Issue date

December 23, 2010

Implementation date

September 1, 2011

Scope

GB/T 25824-2010 is the English-translated version of 道路用钢渣.

GB/T 25824-2010 is the Chinese standard "Steel slag for road". Its scope clause reads: This standard specifies the terms and definitions, specifications, technical requirements, test methods, inspection rules, transportation, storage of steel slag for road use.

This standard applies to steel slag used as coarse aggregate in asphalt mixtures, as well as steel slag used in road base courses and subgrades. Its clauses include terms and definitions; specifications; technical requirements; test methods; inspection rules; storage, transportation, quality certificate.

It was issued by the General Administration of Quality Supervision, Inspection and Quarantine on DECEMBER 23, 2010 and took effect on SEPTEMBER 01, 2011.

Found what you need?

Document preview — GB/T 25824-2010

National Standard of the People's Republic of China

ICS
77.140.99
Classification
H 54

Issued by: State Administration for Market Regulation; Standardization Administration of the PRC

Contents

  • Foreword3
  • 1 Scope4
  • 2 Normative references4
  • 3 Terms and definitions4
  • 4 Specifications5
  • 5 Technical requirements6
  • 6 Test methods7
  • 7 Inspection rules8
  • 8 Storage, transportation, quality certificate9

1 Scope

This standard specifies the terms and definitions, specifications, technical requirements, test methods, inspection rules, transportation, storage of steel slag for road use.

This standard applies to steel slag used as coarse aggregate in asphalt mixtures, as well as steel slag used in road base courses and subgrades.

2 Normative references

The following documents are essential to the application of this document. For the dated documents, only the versions with the dates indicated are applicable to this document; for the undated documents, only the latest version (including all the amendments) is applicable to this standard.

GB/T 24175 Test method for stability of steel slag

JTG D50 Specifications for design of highway asphalt pavement

JTG E42-2005 Test methods of aggregate for highway engineering

JTG F40 Technical specifications for construction of highway asphalt pavement

JTJ 052-2000 Standard test methods of bitumen and bituminous mixtures for highway engineering

YB/T 804 Terminology for iron and steel slag & treatment and utilization

3 Terms and definitions

The terms and definitions defined in GB/T 24175, YB/T 804, JTG D50, as well as the following terms and definitions, apply to this document.

3.1 Steel slag for road

Converter steel slag or electric arc furnace steel slag, that has undergone qualified stabilization treatment and is used in road engineering.

3.2 High-grade road

Expressways and Class I highways among highways, as well as express roads and arterial roads among urban roads.

3.3 Other grades road

Roads of grades other than high-grade roads.

4 Specifications

4.1 Specifications for steel slag coarse aggregate for asphalt mixtures

The designation of steel slag coarse aggregate for asphalt mixtures shall comply with the provisions of JTG F40; the particle size requirements shall comply with the provisions of Table 1.

4.2 Specifications for steel slag aggregate for road base courses

For high-grade roads, the maximum particle size of steel slag used in the base course shall not exceed 31.5 mm; that in the sub-base course shall not exceed 37.5 mm. For roads of other grades, the maximum particle size of steel slag used in the base course shall not exceed 37.5 mm; that in the sub-base course shall not exceed 53 mm.

The aggregate gradation for cement-stabilized steel slag mixtures and cement-fly ash-stabilized steel slag mixtures shall comply with the provisions of Table 2. The aggregate gradation for lime-fly ash-stabilized steel slag mixtures shall comply with the provisions of Table 3.

4.3 Specifications for steel slag used in roadbeds

The maximum particle size of steel slag used in roadbeds shall not exceed 60 mm.

5 Technical requirements

5.1 Technical requirements for steel slag coarse aggregate used in asphalt mixtures

The technical requirements for steel slag coarse aggregate used in asphalt mixtures shall comply with the provisions of Table 4.

The technical requirements for steel slag aggregate used in road base courses shall comply with the provisions of Table 5.

5.3 Technical requirements for steel slag used in roadbeds

The water immersion expansion rate of steel slag used in roadbeds shall not exceed 2.0%.

6 Test methods

6.1 Screening

Screening is conducted in accordance with the provisions of JTG E42.

6.2 Water immersion expansion rate

It is conducted in accordance with the provisions of GB/T 24175.

6.3 Crushing value

It is conducted in accordance with T0316 of JTG E42-2005.

6.4 Los Angeles abrasion loss

It is conducted in accordance with T0317 of JTG E42-2005.

6.5 Soundness

It is conducted in accordance with T0314 of JTG E42-2005.

6.6 Water absorption

It is conducted in accordance with T0304 of JTG E42-2005.

6.7 Apparent relative density

It is conducted in accordance with T0304 of JTG E42-2005.

6.8 Elongated and flaky particle content

It is conducted in accordance with T0312 of JTG E42-2005.

6.9 Weak and soft particle content

It is conducted in accordance with T0320 of JTG E42-2005.

6.10 Polishing value

It is conducted in accordance with T0321 of JTG E42-2005. […]

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 15 pages — is available in the English PDF.

Referenced standards

Similar standards

How to Download GB/T 25824-2010

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
15 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

GB/T 25824-2010

$125.00