Valid

GB/T 26978-2021Design and manufacture of site built, vertical, cylindrical, flat-bottomed steel tanks for the storage of cryogenic liquefied gas (English PDF)

现场组装立式圆筒平底钢质低温液化气储罐的设计与建造

Preview PDF

This is a limited preview

Buy now to download the full PDF (152 pages)

Need quotation for your management?

Get a formal quotation for GB/T 26978-2021 in 30 minutes.

Issued by

SAMR; SAC

Level / Type

National · Recommended

Issue date

December 31, 2021

Implementation date

July 1, 2022

Scope

GB/T 26978-2021 is the English-translated version of 现场组装立式圆筒平底钢质低温液化气储罐的设计与建造.

GB/T 26978-2021 sets the design, manufacture and installation of the site-built, above-ground, vertical cylindrical flat-bottomed steel tanks used to store cryogenic liquefied gas.

It gives the general requirements for the primary container and for the metal, concrete and insulation components that go with it, the materials, the design loads and analysis, the fabrication and erection, the welding, the inspection and testing and the commissioning.

It applies to such tanks, the LNG and cryogenic tanks of a terminal. Tank builders, gas companies and inspection bodies use it. It replaces GB/T 26978.1-2011, was issued on 31 December 2021 and has applied since 1 July 2022.

Found what you need?

Document preview — GB/T 26978-2021

National Standard of the People's Republic of China

ICS
75.060
Classification
E 24
Replacing
GB/T 26978.1-2011

Issued by: State Administration for Market Regulation; Standardization Administration of the PRC

Contents

  • Foreword4
  • Introduction9
  • 1 Scope10
  • 2 Normative References10
  • 3 Terms, Definitions, Symbols and Abbreviations13
  • 4 Basic Stipulations and General Rules24
  • 5 Metal Components40
  • 6 Concrete Components101
  • 7 Thermal Insulation Components105
  • 8 Tests, Drying, Replacement and Cooling121
  • Appendix A (informative) An Example of the Design of Central Reinforcement Ring .129
  • Appendix B (informative) Loads on the Membrane132
  • Appendix C (informative) Thermal Insulation Materials133
  • Appendix D (informative) Test Methods for Thermal Insulation Materials135
  • Appendix E (informative) Acceptance Inspection of Main Thermal Insulation Materials .138
  • Appendix F (informative) Thermal Insulation of the Bottom of Primary Storage Tank - -- Limit States Theory147
  • Appendix G (informative) Construction and Installation of Adiabatic System of Storage Tank149
  • Bibliography152

1 Scope

This document specifies the general requirements for the design, manufacture and installation of site built, above-ground vertical cylindrical flat-bottomed steel primary container storage tanks (including metal components, concrete components and thermal insulation components, etc.), and describes the procedures and methods for the tests, drying, replacement and cooling of the storage tanks.

This document does not apply to storage tanks whose primary container is concrete.

2 Normative References

The contents of the following documents constitute indispensable clauses of this document through the normative references in the text. In terms of references with a specified date, only versions with a specified date are applicable to this document. In terms of references without a specified date, the latest version (including all the modifications) is applicable to this document.

GB/T 150.2-2011 Pressure Vessels - Part 2: Materials

GB/T 150.3 Pressure Vessels - Part 3: Design

GB/T 193 General Purpose Metric Screw Threads - General Plan

GB/T 229 Metallic Materials - Charpy Pendulum Impact Test Method

GB/T 709-2019 Dimension, Shape, Weight and Tolerance for Hot-rolled Steel Strip, Plate and Sheet

GB/T 985.1 Recommended Joint Preparation for Gas Welding, Manual Metal Arc Welding, Gas-shield Arc Welding and Beam Welding

GB/T 1220 Stainless Steel Bars

GB/T 2518 Continuously Hot-dip Zinc-coated Steel Sheet and Strip

GB 3097 Sea Water Quality Standard

GB/T 3531 Steel Plates for Low Temperature Pressure Vessels

GB/T 5224 Steel Stand for Prestressed Concrete

GB/T 6478 Steels for Cold Heading and Cold Extruding

GB/T 9145-2003 General Purpose Metric Screw Threads - Limits of Sizes for the Screw Threads of Medium Quality and Preferable Plan

3 Terms, Definitions, Symbols and Abbreviations

3.1 Terms and Definitions

The following terms and definitions are applicable to this document.

3.2 Symbols

The following symbols are applicable to this document.

3.3 Abbreviations

The following abbreviations are applicable to this document.

4 Basic Stipulations and General Rules

4.1 Types of Storage Tank

4.1.1 Single-containment tank

There is only one self-supporting steel storage tank for the storage of cryogenic liquids, which can consist of a single-walled or double-walled structure with the insulation layer, and with liquid-tightness and air-tightness.

4.2 Overall Design Basis

4.2.1 General stipulations

The technical specification document of the storage tank design shall determine the following contents.

a) Scope of work, including testing, drying, replacement and cooling, etc.;

4.2.2 Performance requirements

The storage tank design shall satisfy the following requirements.

4.2.3 Allowable stress and limit states theory

For the design of steel storage tanks and adiabatic system, the allowable stress theory can be used, and the limit states theory can also be used.

For the concrete structure design, the limit states theory shall be adopted. The limit states design shall include.

4.2.4 Seismic design

The structural design under seismic action shall be carried out in accordance with the following stipulations.

4.3 Protection System

4.3.1 Monitoring protection
4.3.1.1 Monitoring system

The design of liquid level, pressure, temperature monitoring and gas supply system in the storage tank shall comply with the relevant stipulations of GB 51156-2015.

4.3.1.2 Roll-over prevention system

The following measures of preventing roll-over can be taken.

4.4 Actions

4.4.1 General rules

Permanent actions, variable actions and occasional actions shall be included.

4.4.2 Permanent actions

Permanent actions include self-weight and prestressed local effect of concrete, steel and thermal insulation components, pipelines, fittings, auxiliary equipment and fixed equipment.

See GB 50010 for the method of determining the prestressed local effect.

4.5 Inspection and Maintenance

The key matters that need to be paid attention to shall be clarified, and the corresponding inspection and maintenance procedures of storage tanks shall be compiled.

4.6 Quality Management, Environmental Management and Occupational

Health and Safety Management

5 Metal Components

5.1 General Requirements

The metal components of the cryogenic liquefied gas storage tanks shall be designed in accordance with the type of storage tanks, the storage medium and operating conditions, etc.

5.2 Materials

5.2.1 Temperature

The following factors shall be considered when determining the design temperature of metal components.

5.3 Design

5.3.3 Steel outer container

5.3.3.1 Single-containment tank, double-containment tank and full-containment tank

5.3.3.2 Membrane tank

The steel components on the roof of the membrane tank shall comply with the stipulations of 5.3.3.1.3.

5.3.4 Suspended deck

The suspended deck and its supporting structure shall be designed in accordance with the minimum design temperature conditions.

5.5 Welding Process

5.5.1 General rules

All welding, including repair welding and positioned welding, shall be subject to the welding procedure qualification in accordance with the stipulations of NB/T 47014. On this basis, the welding procedure specification (WPS) and welding procedure qualification report (PQR) can be formulated.

5.6 Welding

5.6.1 Positioned welded joints and temporary welded joints

The positioned welded joints and temporary welded joints shall be completed by qualified welders.

5.7 Inspection

5.7.1 Qualifications of non-destructive testing (NDE) personnel

The non-destructive testing personnel shall pass the examination and obtain corresponding qualifications, which shall comply with the stipulations of TSG Z8001.

5.8 Air Pressure Lift

5.8.1 General Requirements

Before air pressure lift, safety protection facilities shall be configured.

Before construction, confirm that the following procedures are completed and qualified.

5.8.2 Air pressure lifting system

The air pressure lifting system shall include fan system, equilibrium system, sealing system and monitoring system.

The fan system shall satisfy the air volume and pressure required for the steady rise of the steel vault and be equipped with the function of air volume adjustment. In addition, a backup fan shall be provided.

5.8.3 Process control

Before construction, it shall be checked that the construction preparations comply with the requirements for the lifting.

During the lifting of the steel vault, it shall maintain an equilibrium state, and the horizontal deviation should be controlled within 200 mm.

6 Concrete Components

6.2 Load Combinations

6.2.1 General rules

The designed load combinations shall comply with the requirements of 4.4. The partial factor method and limit states theory shall be adopted to ensure the reliability of concrete components.

The load design value, load effect and geometric parameters shall comply with the stipulations of GB 50010.

6.2.2 Partial factors and load combinations of various loads

The permanent load, variable load, seismic action and accidental load of the storage tank shall comply with the stipulations of GB 51156-2015.

The horizontal and vertical seismic actions shall be simultaneously combined, and the partial factors of other seismic actions shall comply with the stipulations of GB 51156-2015.

In addition to satisfying the requirements of 4.4, the partial load factors under the occasional action are shown in Table 27.

6.3 Design Requirements

6.3.1 Prestress

The design of the prestressing system shall comply with the stipulations of GB 50010 and JGJ 369.

For prestressed concrete tank shell, horizontal prestress and vertical prestress shall be applied to it, and the form of oblique prestress can also be adopted.

The maximum prestressed tension should be 75% of the yield strength of the prestressed steel strand, and shall not exceed 80% of the yield strength of the prestressed steel strand.

6.3.2 Shell design

The seismic fortification classification of the prestressed concrete outer tank shall be Class B.

The concrete of the prestressed concrete outer tank shall adopt concrete of low-temperature environment, and shall comply with the stipulations of GB 51081.

6.5 Lining

6.5.1 General rules

A steel lining shall be installed on the inner surface of the concrete, so as to ensure the liquid-tightness of the concrete outer tank.

7 Thermal Insulation Components

7.2 Design, Performance, Testing and Selection of Thermal Insulation Materials

7.1 Overview

The main functions of thermal insulation components in the cryogenic liquefied gas storage tanks include.

7.2.1 General requirements

Appropriate adiabatic system and thermal insulation materials shall be selected based on the following contents.

7.2.3 Evaluation of material performance
7.2.4.1 General requirements

The performance characteristics of thermal insulation materials shall be demonstrated through the following aspects.

7.3 Thermal Protection - Vapor Barrier

7.3.1 General requirements

Since the adiabatic system is not a self-supporting component of the storage tank, it consists of thermal insulation materials, thermal insulation layer and fixation system, which shall be fixed, placed and filled between components or supported by other components (concrete and steel structures).

7.3.2 Protective structure formed by outer tank

When the outer tank provides protection and support for the thermal insulation materials, the air-tightness of the outer tank shall be ensured.

7.4 Design of Adiabatic System

7.4.5 Thermal insulation of tank shell (external)
7.4.5.1 Structural design

The structural design shall consider the following points.

7.5 Installation of Adiabatic system

7.5.1 General requirements

The installation of the adiabatic system of the storage tank shall comply with the following requirements.

7.5.2 Construction of storage tank adiabatic system

The construction, installation and acceptance inspection of the cryogenic liquefied gas storage tanks should satisfy the requirements of SY/T 7349. See Appendix G for the specific construction and installation requirements of the storage tank adiabatic system.

7.5.3 Damage protection

The thermal insulation materials shall be protected from damage by the following factors.

8 Tests, Drying, Replacement and Cooling

8.1 Hydrostatic Test and Pneumatic Test

8.1.1 Hydrostatic test
8.1.1.1 General stipulations

The storage tanks shall be subject to a hydrostatic test. Through the hydrostatic test, the following shall be proved.

8.1.1.3 Additional requirements

The following additional requirements shall be satisfied.

8.2 Drying, Replacement and Cooling

8.2.1 Procedures

Procedures for drying, replacement and cooling of the storage tanks shall be formulated. The replacement and cooling shall be continuously performed and contingency plans shall be included in the procedures should any stage be interrupted.

8.2.3 Replacement

Before the cryogenic liquefied gas is injected into the storage tank, inert gas shall be used to as a replacement. Nitrogen can be adopted.

8.2.4 Cooling

The cooling of the primary container shall be controlled to prevent relatively large temperature differences during the cooling process. The temperature of the inner tank or membrane steel shall be monitored to keep it within the allowable range.

8.3 Shutdown

Necessary measures shall be taken to ensure that the storage tank can be safely shut down.

Operating procedures shall be formulated in accordance with the possible shutdown conditions.

In case of a shutdown of the storage tank, the shutdown procedures shall be formulated.

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 152 pages — is available in the English PDF.

Referenced standards

Similar standards

Editions of GB/T 26978

EditionTitleRevisionStatus
GB/T 26978-2021Design and manufacture of site built, vertical, cylindrical, flat-bottomed steel tanks for the storage of cryogenic liquefied gascurrent editionCurrent
GB/T 26978.1-2011Design and manufacture of site built, vertical, cylindrical, flat-bottomed steel tanks for the storage of cryogenic liquefied gasprevious editionSuperseded

This page sells the current edition, GB/T 26978-2021. Earlier editions are listed for reference only.

How to Download GB/T 26978-2021

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
152 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

GB/T 26978-2021

$1,325.00