GB/T 28545-2023Directives for rehabilitation and performance improvement for hydraulic turbines, storage pumps and pump-turbines (English PDF)
水轮机、蓄能泵和水泵水轮机更新改造和性能改善导则
This is a limited preview
Buy now to download the full PDF (110 pages)
Need quotation for your management?
Get a formal quotation for GB/T 28545-2023 in 30 minutes.
Issued by
State Administration for Market Regulation, China National Standardization Administration
Level / Type
National · Recommended
Issue date
December 28, 2023
Implementation date
July 1, 2024
Scope
GB/T 28545-2023 is the English-translated version of 水轮机、蓄能泵和水泵水轮机更新改造和性能改善导则.
GB/T 28545-2023 — This document applies to the following types of turbines, storage pumps and pump turbines: ---Mixed flow type; ---Axial flow type; ---Through-flow type; ---Water bucket type: This document gives information on other aspects of the power plant building that may affect or be affected by the modification of turbines, storage pumps and water pump turbines: equipment, but not discussed in detail: The purpose of this document is to assist in the identification, evaluation and implementation of retrofit and performance improvement projects for turbines, storage pumps and pump turbines: This operation is applicable to owners, consulting units and suppliers to determine the following matters: ---Demand and economic analysis of renovation and performance improvement; ---The scope of work for renewal and transformation; ---skills requirement; ---effect evaluation: The purpose of this document is as follows: --- Provide assistance in the decision-making process; ---Provide information resources for transformation; ---Identify major issues during the transformation process; ---Identify key points in the transformation process:
Found what you need?
Document preview — GB/T 28545-2023
National Standard of the People's Republic of China
- ICS
- 27.140
- Classification
- K 55
- Replacing
- GB/T 28545-2012
Issued by: State Administration for Market Regulation, China National Standardization Administration
Contents
- Preface
- 1 Scope
- 2 Normative references
- 3 Terms and Definitions
- 4 Abbreviations
- 5 Reasons for Renovation
- 5.1 Overview
- 5.2 Improving reliability and availability
- 5.3 Repair performance and extended service life
- 5.4 Performance improvements
- 5.5 Improving power station safety
- 5.6 Environmental, social and management issues
- 5.7 Reduce maintenance and operating costs
- 5.8 Other issues to consider
- 6 Renovation work content
- 6.1 Collection and evaluation of data
- 6.1.1 Data collection
- 6.1.2 Data evaluation
- 6.2 Determination of plan
- 6.2.1 General
- 6.2.2 Determination of the transformation scope of various comparison options
- 6.2.3 Cost determination of comparison options
- 6.2.4 Determination of the schedule of the comparison plan
- 6.2.5 Determination of benefits of comparison options
- 6.2.6 Risk management of comparison options
- 6.2.7 Economic analysis of alternative options
- 6.3 Contract terms
- 6.3.1 Overview
- 6.3.2 Technical specifications
- 6.3.3 Tendering and bid evaluation
- 6.3.4 Contract Award
- 6.4 Project implementation
- 6.4.1 Model test
- 6.4.2 Design, construction, installation and testing 10
- 6.5 Compliance assessment of transformation results and guaranteed values
- 6.5.1 Overview
- 6.5.2 Turbine performance evaluation
- 6.5.3 Generator performance evaluation
- 6.5.4 Assessment of penalties and/or rewards 11
- 6.6 Transformation progress, cost analysis and risk analysis 11
- 6.6.1 Schedule
- 6.6.2 Economic and Financial Analysis
- 6.6.3 Sensitivity analysis
- 6.6.4 Conclusion
- 6.7 Risk Analysis
- 6.7.1 General
- 6.7.2 Risk of not achieving expected performance 17
- 6.7.3 Risks of continuing operation without modification 17
- 6.7.4 Risk of extended downtime 17
- 6.7.5 Financial risk 18
- 6.7.6 Project Scope Risks 18
- 6.7.7 Other risks 18
- 7 Assessment and decision-making of the scope of renovation work
- 7.1 Overview
- 7.2 Assessment of hydropower station site conditions
- 7.2.1 Hydrology
- 7.2.2 Actual power generation
- 7.2.3 Environmental, social and related regulations 20
- 7.3 Turbine evaluation
- 7.3.1 General
- 7.3.2 Overall assessment of turbine
- 7.3.3 Turbine performance evaluation
- 7.4 Evaluation and decision-making of unit-related equipment
- 7.4.1 General
- 7.4.2 Generator and thrust bearing
- 7.4.3 Turbine speed regulator
- 7.4.4 Turbine inlet and outlet valves and pressure relief valves
- 7.4.5 Auxiliary equipment
- 7.4.6 Equipment for installation, disassembly and maintenance
- 7.4.7 Penstock and other water passages
- 7.4.8 Impact of changes in water head of power station
- 7.4.9 Power Grid
- 8 Hydraulic design and performance test
- 8.1 General
- 8.2 Hydraulic design calculation
- 8.2.1 General
- 8.2.2 The role of CFD
- 8.2.3 Steps 46 of the CFD cycle
- 8.2.4 Accuracy of CFD calculations
- 8.2.5 How to apply CFD in renovation
- 8.2.6 Comparison of CFD and model testing
- 8.3 Model test
- 8.3.1 Overview
- 8.3.2 Similarity of model tests
- 8.3.3 Model test content
- 8.3.4 Application of model testing
- 8.3.5 Model test location
- 8.4 Prototype performance test
- 8.4.1 Overview
- 8.4.2 Prototype performance test accuracy 51
- 8.4.3 Types of prototype performance testing 51
- 8.4.4 Results evaluation
- Appendix A (Informative) Technical Specifications
- A:1 Overview
- A:2 Reference Standard
Foreword
This document complies with the provisions of GB/T 1.1-2020 "Standardization Work Guidelines Part 1: Structure and Drafting Rules of Standardization Documents" Drafting:
This document replaces GB/T 28545-2012 "Guidelines for the Renovation and Performance Improvement of Water Turbines, Storage Pumps and Water Pump Turbines" and is consistent with Compared with GB/T 28545-2012, in addition to structural adjustments and editorial changes, the main technical changes are as follows:
a) The scope of application has been changed, and the Pelton turbine has been changed to Pelton turbine (see Chapter 1, Chapter 1 of the:2012 edition);
b) The term "modern technological transformation" is deleted (see 3.4 of the:2012 edition);
c) Added the term "replacement" and its definition (see 3.4);
d) Added abbreviations (see Chapter 4);
e) The reasons for the transformation have been changed, and the 7 main reasons for the transformation have been described in detail (see 5.2~5:8, Chapter 4 of the:2012 edition chapter);
f) The determination of the plan has been changed, and the options are compared and confirmed from the aspects of transformation scope, cost, schedule, benefit, risk management and economic analysis:
The regulations have been refined (see 6.2:2~6:2:7, 5:2:3:1~5:2:3:6 of the:2012 version);
g) Added a typical routine checklist (see Table 2);
h) Added content for evaluation of temperature, noise, stainless steel galvanic corrosion and scratching (see 7.3:2:2:5~7:3:2:2:7);
i) Increases the impact of the roughness of the flow channel itself and its adjacent components on efficiency (see 7.3:3:3:2);
j) Added the evaluation of the impact of the sealing gap of the anti-leak ring on the hydraulic performance (see Table 3);
k) Increased expected efficiency after replacing the runner of the Francis turbine (including improving the airfoil, restoring the surface condition and reducing the loss of the anti-leak ring) the improvement value (see Table 4);
l) Increased the potential efficiency improvement of the turbine after modifying/replacing other components of the Francis turbine flow path (see Table 5);
m) The modification plan of extending the blades of the lower ring of the runner into the upper part of the draft tube tapered tube has been deleted (see 6.3:4:5:3 of the:2012 edition);
n) Delete the plan for ultra-long guide vane design (see 6.3:4:5:3 of the:2012 edition);
o) Added assessment of the impact on the power grid (see 7.4:9);
p) The content of the feasibility study of the renovation project has been changed (see B:4, A:1:4 of the:2012 version):
This document is modified to adopt IEC 62256:2017 "Updation and Performance Improvement of Water Turbines, Storage Pumps and Water Pump Turbines":
Compared with IEC 62256:2017, this document has made the following structural adjustments:
---Chapter 4 corresponds to the abbreviation part of Chapter 3 in IEC 62256:2017;
---Chapter 5 corresponds to Chapter 4 in IEC 62256:2017;
---Chapter 6 corresponds to 5:3:4:2~Chapter 6 in IEC 62256:2017;
---7:3:3 corresponds to 7:3:4 in IEC 62256:2017;
---Appendix A corresponds to Chapter 9 of IEC 62256:2017;
---Appendix B corresponds to 5:1, 5:2:1, 5:2:2, 5:3:2, 5:3:3, 5:3:4:1 in IEC 62256:2017;
---Appendix C corresponds to Appendix B in IEC 62256:2017;
---Appendix D corresponds to 7:3:3 in IEC 62256:2017;
---Appendix E corresponds to Appendix A in IEC 62256:2017;
---Appendix F corresponds to Appendix C in IEC 62256:2017:
The technical differences between this document and IEC 62256:2017 and their reasons are as follows:
---Changed the scope of application and deleted diagonal flow units (see Chapter 1);
--- Added normative references to GB/T 2900.45 (see Chapter 3);
---Deleted the terms "upgrade", "expanded overhaul", "modern technological transformation", "reconstruction" and "renovation" (see paragraph 3 in IEC 62256:2017 chapter);
---Deleted the abbreviations "ACG" "ETA" "FMA" "FMECA" "FTA" "HAZOP" "IRR" "PCB" "VAR" (see Chapter 3 in IEC 62256:2017);
---Changed the reason for the transformation (see Chapter 5);
---Deleted the transformation project logic flow diagram (see Figure 1 in IEC 62256:2017);
--- Added normative references to GB/T 15613 (see 6.4:2);
---Added optimization of operation mode (see 6.6:2:3:3);
---Added the influence of draft tube bulging on turbine status (see 7.3:2:4:1);
---Deleted the figures on the potential efficiency improvement after Francis turbine modification and the efficiency improvement after propeller turbine modification (see
Figure 11 and Figure 12 in IEC 62256:2017);
---Changed the impact of runner improvement on turbine efficiency (see 7.3:3:3:2);
---Changed the impact of improvements in other components of the turbine on turbine efficiency (see 7.3:3:3:3);
---Deleted the modification of the Hoover Dam hydropower station unit in the United States and the No: 3 hydroelectric generator unit of the Outardes Power Station in Canada:
Examples and curves of retrofit projects (7:3:4:2 in IEC 62256:2017);
---Deleted the potential efficiency improvement value after only improving the hydraulic design of the Francis turbine runner and the third stage of La Grande, Quebec, Canada the power station (LaGrande-3) turbine runner (put into operation in 1982) achieved efficiency improvements by slightly cutting the water outlet edge of the blades:
High conditions and curves (7:3:4:3:2 in IEC 62256:2017):
The following editorial changes have been made to this document:
---Change the name of the standard to "Guidelines for the Renovation and Performance Improvement of Water Turbines, Storage Pumps and Water Pump Turbines";
---Replaced IEC 60193 with the informative reference GB/T 15613 (see 6.5:2, 7:3:2:2:8:2, 8:3:4:2, 8:3:4:3);
---Replaced IEC 60041 with the informative reference GB/T 20043, and used the informative reference GB/T 15469.1, GB/T 19184 replaces IEC 60193 (see 6.5:2, 8:4:1);
---Replaced IEC 60944 with the informative reference GB/T 17189 (see 7.3:2:2:3, 7:4:1);
---Replaced ISO 7919-5:2005 with the informative reference GB/T 32584, adding installation, operation and maintenance issues (see 7.3:2:2:8:1);
---References changed:
Please note that some content in this document may be subject to patents: The publisher of this document assumes no responsibility for identifying patents:
1 Scope
This document applies to the following types of turbines, storage pumps and pump turbines:
---Mixed flow type;
---Axial flow type;
---Through-flow type;
---Water bucket type:
This document gives information on other aspects of the power plant building that may affect or be affected by the modification of turbines, storage pumps and water pump turbines:
equipment, but not discussed in detail:
The purpose of this document is to assist in the identification, evaluation and implementation of retrofit and performance improvement projects for turbines, storage pumps and pump turbines:
This operation is applicable to owners, consulting units and suppliers to determine the following matters:
---Demand and economic analysis of renovation and performance improvement;
---The scope of work for renewal and transformation;
---skills requirement;
---effect evaluation:
The purpose of this document is as follows:
--- Provide assistance in the decision-making process;
---Provide information resources for transformation;
---Identify major issues during the transformation process;
---Identify key points in the transformation process:
2 Normative reference documents
The contents of the following documents constitute essential provisions of this document through normative references in the text: Among them, the dated quotations for undated referenced documents, only the version corresponding to that date applies to this document; for undated referenced documents, the latest version (including all amendments) applies to this document:
GB/T 2900.45 Electrical Terminology Hydropower Machinery Equipment for Hydropower Stations (GB/T 2900.45-2006, IEC/T R61364:1999, MOD) GB/T 15613 Hydraulic turbine, storage pump and water pump turbine model acceptance test (GB/T 15613-2023, IEC 60193:
2019,IDT)
3 Terms and definitions
The terms and definitions defined in GB/T 2900.45 and the following apply to this document:
Rehabilitation
Restoring the efficiency and/or capacity of the equipment to levels close to that of a new unit or extending the life of the equipment by re-establishing the performance of the entire unit life:
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 110 pages — is available in the English PDF.
Referenced standards
How to Download GB/T 28545-2023
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
GB/T 10003-2026 — Biaxially oriented polypropylene (BOPP) film
GB/T 10004-2026 — Plastic/Plastic laminated films and pouches for packaging
GB/T 10007-2026 — Rigid cellular plastics - Determination of shear properties
Secure payment via Stripe
Payments accepted
GB/T 28545-2023
$1,775.00