Scope
GB/T 24561-2009 is the English-translated version of 干燥窑与烘烤炉节能监测.
GB/T 24561-2009 is the Chinese standard "Monitoring and testing for energy saving of drying kiln and hot oven". Its scope clause reads: This standard specifies the drying kiln and oven energy monitoring project, monitoring methods and assessment indicators.
This standard applies to all kinds of coal, gas and kiln drying oven. Its clauses include terms and definitions; oven drying kiln and energy monitoring project; oven drying kiln and energy monitoring method.
Found what you need?
Document preview — GB/T 24561-2009
National Standard of the People's Republic of China
- ICS
- 27.010
- Classification
- F 01
Issued by: State Administration for Market Regulation; Standardization Administration of the PRC
Contents
- 1 Scope
- 2 Normative references
- 3 Terms and Definitions
- 4 oven drying kiln and energy monitoring project
- 5 oven drying kiln and energy monitoring method
1 Scope
This standard specifies the drying kiln and oven energy monitoring project, monitoring methods and assessment indicators.
This standard applies to all kinds of coal, gas and kiln drying oven.
2 Normative references
The following documents contain provisions which, through reference in this standard and become the standard terms. For dated references, subsequent
Amendments (not including errata content) or revisions do not apply to this standard, however, encourage the parties to the agreement are based on research
Whether the latest versions of these documents. For undated reference documents, the latest versions apply to this standard.
Analysis Method GB/T 212 coal
GB/T 4272 General technical equipment and pipeline insulation
Performance testing procedures GB/T 10180 industrial boilers Thermal
3 Terms and Definitions
The following terms and definitions apply to this standard.
3.1
The difference between surface temperature and ambient temperature drying kiln and oven.
4 oven drying kiln and energy monitoring project
Check item 4.1
4.1.1
furnace body tight, complete, equipment and pipe insulation should be consistent with the relevant provisions of GB/T 4272's.
4.1.2
a reasonable set of systems and equipment working properly.
4.1.3
measuring instruments equipped, reasonable, and in the test cycle.
4.2 Test Project
4.2.1
exhaust gas temperature.
4.2.2
air factor.
4.2.3
fired kiln ash carbon content.
4.2.4
furnace surface temperature.
5 oven drying kiln and energy monitoring method
5.1 Conditions and Monitoring time
Monitoring tests should be carried out under the normal operation of equipment, thermal conditions relatively stable situation. Intermittent kilns should be monitored for a complete cycle, even
Continued monitoring of kiln no less than 2h.
5.2 Monitoring Instruments
Monitoring equipment used to monitor the project should be able to meet the requirements, the instrument should be intact, its accuracy should not be less than the requirements of Table 1 and in the test cycle
Inside. Instrument accuracy not less than the value specified in Table 1 of the new instrument, applicable to this standard.
GB/T 24915-2020 | GB 24850-2020 | GB 24500-2020 | GB/T 24563-2009 | GB/T 24562-2009 | GB/T 24560-2009 | […]
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 15 pages — is available in the English PDF.
Similar standards
How to Download GB/T 24561-2009
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
GB/T 10003-2026 — Biaxially oriented polypropylene (BOPP) film
GB/T 10004-2026 — Plastic/Plastic laminated films and pouches for packaging
GB/T 10007-2026 — Rigid cellular plastics - Determination of shear properties
Secure payment via Stripe
Payments accepted
GB/T 24561-2009
$105.00