Valid

GB/T 29873-2013Protocol for data communication of energy metrology data public platform (English PDF)

能源计量数据公共平台数据传输协议

Preview PDF

This is a limited preview

Buy now to download the full PDF (21 pages)

Need quotation for your management?

Get a formal quotation for GB/T 29873-2013 in 30 minutes.

Issued by

SAMR; SAC

Level / Type

National · Recommended

Issue date

November 12, 2013

Implementation date

April 15, 2014

Scope

GB/T 29873-2013 is the English-translated version of 能源计量数据公共平台数据传输协议.

GB/T 29873-2013 is the Chinese standard "Protocol for data communication of energy metrology data public platform". Its scope clause reads: This standard specifies the energy measurement data on the public internet data transfer protocol common platform architecture, protocol layers and protocols.

This standard applies to energy metering data on the public platform in data centers and energy metering data using units of energy-intensive collection terminal Data exchange between transmissions. Its clauses include terms, definitions and abbreviations.

Found what you need?

Document preview — GB/T 29873-2013

National Standard of the People's Republic of China

ICS
27.010
Classification
F 01

Issued by: State Administration for Market Regulation; Standardization Administration of the PRC

Contents

  • 1 Scope
  • 2 Normative references
  • 3 Terms, Definitions and Abbreviations
  • 4 platform structure
  • 5 protocol level
  • 6 Communication Protocol
  • 6.1 Communication Scheme
  • 6.2 protocol data structures
  • 6.3 code defines
  • 6.4 timeout retransmission mechanism
  • Appendix A (normative) cyclic redundancy check (CRC) algorithm
  • Appendix B (Normative Appendix) RSA encryption algorithm
  • Annex C (normative) common energy unit of measure and code definition
  • Annex D (informative) communication process Example 14 each instruction

1 Scope

This standard specifies the energy measurement data on the public internet data transfer protocol common platform architecture, protocol layers and protocols.

This standard applies to energy metering data on the public platform in data centers and energy metering data using units of energy-intensive collection terminal

Data exchange between transmissions.

2 Normative references

The following documents for the application of this document is essential. For dated references, only the dated version suitable for use herein

Member. For undated references, the latest edition (including any amendments) applies to this document.

GB 17167 energy use per unit of energy measuring instruments and General Manager

HJ/T 212-2005 pollution-line automatic monitoring (monitoring) system data transmission standards

3 Terms, definitions and abbreviations

3.1 Terms and Definitions

GB 17167 and HJ/T 212-2005 defined by the following terms and definitions apply to this document.

3.1.1 Energy Metering

Installed in the energy unit of energy measurement instruments, measuring a variety of energy measurement data, and has a network communication function.

3.1.2 Centralized data collection terminal

Installed using units (industrial enterprises), through an internal network connection and energy measuring instruments, access to a variety of energy metering data, completion

Data accumulation, storage, and has a data transfer capabilities of the remote device data via the Internet.

3.1.3 Energy Data Center

Computer information terminal equipment and computer software, etc., via a communication network with centralized data collection terminal connection to exchange data;

Initiate and reply command, data storage, processing, analysis and application systems.

3.1.4 Energy measurement data on the public platform

Energy from the data center energy use per unit of energy metering data collection terminals and centralized energy metering instrumentation components, used in the government's energy meter

The amount of data collected online, real-time monitoring and other public services.

3.1.5 Offline data

Due to a power outage or network failure and other reasons, resulting in centralized data collection terminal center communication and energy data has not been transmitted to the interrupt generation can

Data source data center.

3.2 Acronyms

The following abbreviations apply to this document.

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 21 pages — is available in the English PDF.

Referenced standards

Similar standards

How to Download GB/T 29873-2013

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
21 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

GB/T 29873-2013

$375.00