GB/T 31348-2014Technical requirements of measurement and verification of energy savings—Lighting system (English PDF)
节能量测量和验证技术要求 照明系统
This is a limited preview
Buy now to download the full PDF (15 pages)
Need quotation for your management?
Get a formal quotation for GB/T 31348-2014 in 30 minutes.
Issued by
SAMR; SAC
Level / Type
National · Recommended
Issue date
December 31, 2014
Implementation date
July 1, 2015
Scope
GB/T 31348-2014 is the English-translated version of 节能量测量和验证技术要求 照明系统.
GB/T 31348-2014 is the Chinese standard "Technical requirements of measurement and verification of energy savings—Lighting system".
Its scope clause reads: This standard specifies the lighting system energy savings measurement and verification of energy consumption statistics and border demarcation project scope, basic requirements, measurement and verification Methods and measurement and verification programs.
This standard applies to the measurement and verification of energy-saving technological transformation projects indoor and outdoor lighting system energy savings.
This standard does not apply to landscape lighting retrofit projects and renovation projects lighting purposes or illuminated area before and after the change. Its clauses include terms and definitions.
Found what you need?
Document preview — GB/T 31348-2014
National Standard of the People's Republic of China
- ICS
- 27.010
- Classification
- F 01
Issued by: State Administration for Market Regulation; Standardization Administration of the PRC
Contents
- 1 Scope
- 2 Normative references
- 3 Terms and Definitions
- 3.1 Lighting system
- 4.1 Item border demarcation
1 Scope
This standard specifies the lighting system energy savings measurement and verification of energy consumption statistics and border demarcation project scope, basic requirements, measurement and verification
Methods and measurement and verification programs.
This standard applies to the measurement and verification of energy-saving technological transformation projects indoor and outdoor lighting system energy savings.
This standard does not apply to landscape lighting retrofit projects and renovation projects lighting purposes or illuminated area before and after the change.
2 Normative references
The following documents for the application of this document is essential. For dated references, only the dated version suitable for use herein
Member. For undated references, the latest edition (including any amendments) applies to this document.
GB/T 5700-2008 illumination measurement method
GB 17167-2006 energy use per unit of energy measuring instruments and General Manager
GB/T 28750-2012 energy section measurement and verification techniques General
GB 50034 architectural lighting design standards
GB 50582 outdoor job site lighting design standards
CJJ45 city road lighting design standards
JGJ/T 163 urban landscape lighting design specifications
JTG/T D70 highway tunnel design Details
3 Terms and Definitions
GB/T 5700-2008, GB/T 28750-2012 define the following terms and definitions apply to this document.
3.1 Lighting system
To illuminate for the purpose by the general lights, lighting and control systems, centralized or semi-centralized lighting composition.
4 border demarcation project scope and power consumption statistics
4.1 Item border demarcation
Lighting system should be based on site conditions and energy-saving lighting system project content, reasonably determine the boundaries of lighting systems, typically include
Lamps, lighting and control systems, as shown in FIG.
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 15 pages — is available in the English PDF.
Similar standards
How to Download GB/T 31348-2014
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Fast delivery
After payment you'll receive an email confirmation. The English PDF is sent to the same address, usually within minutes and at the latest within 1 business day.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
GB/T 10003-2026 — Biaxially oriented polypropylene (BOPP) film
GB/T 10004-2026 — Plastic/Plastic laminated films and pouches for packaging
GB/T 10007-2026 — Rigid cellular plastics - Determination of shear properties
GB/T 31348-2014
$145.00