GB/T 24737.7-2009Guide for technological management - Part 7: Technological quota formulation (English PDF)
工艺管理导则 第7部分:工艺定额编制
This is a limited preview
Buy now to download the full PDF (15 pages)
Need quotation for your management?
Get a formal quotation for GB/T 24737.7-2009 in 30 minutes.
Issued by
SAMR; SAC
Level / Type
National · Recommended
Issue date
November 30, 2009
Implementation date
September 1, 2010
Scope
GB/T 24737.7-2009 is the English-translated version of 工艺管理导则 第7部分:工艺定额编制.
GB/T 24737.7-2009 is the Chinese standard "Guide for technological management - Part 7: Technological quota formulation". Its scope clause reads: This section GB/T 24737 specifies the principles and methods of preparation of material consumption and labor consuming process technology Quota Quota.
This section is applicable to mechanical products process material consumption quotas and labor consuming process quotas (referred to as the labor quota) preparation.
Its clauses include terms and definitions; preparation of process material consumption quota.
Found what you need?
Document preview — GB/T 24737.7-2009
National Standard of the People's Republic of China
- ICS
- 25.020
- Classification
- J 30
Issued by: State Administration for Market Regulation; Standardization Administration of the PRC
Contents
- 1 Scope
- 2 Terms and definitions
- 3 preparation of process material consumption quota
- 3.2 Principles preparation process material consumption quota
- 3.3 Basis of Preparation Process material consumption quota
- 3.4 Processes for preparing material consumption quota
1 Scope
This section GB/T 24737 specifies the principles and methods of preparation of material consumption and labor consuming process technology Quota Quota.
This section is applicable to mechanical products process material consumption quotas and labor consuming process quotas (referred to as the labor quota) preparation.
2 Terms and definitions
The following terms and definitions apply to this part of the GB/T 24737 of.
2.1
Under certain technical conditions of production, within a certain period of time, production and business activities, related to human, material and financial resources that should use and consumption
Or achieve compliance with the quantity and quality standards.
2.2
Under certain conditions of production, product or production units consume the amount of material required for the part.
2.3
Under certain technical conditions of production, product or production unit to complete the amount of labor should consume a certain amount of work (usually with labor or work
Time to represent) standards or produce products in unit time or work performed.
3 preparation of process material consumption quota
Range 3.1 preparation process material consumption quota
The main materials and auxiliary materials required in the production process of constituting a product, it shall prepare consuming process quotas.
3.2 Principles preparation process material consumption quota
Preparation of material consumption process should be fixed in the premise of ensuring product quality and process requirements, to fully consider the economic and rational use of materials, the most
To Maximize material utilization, reduce material consumption.
3.3 Basis of Preparation Process material consumption quota
Preparation of material consumption quota based process typically includes.
--- Product parts list and product design;
--- Parts process planning;
--- Relevant material standards, manuals and unloading standards and the corresponding specifications.
3.4 Processes for preparing material consumption quota
3.4.1 Technical calculation
According to product parts structure and process requirements, obtained by theoretical calculation and the net weight parts of the manufacturing process
The process of loss.
3.4.2 The actual assay
Determination of the actual method of weighing each product part fixed material consumption process.
3.4.3 empirical statistical analysis
actual consumption according to a similar product parts and materials statistics, through analysis and comparison, to determine the parts of the material consumption
Consuming process quotas.
GB/T 24733-2023 | GB/T 40803-2021 | GB/T 40799-2021 | GB/T 24737.6-2012 | GB/T 24737.4-2012 | GB/T 24737.2-2012 | […]
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 15 pages — is available in the English PDF.
Similar standards
How to Download GB/T 24737.7-2009
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
GB/T 24737.8-2009 — Guide for technological management - Part 8: Process verification
GB/T 24737.6-2012 — Guide for technological management - Part 6: Process optimization and review
GB/T 24737.9-2012 — Guide for technological management - Part 9: Technological management of production field
Secure payment via Stripe
Payments accepted
GB/T 24737.7-2009
$145.00