GB/T 28799.2-2020Heat-resistant polyethylene (PE-RT) piping system for hot and cold water - Part 2: Pipes (English PDF)
Also coversGBT28799.2-2020
Open the GB/T 28799.2-2020 preview as PDF
This is a limited preview
Buy now to download the full PDF
Issued by
State Administration for Market Regulation, China National Standardization Administration
Level / Type
National · Recommended
Issue date
November 19, 2020
Implementation date
June 1, 2021
Scope
GB/T 28799.2-2020 (Heat-resistant polyethylene (PE-RT) piping system for hot and cold water - Part 2: Pipes) is available as an English-translated PDF.
GB/T 28799.2-2020 — This part of GB/T 28799 specifies the terms, definitions, symbols and abbreviations of heat-resistant polyethylene (PE-RT) pipes (hereinafter referred to as "pipes") Abbreviations, materials, product classification, selection of tube series S, requirements, system applicability, test methods, inspection rules, signs, packaging, transportation and Store. This part, together with other parts of GB/T 28799, is applicable to cold and hot water piping systems, including cold and hot water, drinking water for civil and industrial buildings. Water and heating system, hot spring pipeline system and central heating secondary pipe network system, etc. This section applies to PE-RTI and PE-RTII pipes. The PE-RTI pipes in this section are not suitable for hot spring piping systems and central heating secondary pipe network systems. Note. It is the responsibility of the purchaser to select this product appropriately according to its specific application requirements, combined with relevant regulations, standards or specifications.
Document preview — GB/T 28799.2-2020
National Standard of the People's Republic of China
- Classification
- G 33
- Replacing
- GB/T 28799.2-2012
Issued by: State Administration for Market Regulation, China National Standardization Administration
Contents
- Foreword
- 1 Scope
- 2 Normative references
Foreword
GB/T 28799 "Heat-resistant Polyethylene (PE-RT) Piping System for Hot and Cold Water" is divided into the following parts.
---Part 1.General Provisions;
---Part 2.Pipes;
---Part 3.Pipe fittings;
---Part 5.System applicability.
This part is Part 2 of GB/T 28799.
This section was drafted in accordance with the rules given in GB/T 1.1-2009.
This part replaces GB/T 28799.2-2012 "Heat-resistant polyethylene (PE-RT) piping system for cold and hot water-Part 2.Pipes", and
Compared with GB/T 28799.2-2012, the main technical changes are as follows.
---Modified the scope of application of the piping system (see Chapter 1, Chapter 1 of the.2012 edition);
--- Added a trade "note" (see Chapter 1);
---Relevant normative references have been revised (see Chapter 2, Chapter 2 of the.2012 edition);
--- Added "Terms, Definitions, Symbols and Abbreviations" (see Chapter 3);
---Modified the material regulations (see Chapter 4, Chapter 3 of the.2012 edition);
---Modified product classification (see Chapter 5, Chapter 4 of the.2012 edition);
---Modified the selection of tube series S (see Chapter 6, Chapter 4 of the.2012 edition);
---Modified the color regulations (see 7.1, 5.1 of the.2012 edition);
---Expanded the outer diameter size range of the pipe (see Table 3, Table 3 of the.2012 edition);
---Modified the wall thickness allowable deviation table (see Table 4,.2012 edition of Table 4);
---Added the regulation of pipe length (see 7.3.3);
---Increase the ash content, oxidation induction time of the pipe and the oxidation induction time and pigment content after the 95 degrees C/1000h hydrostatic test
The requirements for dispersion and slow crack growth resistance have been modified to express the requirements for oxygen permeability (see Table 6,.2012 edition of Table 6);
---Adjust the system applicability into a separate chapter, and delete the specific content of the system applicability requirements (see Chapter 8,.2012 edition of 5.7);
---Modified the test method (see Chapter 9, Chapter 6 of the.2012 edition);
---Modified the group batch (see 10.2.1, 7.2.1 of the.2012 edition);
---Modified the grouping (see 10.2.2, 7.2.2 of the.2012 edition);
---Modified the requirements for type inspection (see 10.3, 7.3 of the.2012 edition);
---Modified the item requirements of factory inspection (see 10.4.1, 7.4.1 of.2012 edition);
---Modified the batch range of the sampling plan (see 10.4.2, 7.4.2 of the.2012 edition);
---Modified the requirements for type inspection (see 10.5, 7.5 in the.2012 edition);
---Modified the judgment rules (see 10.6,.2012 edition of 7.6);
---Modified the content of the logo (see 11.1, 8.1 in the.2012 edition);
---Amended the content of Appendix A, and changed "Calculation of allowable working pressure of pipes" to "Derivation of calculated value of maximum pipe series" (see
Appendix A, Appendix A of the.2012 edition).
This part uses the redrafting method to refer to ISO 22391-2.2009 "Heat-resistant Polyethylene (PE-RT) for Plastic Piping Systems for Cold and Hot Water"
Part 2.Pipes", the degree of consistency with ISO 22391-2.2009 is not equivalent.
Please note that some contents of this document may involve patents. The issuing agency of this document is not responsible for identifying these patents.
This part was proposed by the China National Light Industry Council.
This part is under the jurisdiction of the National Plastic Products Standardization Technical Committee (SAC/TC48).
Drafting organizations of this section. Yonggao Co., Ltd., Shanghai Baidie Pipe Industry Technology Co., Ltd., Zibo Jielin Plastic Pipe Co., Ltd.
Company, Chengdu Chuanlu Plastic Group Co., Ltd., Baolu Qixing Pipe Industry Co., Ltd., Rifeng Enterprise Group Co., Ltd., Zhejiang Weixing New Building Materials Co., Ltd.
Co., Ltd., Guangdong Liansu Technology Industrial Co., Ltd., Wuhan Jinniu Economic Development Co., Ltd., Akcome Enterprise Group (Shanghai) Co., Ltd.,
Zhejiang Zhongcai Pipeline Technology Co., Ltd., Hongyue Plastic Group Co., Ltd., Ningxia Qinglong Plastic Pipe Co., Ltd., Hebei Shengli
Plastic Industry Co., Ltd., Total Petrochemical (Shanghai) Co., Ltd., Beijing Building Materials Inspection and Research Institute Co., Ltd.
1 Scope
This part of GB/T 28799 specifies the terms, definitions, symbols and abbreviations of heat-resistant polyethylene (PE-RT) pipes (hereinafter referred to as "pipes")
Abbreviations, materials, product classification, selection of tube series S, requirements, system applicability, test methods, inspection rules, signs, packaging, transportation and
Store.
This part, together with other parts of GB/T 28799, is applicable to cold and hot water piping systems, including cold and hot water, drinking water for civil and industrial buildings.
Water and heating system, hot spring pipeline system and central heating secondary pipe network system, etc.
This section applies to PE-RTI and PE-RTII pipes.
The PE-RTI pipes in this section are not suitable for hot spring piping systems and central heating secondary pipe network systems.
Note. It is the responsibility of the purchaser to select this product appropriately according to its specific application requirements, combined with relevant regulations, standards or specifications.
2 Normative references
The following documents are indispensable for the application of this document. For dated reference documents, only the dated version applies to this document.
For undated references, the latest version (including all amendments) applies to this document.
GB/T 2828.1 Sampling inspection procedure by attributes Part 1.Batch inspection sampling plan retrieved by acceptance quality limit (AQL)
(GB/T 2828.1-2012, ISO 2859-1.1999, IDT)
GB/T 2918 Standard environment for condition adjustment and testing of plastic specimens (GB/T 2918-2018, ISO 291.2008, MOD)
GB/T 3682.1 Plastic thermoplastic melt mass flow rate (MFR) and melt volume flow rate (MVR) measurement
Part 1.Standard Method (GB/T 3682.1-2018, ISO 1133-1.2011, MOD)
GB/T 6111-2018 Determination of internal pressure resistance of thermoplastic piping systems for fluid transportation
GB/T 6671 Thermoplastic pipe longitudinal shrinkage determination (GB/T 6671-2001, eqvISO 2505.1994)
GB/T 8806 Plastic piping system plastic parts size determination (GB/T 8806-2008, ISO 3126.2005, IDT)
GB/T 9345.1 Determination of Ash in Plastics Part 1.General Method (GB/T 9345.1-2008, ISO 3451-1.1997, IDT)
GB/T 17219 Safety evaluation standard for drinking water distribution equipment and protective materials
GB/T 18251 Determination of pigment or carbon black dispersion in polyolefin pipes, pipe fittings and mixtures (GB/T 18251-2019,
ISO 18553.2002, MOD)
GB/T 18476 Polyolefin pipes for fluid transport-Determination of resistance to crack growth. Test method for slow crack growth (notch test
Test) (GB/T 18476-2019, ISO 13479.2009, MOD)
GB/T 19278-2018 General terms and definitions for thermoplastic pipes, fittings and valves
GB/T 19466.6 Plastic Differential Scanning Calorimetry (DSC) Part 6.Oxidation Induction Time (Isothermal OIT) and Oxidation Induction
Determination of temperature (dynamic OIT) (GB/T 19466.6-2009, ISO 11357-6.2008, MOD)
GB/T 21300 Determination of the opacity of plastic pipes and fittings (GB/T 21300-2007, ISO 7686.2005, IDT)
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — all pages — is available in the English PDF.
Referenced standards
Normative references
- GB/T 2828.1Sampling procedures for inspection by attributes - Part 1: Sampling schemes indexed by acceptance quality limit (AQL) for lot-by-lot inspection
- GB/T 2828.1-2012Sampling procedures for inspection by attributes - Part 1: Sampling schemes indexed by acceptance quality limit (AQL) for lot-by-lot inspection
- GB/T 17219Hygienic safety evaluation of distribution equipment, protective materials and treatment materials in drinking water system
- GB/T 19278-2018General terms and their definitions of thermoplastic pipes, fittings and valves
ISO 2859 · GB/T 2918 · GB/T 2918-2018 · ISO 291.2008 · GB/T 3682.1 · GB/T 3682.1-2018 · ISO 1133 · GB/T 6111-2018 · GB/T 6671 · GB/T 6671-2001 · GB/T 8806 · GB/T 8806-2008 · ISO 3126.2005 · GB/T 9345.1 · GB/T 9345.1-2008 · ISO 3451 · GB/T 18251 · GB/T 18251-2019 · ISO 18553.2002 · GB/T 18476 · GB/T 18476-2019 · ISO 13479.2009 · GB/T 19466.6 · GB/T 19466.6-2009 · ISO 11357 · GB/T 21300 · GB/T 21300-2007 · ISO 7686.2005
How to Buy GB/T 28799.2-2020
- 1Add to cart. Click the "Buy GB/T 28799.2-2020" button on this page. You can add more standards before checkout.
- 2Checkout. Enter your email and billing details. Payment is processed securely by Stripe (cards, Apple Pay, Google Pay supported).
- 3Instant delivery (0–9 sec). Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4Invoice included. A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
GB/T 17219-2025 — Hygienic safety evaluation of distribution equipment, protective materials and treatment materials in drinking water system
GB/T 19278-2018 — General terms and their definitions of thermoplastic pipes, fittings and valves
GB/T 2828.1-2012 — Sampling procedures for inspection by attributes - Part 1: Sampling schemes indexed by acceptance quality limit (AQL) for lot-by-lot inspection
Secure payment via Stripe
Payments accepted
GB/T 28799.2-2020
$245.00