GB/T 30944-2014Guide for energy losses calculation of small hydropower grid (English PDF)
小水电电网电能损耗计算导则
This is a limited preview
Buy now to download the full PDF (16 pages)
Need quotation for your management?
Get a formal quotation for GB/T 30944-2014 in 30 minutes.
Issued by
Standardization Administration of China
Level / Type
National · Recommended
Issue date
July 8, 2014
Implementation date
January 19, 2015
Scope
GB/T 30944-2014 is the English-translated version of 小水电电网电能损耗计算导则.
GB/T 30944-2014 — This standard gives small hydropower grid power loss calculation and analysis. This standard applies to power loss small hydro power based small hydropower grid computing, calculating statistics, analysis and loss reduction effect.
Found what you need?
Document preview — GB/T 30944-2014
National Standard of the People's Republic of China
- ICS
- 29.160.20
- Classification
- K 20
Issued by: Standardization Administration of China
Contents
- Preface
- 1 Scope
- 1 2 General
- 2.1 Calculation Principle
- 2.2 Basic Information
- 2.3 Option 1 is the day of
- 2.4 1 representative of daily load record
- 3 Element 1 Loss Calculation
- 3.1 Line Energy Loss Calculation
- 3.2 Transformer power loss calculation
- Power consumption 3.3 capacitors and other components of the calculation
- 3.4 Total power loss is the day of the grid
- Annual loss of electricity grid 3.5
- 4 Grid energy loss calculation
- 4.1 35kV grid power and loss calculation above
- 4.2 10kV (20kV) grid power loss calculation
- 4.3 380V/220V grid power loss calculation
- 5 Energy Loss Analysis
Foreword
This standard was drafted in accordance with GB/T 1.1-2009 given rules.
This standard is proposed and managed by the Ministry of Water Resources.
This standard by the Ministry of Water Resources Research Institute for Rural Electrification is responsible for drafting.
1 Scope
This standard gives small hydropower grid power loss calculation and analysis.
This standard applies to power loss small hydro power based small hydropower grid computing, calculating statistics, analysis and loss reduction effect.
2 General
2.1 Calculation Principle
SHP grid power loss should include the sum of the elements of the grid power loss, power loss SHP grid shall be calculated in the transmission and distribution Calculated on the basis of the elements of power grid loss of lines, transformers, compensation and adjustment of equipment as well as measurement and protection devices.
2.2 Basic Information
SHP electricity grid losses should be calculated on the basis of collected basic information on the following.
Power plants, substations and run wiring diagram grid; parameter data transformers, lines, condensers, capacitors, reactors and other elements of the package Including nameplate data, measured data as well as the active power of each network element, reactive power and current, voltage and other parameters.
Parameter distribution lines each segment; nameplate parameters of distribution transformers; substation and power plants on behalf of the outlet end of May and August with load song Line, active power, reactive power and voltage curves; users and public distribution transformers and distribution transformers is the day of the full month of active power, reactive power Electricity; capacity and location of the distribution line capacitor means and a full month into operation time.
2.3 Days to choose representatives
Chosen to represent the date according to the following principles.
a) Run small hydropower grid, flow distribution can represent the calculation of normal;
b) date is the day of the power supply, close to the calculated period (month, quarter, year) average daily power supply;
c) the user's electricity situation is normal, weather conditions, the temperature close to the calculation of the average temperature;
d) to be able to represent the calculation period (month, quarter, year) wet season, dry season various load conditions, select 3-4 representatives of days.
2.4 Representative daily load record
Representative daily load shall be complete and meet the computing needs, should include the whole point 24h power plants, substations, lines and other output current, output A current, active power, reactive power, voltage, and power sub-period day record, and draw the daily load curve by the hour record.
3 Loss calculation element
3.1 Line Energy Loss Calculation
Energy Loss Calculation line with its daily load curve is based on RMS current method can be used, the average current, maximum forward current method Line calculation, method, see Appendix A.
3.2 Transformer power loss calculation
The power loss of the transformer should include no-load loss and load loss of electricity power.
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 16 pages — is available in the English PDF.
How to Download GB/T 30944-2014
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
GB/T 10003-2026 — Biaxially oriented polypropylene (BOPP) film
GB/T 10004-2026 — Plastic/Plastic laminated films and pouches for packaging
GB/T 10007-2026 — Rigid cellular plastics - Determination of shear properties
Secure payment via Stripe
Payments accepted
GB/T 30944-2014
$265.00