and trolleybus system.
Found what you need?
Document preview — GB/T 32591-2016
National Standard of the People's Republic of China
- ICS
- 29.280
- Classification
- S 82
Issued by: General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China
Contents
- Preface
- 1 Scope
- 2 Normative reference document
- 3 Terms and definitions
- 4 Symbol
- 5 Basic requirements
- 6 Pantograph model
- 6.1 General requirements
- 6.2 Data requirements
- 7 Catenary model
- 7.1 General requirements
- 7.2 Data requirements
- 8 Simulation using parameter
- 9 Simulation output
- 9.1 Overview
- 9.2 Contact force
- 9.3 Contact line displacement
- 9.4 Pantograph displacement
- 9.5 Offline
- 10 Validation of measured values
- 10.1 Overview
- 10.2 Control value
- 10.3 Restrictions on Verification
- 11 Reference model
- 11.1 Use of reference model
- 11.2 Data for reference model
- 11.3 Results of the reference model
- Appendix A (informative) Reference Model Specification
Foreword
This standard is drafted in accordance with the rules given in GB/T 1.1-2009.
This standard is proposed by the National Railway Administration.
This standard is nationalized by the National Technical Committee for Traction Electrical Equipment and Systems (SAC/TC278).
The main drafting unit of this standard. China Railway Fourth Survey and Design Institute Group Co., Ltd.
This standard participates in the drafting unit. CSR Zhuzhou Electric Locomotive Co., Ltd., China Railway Electrification Survey and Design Institute Co., Ltd., China Railway Institute of Locomotive and Rolling from the Institute of Scientific Research, China Railway Fifth Survey and Design Institute Group Co., Ltd., China North Vehicle Group Datong Electric Locomotive Co., Ltd.
Any company, CSR Qingdao Quartet Locomotive & Rolling Stock Co., Ltd.
1 Scope
This standard specifies the functional requirements for the following simulation models that assess the performance of the pantograph and catenary.
--- input and output parameters;
- the reference standard value for evaluating the results of the simulation method;
Comparison of test results;
Comparison between simulation methods.
This standard is applicable to the rail vehicle flow system which is in contact with the overhead contact net by the pantograph and is not suitable for rigid overhead contact systems and trolleybus system.
2 Normative reference documents
The following documents are indispensable for the application of this document. For dated references, only the dated edition applies to this article Pieces. For undated references, the latest edition (including all modifications) applies to this document.
GB/T 21561.1-2008 Rail Transit Locomotive Vehicles Pantograph Characteristics and Tests Part 1. Trunk Locomotive Vehicles Received Bow (IEC 60494-1.:2002, IDT) GB/T 32592-2016 Requirements and Verification of Dynamic Interactions between Pantograph and Catenary in Rail Transit System
3 Terms and definitions
The following terms and definitions apply to this document.
Contact point
Skateboard and contact line between the mechanical contact point.
Contact force
The vertical force applied by the pantograph to the overhead contact is the sum of all the contact points.
Static force
Under the action of the pantograph boom device, the bow is applied upwardly to the vertical force on the contact line. At the same time the pantograph rises the locomotive is still.
[GB/T 21561.1-2008, definition 3.3.5] 3.4 Aerodynamic force an additional vertical force acting on the pantograph due to the air flow around the pantograph.
Average contact strength meanvalueofcontactforce Fm the arithmetic mean of the contact force.
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 9 pages — is available in the English PDF.
Referenced standards
How to Download GB/T 32591-2016
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
GB/T 10003-2026 — Biaxially oriented polypropylene (BOPP) film
GB/T 10004-2026 — Plastic/Plastic laminated films and pouches for packaging
GB/T 10007-2026 — Rigid cellular plastics - Determination of shear properties
Secure payment via Stripe
Payments accepted
GB/T 32591-2016
$175.00