Valid

GB/T 31185-2014Technical requirements of tubular goods manufacturing consulting service for oil and gas pipeline project (English PDF)

石油天然气管道工程用管材制造监理技术要求

Preview PDF

This is a limited preview

Buy now to download the full PDF (15 pages)

Need quotation for your management?

Get a formal quotation for GB/T 31185-2014 in 30 minutes.

Issued by

SAMR; SAC

Level / Type

National · Recommended

Issue date

September 3, 2014

Implementation date

October 1, 2014

Scope

GB/T 31185-2014 is the English-translated version of 石油天然气管道工程用管材制造监理技术要求.

GB/T 31185-2014 is the Chinese standard "Technical requirements of tubular goods manufacturing consulting service for oil and gas pipeline project". Its scope clause reads: This standard specifies the basic technical requirements of oil and gas pipeline engineering pipe manufacturing quality-related equipment supervision.

This standard applies to oil and gas pipeline projects with steel pipes, pipe fittings and pipe corrosion polyethylene manufacturing supervision. Its clauses include terms and definitions.

Found what you need?

Document preview — GB/T 31185-2014

National Standard of the People's Republic of China

ICS
03.080.99
Classification
A 20

Issued by: State Administration for Market Regulation; Standardization Administration of the PRC

Contents

  • 1 Scope
  • 2 Normative references
  • 3 Terms and Definitions
  • 3.1 Manufacturing supervision
  • 3.2 Witness testimony
  • 3.3 File witness point recordpoint
  • 3.4 Witness point
  • 3.5 Stop witness point holdpoint

1 Scope

This standard specifies the basic technical requirements of oil and gas pipeline engineering pipe manufacturing quality-related equipment supervision.

This standard applies to oil and gas pipeline projects with steel pipes, pipe fittings and pipe corrosion polyethylene manufacturing supervision.

2 Normative references

The following documents for the application of this document is essential. For cited documents with dates, only the dated edition applies to this document.

For undated references, the latest edition (including any amendments) applies to this document.

GB/T 26429-2010 Equipment Project Management Regulation

3 Terms and Definitions

GB/T 26429-2010 and as defined in the following terms and definitions apply to this document.

3.1 Manufacturing supervision

The firm should accept the commission principal, according to the contract of specialized equipment manufacturing process supervision and management services.

3.2 Witness testimony

Equipment supervision personnel files, records, entities, processes and other physical activities to observe, examine, record, confirmation testimony activities.

[GB/T 26429-2010, the definition 3.13]

3.3 File witness point recordpoint

R point

Engineer by the device of the relevant files on your device works, records or reports, witness and supervision preset control point.

[GB/T 26429-2010, the definition 3.14]

3.4 Witness point

W Point

By the supervising engineer for process equipment, process, or result of node equipment construction site witness previously set supervision control points.

[GB/T 26429-2010, the definition 3.15]

3.5 Stop witness point holdpoint

H point

Before witnessed by the device into the Engineer and signed off after the next process step or node preset Supervision control point.

[GB/T 26429-2010, the definition 3.16] […]

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 15 pages — is available in the English PDF.

Similar standards

How to Download GB/T 31185-2014

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
15 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

GB/T 31185-2014

$205.00