GB/T 26567-2011Test method for the grindability of cement raw materials (Bond method) (English PDF)
水泥原料易磨性试验方法(邦德法)
Open the GB/T 26567-2011 preview as PDF
This is a limited preview
Buy now to download the full PDF (17 pages)
Issued by
General Administration of Quality Supervision, Inspection and Quarantine; Standardization Administration of the PRC
Level / Type
National · Recommended
Issue date
June 16, 2011
Implementation date
February 1, 2012
Scope
GB/T 26567-2011 is the English-translated version of 水泥原料易磨性试验方法(邦德法).
China's national test method for the grindability of cement raw materials by the Bond procedure. It specifies the principle, the apparatus, the specimen preparation, the test procedure and the calculation of the Bond work index of the limestone, clay, sand, iron ore and other materials fed to a cement raw mill. Grinding is where a cement works spends its electricity. Raw material preparation and finish grinding together account for most of the plant's power consumption, and the mills are sized, selected and paid for on the basis of how hard the material is to grind - so a number that predicts that, before the plant is built and before a contract is signed, is worth a great deal. The Bond work index is that number: the energy in kilowatt hours required to reduce one short ton of material from a theoretically infinite size to a size at which eighty per cent passes a hundred micrometres. It is not a physical constant of the rock but the output of a defined procedure, and it is useful precisely because the procedure is fixed. The test is a locked-cycle simulation of a closed-circuit mill: a charge of steel balls of specified sizes in a mill of specified dimensions, a defined number of revolutions, then screening at the chosen closing size, replacement of the undersize with fresh feed, and repetition until the circulating load stabilises at two hundred and fifty per cent. The work index is then calculated from the grams of undersize produced per mill revolution at equilibrium. Every part of that has to be prescribed, because the result is a comparison and not a measurement: change the ball charge, the mill, the closing screen or the number of cycles and the number changes. Issued on 16 June 2011 and in force since 1 February 2012.
Document preview — GB/T 26567-2011
National Standard of the People's Republic of China
- ICS
- 91.100.10
- Classification
- Q 11
Issued by: General Administration of Quality Supervision, Inspection and Quarantine; Standardization Administration of the PRC
Contents
- 1 Scope
- 2 Normative references
- 3 Terms and Definitions
- 4 Test principle
Foreword
This standard was drafted in accordance with GB/T 1.1-2009 given rules. The standard proposed by China Building Materials Federation. This standard by the National Standardization Technical Committee cement (SAC/TC184) centralized. This standard was drafted. Tianjin Cement Industry Design and Research Institute Limited. The main drafters of this standard. Nixiang Ping, THE STAFF Wangzhong Chun, Ji-open, white wave, Chen Dongming. Grindability test method cement raw materials are easily (Bond Act)
1 Scope
China's national test method for the grindability of cement raw materials by the Bond procedure. It specifies the principle, the apparatus, the specimen preparation, the test procedure and the calculation of the Bond work index of the limestone, clay, sand, iron ore and other materials fed to a cement raw mill. Grinding is where a cement works spends its electricity. Raw material preparation and finish grinding together account for most of the plant's power consumption, and the mills are sized, selected and paid for on the basis of how hard the material is to grind - so a number that predicts that, before the plant is built and before a contract is signed, is worth a great deal. The Bond work index is that number: the energy in kilowatt hours required to reduce one short ton of material from a theoretically infinite size to a size at which eighty per cent passes a hundred micrometres. It is not a physical constant of the rock but the output of a defined procedure, and it is useful precisely because the procedure is fixed. The test is a locked-cycle simulation of a closed-circuit mill: a charge of steel balls of specified sizes in a mill of specified dimensions, a defined number of revolutions, then screening at the chosen closing size, replacement of the undersize with fresh feed, and repetition until the circulating load stabilises at two hundred and fifty per cent. The work index is then calculated from the grams of undersize produced per mill revolution at equilibrium. Every part of that has to be prescribed, because the result is a comparison and not a measurement: change the ball charge, the mill, the closing screen or the number of cycles and the number changes. Issued on 16 June 2011 and in force since 1 February 2012.
This standard specifies the cement raw material grindability test terms and definitions, test principle, test equipment, sample preparation, test procedures and test The method of calculation and presentation of results. This standard applies to the cement raw material grindability test.
2 Normative references
The following documents for the application of this document is essential. For dated references, only the dated version suitable for use herein Member. For undated references, the latest edition (including any amendments) applies to this document. GB 308 Rolling Ball
GB 474 coal sample preparation
GB/T 6003.1 woven wire mesh test sieve (idt ISO 3310-1.1990)
3 Terms and Definitions
The following terms and definitions apply to this document.
3.1 Grinding Work Index grindingworkindex According to Bond Index (FCBond) crushing theory, showing cement raw material grindability. 3.2 80% of the particle size 80% passingsize Particulates having a particle size distribution of 80% by mass of the particles can be passed the mesh size.
3.3 Finished screen productsieve Test sieve for separating the finished product from the material.
3.4 Circulating load circulatingload Mill discharged materials, the need to return to the mill and coarse powder mass ratio of the finished product through the sieve of fine quality.
3.5 Equilibrium equilibriumstate Three consecutive grinding, cyclic loading are in line with (250 ± 5)%, and the mill per revolution of the poor quality of the finished product is less than the average 3%.
4 Test principle
Using a predetermined mill for grinding samples intermittent cycle, according to the equilibrium state of the mill output and product size, and the sample size and Finished mesh sizes calculated grinding work index sample.
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 17 pages — is available in the English PDF.
Referenced standards
Normative references
GB 308 · GB 474 · GB/T 6003.1 · ISO 3310
Similar standards
How to Buy GB/T 26567-2011
- 1Add to cart. Click the "Buy GB/T 26567-2011" button on this page. You can add more standards before checkout.
- 2Checkout. Enter your email and billing details. Payment is processed securely by Stripe (cards, Apple Pay, Google Pay supported).
- 3Instant delivery (0–9 sec). Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4Invoice included. A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
GB 30862-2014 — Personal fall protection equipment-Anchor devices
GB 30863-2025 — Eye and face protection - Laser eye-protectors
GB 30864-2014 — Respiratory protection-Powered air-purifying respirator
Secure payment via Stripe
Payments accepted
GB/T 26567-2011
$110.00