Valid

GB/T 32270-2024Pressure piping code—Power piping (English PDF)

压力管道规范 动力管道

Open the GB/T 32270-2024 preview as PDF

Preview — first pages of GB/T 32270-2024 (full document: 87 pages)

This is a limited preview

Buy now to download the full PDF (87 pages)

Issued by

SAMR; SAC

Level / Type

National · Recommended

Issue date

April 25, 2024

Implementation date

April 25, 2024

Scope

GB/T 32270-2024 is the English-translated version of 压力管道规范 动力管道.

GB/T 32270-2024 is the Chinese national standard covering pressure piping code, Power piping. Issued on 25 April 2024, it has been in force since 25 April 2024, replacing GB/T 32270-2015.

Document preview — GB/T 32270-2024

National Standard of the People's Republic of China

ICS
23.040
Classification
J 74
Replacing
GB/T 32270-2015

Issued by: State Administration for Market Regulation; Standardization Administration of the PRC

Contents

  • PrefaceIII
  • 1 Scope1
  • 2 Normative references2
  • 3 Terms and Definitions5
  • 4 Materials8
  • 5 Design and Calculation1134
  • 6 Production and installation34
  • 7 Inspection, testing and testing57
  • 8 Safety protection66
  • 9 Insulation and anti-corrosion68
  • Appendix A (Normative) Allowable stress of materials71
  • Appendix B (Informative) Physical Properties of Common Materials77
  • Appendix C (Normative) Flexibility Factor and Stress Increase Factor82
  • Appendix D (Normative) Piping Layout88
  • Appendix E (Informative) Commonly used information for production and installation92
  • Appendix F (Normative) Pipeline prefabrication group deviation94
  • Appendix G (Normative) Calculation of safety relief devices96
  • References99

Foreword

This document is in accordance with the provisions of GB/T 1:1-2020 "Guidelines for standardization work Part 1: Structure and drafting rules for standardization documents" Drafting:

This document replaces GB/T 32270-2015 "Pressure Piping Specification - Power Piping": Compared with GB/T 32270-2015, except for the structural adjustment In addition to the integration and editorial changes, the main technical changes are as follows:

— Added some terms and definitions (see 3:28, 3:29, 3:30, 3:31, 3:32);

— Deleted some terms and definitions (see 3:21 and 3:22 of the:2015 edition);

— Deleted pipeline classification (see Chapter 4 of the:2015 edition);

— Changed the use regulations of straight seam electric fusion welded steel pipes and corresponding pipe fittings (see 4:3:1:2, 5:3:1:2 of the:2015 edition);

— Changed the relevant provisions of pipe support and hanger materials (see 4:3:2, 5:3:2 of the:2015 edition);

— Added relevant provisions for the use of chromium-containing steel materials (see 4:3:4:1);

— Deleted the "GD category" requirements for design pressure (6:1:1:2, 6:1:1:3 of the:2015 edition);

— Changed the selection requirements for pipeline components other than those listed in the standards (see 5:2:1:3, 6:2:1:3 of the:2015 edition);

— Increased the minimum wall thickness requirements for welded pipe fittings (see 5:2:1:6);

— Added material selection requirements for oil and gas pipelines within the power plant (see 5:2:2:5~5:2:2:7);

— Changed the type and size standards of flange covers (see 5:2:7:2, 6:2:7:2 of the:2015 edition);

— Changed the valve type selection provisions (see 5:2:8:5, 6:2:8:5 of the:2015 edition);

— Changed the flange type selection provisions (see 5:2:9:1, 6:2:9:1 of the:2015 edition);

— Changed the selection requirements of compensators (see 5:2:10:1, 6:2:10:1 of the:2015 edition);

— Added the requirement that "the thickness of the pipeline components should not be less than the minimum wall thickness of the straight pipe" (see 5:3:1:2);

— Changed the requirements for the value of the pipe outer diameter in the calculation formula for the minimum wall thickness of the pipe (see 5:3:2:1, 6:3:2:1 of the:2015 edition);

— Changed the branch connection form applicable to the area reinforcement method (see 5:3:4:2, 6:3:4:2 of the:2015 edition);

— Added branch pipe connection forms applicable to the pressure area method (see 5:3:4:3);

— Added the calculation formula for the elliptical shape coefficient of the ellipsoidal head and the calculation of the wall thickness (see 5:3:7:1);

— Deleted the value diagram of the correction factor K when the elliptical shape factor of the ellipsoidal head is 2 (see Figure 9 of the:2015 edition);

— Added pipeline conditions for pipeline stress calculation and accidental loads to be taken into account (see 5:4:1);

— Added the calculation method of the thrust or torque of the pipeline on the equipment or end point (see 5:4:3);

— Added the load distribution principle of the upper and lower supports of vertical pipes (see 5:5:2:3);

— Added the requirements for reserved expansion gaps for limit devices and guide devices (see 5:5:3:4~5:5:3:6);

— Added access permit requirements for production and installation units (see 6:1:3);

— Changed the requirements for acceptance of materials before fabrication or installation (see 6:2:1, 7:2:1 of the:2015 edition);

— Added the welder qualification requirements for stamping and signing the quality certificate (see 6:2:2:3, 6:4:1:3);

— Added requirements for ordering welding materials (see 6:4:2:2);

— Changed the requirements for the number of weld repairs (see 6:4:8:3, 7:4:8:3 of the:2015 edition);

— Added measurement requirements for temperature measuring instruments (see 6:5:1:5);

— Changed some residual heat methods (see 6:5:3:1, 7:5:3:1 of the:2015 edition);

— Increased insulation width requirements (see 6:6:5:1);

— Added requirements for pipeline installation, pipeline cleaning, purging and cleaning (see 6:7, 6:8);

— Changed some requirements for progressive inspection (see 7:2:1, 8:1:3 of the:2015 edition);

— Changed the batching principle for sampling inspection (see 7:2:2:1:2, 8:2:1:2 of the:2015 edition);

— Changed the requirements for the metallographic structure of weld metal and pressure test substitution (see 7:2:2:6, 7:4:2, 8:3:5:1,:2015 edition 8:5:2);

— Added requirements for non-destructive testing methods (see 7:2:3:3);

— Changed the dimension of chloride ion concentration in the test water for austenitic stainless steel (see 7:4:4, 8:5:4 of the:2015 edition);

— Changed the basic provisions for pipeline insulation and pipeline corrosion protection (see 9:1:1, 9:2:1, 10:1:1, 10:2:1 of the:2015 edition);

— Changes to the insulation materials, moisture-proof layer materials, insulation layer materials, and insulation layer thickness calculation regulations (see 9:1:2:1~9:1:2:3, 9:1:3:2, 10:1:2:1~10:1:2:3, 10:1:3:2 of the:2015 edition);

— Changed the atmospheric corrosivity and soil corrosivity classification standards (see 9:2:2:1, 9:2:2:2, 10:2:2:1,:2015 edition 10:2:2:2);

— Changed the provisions for the selection of anti-corrosion coatings (see 9:2:3:2, 10:2:3:2 of the:2015 edition);

— Changed the design requirements of the anti-corrosion layer system and the coating thickness requirements (see 9:2:4:1, 9:2:4:3, 10:2:4:1,:2015 edition 10:2:4:3);

— Changed the inspection and acceptance regulations for anti-corrosion projects (see 9:2:4:5, 10:2:4:5 of the:2015 edition);

— Changed the allowable stress of some materials (see Appendix A, Appendix A of the:2015 edition);

— Increased the allowable stress of 10Cr9MoW2VNbBN material and straight seam electric fusion welded steel pipe (see A:1);

— The flexibility coefficient and stress increase factor have been changed (see Appendix C, Appendix C of the:2015 edition);

— Added piping layout (see Appendix D):

Please note that some of the contents of this document may involve patents: The issuing organization of this document does not assume the responsibility for identifying patents:

This document is proposed and coordinated by the National Technical Committee for Standardization of Boilers and Pressure Vessels (SAC/TC262):

This document was drafted by: China Electric Power Planning and Design Association, China Electric Power Engineering Consulting Group Northeast Electric Power Design Institute Co:, Ltd:, Xi'an Thermal Engineering Research Institute Co:, Ltd:, China Electric Power Engineering Consulting Group Central South Electric Power Design Institute Co:, Ltd:, China Special Equipment Testing and Research Institute, China Electric Power Engineering Consulting Group East China Electric Power Design Institute Co:, Ltd:, Huadian Electric Power Research Institute Co:, Ltd:, China Petroleum and Chemical Exploration and Design Institute China Electric Power Design Association, China Energy Engineering Group Guangdong Electric Power Design Institute Co:, Ltd:, China Electric Power Engineering Consulting Group Southwest Electric Power Design Institute Co:, Ltd:, Henan Huadian Jinyuan Pipeline Co:, Ltd:, PowerChina Hebei Engineering Co:, Ltd:, Jiangsu Electric Power Equipment Co:, Ltd:, China Energy Zhejiang Electric Power Design Institute Co:, Ltd: of China Energy Engineering Group, Henan Electric Power Survey and Design Institute Co:, Ltd: of China Power Engineering Group, China Energy Engineering Group Jiangsu Electric Power Design Institute Co:, Ltd:, China Nuclear Power Planning and Design Institute Co:, Ltd:, Harbin Boiler Plant Co:, Ltd:, Germany New Steel Pipe (China) Co:, Ltd: and Shanghai Feiting Pipe Manufacturing Co:, Ltd:

The main drafters of this document are: Pei Yufeng, Gao Hong, Guo Xiaoke, Zhao Hongpeng, Zhou Rongcan, Li Jun, Huang Zhenglin, Kang Yujun, Ye Fei, Liu Qijun, Xu Yuxin, Lin Lei, Guo Yanjun, Deng Chenggang, Chen Bao, Wu Bin, Zhao Leqiang, Li Shiyu, Mao Min, Yang Wenjia, He Pengchen, Chen Zhihua, Yang Qiang, Xu Hongbo, Cheng Zutian, Yu Qiang, Zhang Fengshou, Xiang Kui, Ma Honglian, You Zihan, Chen Shan, Li Rui, Li Yanfeng, Xu Hanshen, Wang Honghai, Xu Hui:

This document was first published in:2015 and this is the first revision:

1 Scope

This document specifies the materials, design, production, installation, inspection, testing, installation and maintenance of steam and water pipelines within the boundary of a thermal power plant:

Basic requirements for full protection, thermal insulation and corrosion prevention: Other pressure pipelines within the boundary of thermal power plants shall comply with GB/T 20801 (all parts):

This document does not apply to:

a) Boiler main body pipeline;

b) Nuclear power plant piping;

c) Heating, ventilation and air conditioning ducts and ducts with non-circular cross-sections;

d) Pipes for various towers, building structures, storage tanks, mechanical equipment and instruments;

e) Non-metallic pipes:

The boundaries between the pipelines specified in this document and the pipelines within the boiler body are shown in Figures 1 and 2: Description of index symbols:

— Boiler main pipes shall be managed in accordance with TSG11;

— Boiler external piping and joints (i:e: steam, water piping and joints specified in Chapter 1), boiler-wide piping design in accordance with TSG11 Take into account the calculations referred to in this document;

— Non-boiler external pipes and joints:

Figure 1: Pipeline boundary management connected to once-through boiler

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 87 pages — is available in the English PDF.

Editions of GB/T 32270

EditionTitleRevisionStatus
GB/T 32270-2024Pressure piping code - Power pipingcurrent editionCurrent

This page sells the current edition, GB/T 32270-2024. Earlier editions are listed for reference only.

How to Buy GB/T 32270-2024

  1. 1Add to cart. Click the "Buy GB/T 32270-2024" button on this page. You can add more standards before checkout.
  2. 2Checkout. Enter your email and billing details. Payment is processed securely by Stripe (cards, Apple Pay, Google Pay supported).
  3. 3Instant delivery (0–9 sec). Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
  4. 4Invoice included. A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
87 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

GB/T 32270-2024

$1,565.00

$1,330.00for partners