GB/T 26857.4-2018Information technology—Open systems interconnection—Methods for testing and specification(MTS)—The testing and test control notation—Version 3—Part 4: TTCN-3 operational semantics (English PDF)
信息技术 开放系统互连 测试方法和规范(MTS) 测试和测试控制记法 第3版 第4部分:TTCN-3操作语义
This is a limited preview
Buy now to download the full PDF (152 pages)
Need quotation for your management?
Get a formal quotation for GB/T 26857.4-2018 in 30 minutes.
Issued by
SAMR; SAC
Level / Type
National · Recommended
Issue date
September 17, 2018
Implementation date
April 1, 2019
Scope
GB/T 26857.4-2018 is the English-translated version of 信息技术 开放系统互连 测试方法和规范(MTS) 测试和测试控制记法 第3版 第4部分:TTCN-3操作语义.
GB/T 26857.4-2018 is Part 4 of the Chinese TTCN-3 series and defines the operational semantics of TTCN-3, the Testing and Test Control Notation version 3, building on the core language of GB/T 26857.1-2011.
It gives a state-oriented view of how a TTCN-3 module is executed, using state information to set the preconditions for executing each construct and describing how that execution changes the state.
It covers the short-form replacements, such as those for interleave, trigger, select-case, break and continue statements, the flow chart semantics and state definitions of a module, and the flow chart fragments for each statement and operation, from alt and send to receive, timers and verdicts.
It applies to black-box testing such as conformance, interoperability and robustness testing. It was issued on 17 September 2018 and has applied since 1 April 2019.
Found what you need?
Document preview — GB/T 26857.4-2018
National Standard of the People's Republic of China
- ICS
- 35.100
- Classification
- L 79
Issued by: State Administration for Market Regulation; Standardization Administration of the PRC
Contents
- Foreword
- 1 Scope
- 2 Normative references
- 3 Terms and Definitions
- 4 Abbreviations
- 5 Overview
- 6 short format replacement
- 6.1 Overview
- 6.2 Order of replacement steps
- 6.3 Replacement of global constants and module parameters
- 6.4 Embedding a single receive operation in an alt statement
- 6.5 Embedding a separate alternate step in the alt statement call
- 6.6 Replacement of interleave statement
- 6.7 Replacement of the trigger operation
- 6.8 select-case statement replaces
- 6.9 Replacement of a simple break statement
- 6.10 Replacement of the continue statement
- 6.11 Adding default parameters to disconnect and unmap operations without parameters
- 6.12 Default value of adding parameters
- 7 TTCN-3 flow chart semantics
- 7.1 Flowchart
- 7.2 Flowchart representation of TTCN-3 behavior
- 7.3 State definition of the TTCN-3 module
- 7.4 Messages, Program Calls, Answers, and Exceptions
- 7.5 Calls to functions, alternative steps, and test cases
- 7.6 Calculation Procedure for TTCN-3 Module
- 8 TTCN-3 construction flow chart fragment
- 8.1 Overview
- 8.2 Action statement
- 8.3 Activate statement
- 8.4 Alt statement
- 8.5 Alternative step call
- 8.6 Assignment statement
- 8.7 Cal operation
- 8.8 Catch Operation
- 8.9 check operation
- 8.10 Clear Port Operation
- 8.11 Connect Operation
- 8.12 Constant Definition
- 8.13 Create Operation
- 8.14 Deactivate statement
- 8.15 Disconnect Operation
- 8.16 Do-while statement
- 8.17 Done Component Operation
- 8.18 Execute statement
- 8.19 Expression
- 8.20 Flowchart fragment <finalize-component-init>
- 8.21 Flowchart fragment <init-component-scope>
- 8.22 Flowchart fragment <parameter-handling>
- 8.23 Flowchart fragment <statement-block>
- 8.24 For statement
- 8.25 Function Call
- 8.26 Getcal operation
- 8.27 Getreply Operation
- 8.28 Getverdict operation
- 8.29 Goto statement
- 8.30 If-else statement
- 8.31 Label statement
- 8.32 Log statement
- 8.33 Map Operation
- 8.34 Mtc operation
- 8.35 Port Statement
- 8.36 Raise Operation
- 8.37 Read Timer Operation
- 8.38 Receive Operation
- 8.39 Repeat statement
- 8.40 Reply Operation
- 8.41 Return Statement
- 8.42 Running Component Operation
- 8.43 Running Timer Operation
- 8.44 Self operation
- 8.45 Send Operation
- 8.46 Setverdict operation
- 8.47 Start component operation
- 8.48 Start Port Operation
- 8.49 Start Timer Operation
- 8.50 Stop Component Operation
- 8.51 Stop execution statement
- 8.52 Stop Port Operation
- 8.53 Stop Timer Operation
- 8.54 System Operation
- 8.55 Timer Statement
- 8.56 Timeout Timer Operation
- 8.57 Unmap Operation
- 8.58 Variable Statement
- 8.59 While statement
- 9 Operational Semantic Components List
- 9.1 Features and Status
- 9.2 Special Keywords
- 9.3 Flowchart of TTCN-3 Behavior Description
- 9.4 Flowchart fragment
Foreword
GB/T 26857 "Information Technology Open Systems Interconnection Test Methods and Specifications (MTS) Test and Test Control Notation No. 3 The edition is divided into the following sections.
--- Part 1. TTCN-3 core language;
--- Part 2. TTCN-3 table representation format;
--- Part 3. TTCN-3 graphical representation format;
--- Part 4. TTCN-3 operational semantics.
This part is the fourth part of GB/T 26857.
This part is drafted in accordance with the rules given in GB/T 1.1-2009.
1 Scope
This part of GB/T 26857 specifies the operational semantics of TTCN-3.
This section applies to the field of black box testing such as conformance testing, interoperability testing, and robustness testing.
2 Normative references
The following documents are indispensable for the application of this document. For dated references, only dated versions apply to this document. For undated references, the latest edition (including all amendments) applies to this document.
GB/T 26857.1-2011 Information technology open system interconnection test method and specification (MTS) test and test control Law 3rd Edition Part 1. TTCN-3 Core Language
3 Terms and definitions
The terms and definitions defined in GB/T 26857.1-2011 apply to this document.
4 Abbreviations
The following abbreviations apply to this document.
BNF. Backus-NauerForm
MTC. Main Test Component (MasterTestComponent)
SUT. System under test (SystemUnderTest)
TTCN. Test and Test Control Notation (TestingandTestControlNotation)
TTCN-3. Test and Test Control Notation Version 3 (TestingandTestControlNotationVersion3)
5 Overview
This section is based on the core language defined in GB/T 26857.1-2011, which defines the behavior of TTCN-3 in an intuitive and clear manner. meaning.
This operational semantic provides a state-oriented view on TTCN module execution. Describe different states, different TTCN-3 structures The two ways of meaning are as follows.
a) use state information to define preconditions for structural execution;
b) Define how the execution of the structure will change a state.
Operational semantics are limited to the meaning of TTCN-3 behavior, ie functions, alternative steps, test cases, module control, and used to define test lines.
The language structure, such as send and receive operations, if-else- or while-statements. The meaning of some TTCN-3 structures can be changed by using […]
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 152 pages — is available in the English PDF.
Referenced standards
Similar standards
How to Download GB/T 26857.4-2018
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Fast delivery
After payment you'll receive an email confirmation. The English PDF is sent to the same address, usually within minutes and at the latest within 1 business day.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
GB/T 26857.1-2011 — Methods for testing and specification (MTS)- The testing and test control notation version 3 - Part1: TTCN-3 core language
GB/T 10003-2026 — Biaxially oriented polypropylene (BOPP) film
GB/T 10004-2026 — Plastic/Plastic laminated films and pouches for packaging
Secure payment via Stripe
Payments accepted
GB/T 26857.4-2018
$2,070.00