GB/T 24015-2026Environmental management - Guidelines for environmental due diligence assessment (English PDF)
环境管理 环境尽职调查评估指南
This is a limited preview
Buy now to download the full PDF (20 pages)
Need quotation for your management?
Get a formal quotation for GB/T 24015-2026 in 30 minutes.
Issued by
State Administration for Market Regulation
Level / Type
National · Recommended
Issue date
January 28, 2026
Implementation date
May 1, 2026
Scope
GB/T 24015-2026 is the English-translated version of 环境管理 环境尽职调查评估指南.
GB/T 24015-2026 — This document provides a systematic process for identifying environmental aspects, environmental issues, and environmental conditions, and, where applicable, determining their operational consequences.
The assessment guidelines for conducting environmental due diligence (EDD) in the process.
This document does not provide guidance on how to conduct other types of environmental assessments, such as. a) Environmental audit; b) Environmental impact assessment; c) Environmental performance, efficiency, or reliability assessment; d) Invasive environmental investigation and remediation.
Found what you need?
Document preview — GB/T 24015-2026
National Standard of the People's Republic of China
- ICS
- 13.020
- Classification
- Z 00
- Replacing
- GB/T 24015-2003
Issued by: State Administration for Market Regulation
Contents
- Preface
- Introduction
- 1 Scope
- 2 Normative References
- 3 Terms and Definitions
- 4 Principles
- 4.1 Overview
- 4.2 Evaluation Principles
- 4.3 Principles for Assessors
- 5 Plan and implement the assessment.
- 5.1 Overview
- 5.2 Roles and Responsibilities
- 5.3 Assessment Planning
- 5.4 Information Collection, Verification, and Approval
- 5.5 Rating (out of 11)
- 6 Report
- 6.1 Report Content
- 6.2 Report distribution
- 7 The competence and evaluation of the evaluators
- 7.1 Overall Considerations
- 7.2 Identification and Application of Capabilities
- 7.3 Ability Assessment
- Appendix A (Informative) Example 15 of assessment topics, documented information, and sources
- Appendix B (Informative) Observations on Actual Attributes and Conditions
- Appendix C (Informative) 18 Individuals and Entities Interviewed
- Appendix D (Informative) Example 19 of the EDD Assessment Report Table of Contents
- References
Foreword
This document complies with the provisions of GB/T 1.1-2020 "Standardization Work Guidelines Part 1: Structure and Drafting Rules of Standardization Documents".
Drafting.
This document supersedes GB/T 24015-2003 "Environmental Management - Site and Organization Environmental Assessment (EASO)" and is consistent with GB/T 24015-Compared to 2003, aside from structural adjustments and editorial changes, the main technical changes are as follows.
a) The scope has been changed (see Chapter 1, Chapter 1 of the 2003 edition);
b) Added "Assessment Provider", "Assets", "Consequences", "Due Diligence", "Environmental Due Diligence Assessment", "Substances", "Risks", and "Risks and..." the terms and definitions for "opportunity," "approval," and "verification" (see 3.3, 3.4, 3.7, 3.8, 3.11, 3.15, 3.18, 3.19, 3.21, and 3.22) have been revised.
"Assessment Target", "Assessors", "Operating Consequences", "Client", "Environment", "Environmental Factors", "Environmental Issues", "Environmental Management System" Definitions of "organization," "representatives of the assessed entity," and "site" (see 3.1, 3.2, 3.5, 3.6, 3.9, 3.10, 3.13, 3.14, 3.16, 3.17).
3.20 (2003 version, 2.1, 2.2, 2.3, 2.4, 2.5, 2.6, 2.9, 2.10, 2.12, 2.13, 2.14); deleted "site and organization".
Environmental assessment and intervention surveys (see sections 2.7 and 2.11 in the 2003 edition);
c) Principles have been added, including assessment principles and assessment personnel principles (see Chapter 4);
d) The roles and responsibilities of the assessment provider have been added (see 5.2.5);
e) Added agreement on the terms and purpose of the assessment and assessment feasibility (see 5.3.2 and 5.3.5);
f) The report format has been removed (see 5.2 in the 2003 edition);
g) The assessment of evaluators' competence and evaluation has been enhanced, including the determination and application of overall competence, as well as competence assessment (see Chapter 7).
This document adopts ISO 14015:2022 "Environmental management - Guidelines for environmental due diligence assessment".
Please note that some content in this document may involve patents. The issuing organization of this document assumes no responsibility for identifying patents.
This document was proposed and is under the jurisdiction of the National Technical Committee on Standardization of Environmental Management (SAC/TC207).
Introduction
0.1 Background
Organizations are increasingly focused on understanding the projects, assets, and activities of other organizations that are related to their own projects, assets, and activities, or that may be acquired.
Related environmental issues. These issues and their associated business consequences can be assessed using environmental due diligence (EDD) methods.
The assessment can be conducted during operations or at the time of asset acquisition or divestiture, or it can be included as part of a broader due diligence assessment process.
Implementation.
0.2 Application of this document
This document provides guidance on how to conduct EDD assessments. It also establishes a standardized terminology and emphasizes a structured, consistent, transparent, and [unclear] approach.
An objective approach to conducting such environmental assessments provides a foundation. This document is available for use by all organizations worldwide, including small and medium-sized enterprises.
This document is flexible in its application and can be used for organizational self-assessment and/or internal assessment as well as external assessment, regardless of whether it requires hiring.
Third parties. The intended users of this document are organizations, past, present, and future potential users of the specific asset, and those with financial or other interests related to the asset.
Organizations he is interested in (e.g., banks, insurance companies, investors, asset owners, transaction service providers, regulatory enforcement agencies, and other stakeholders) (Related parties). The boundaries of assets can be physical and/or organizational, or intangible. This document may be used in connection with the transfer of responsibilities and obligations.
Relocation-related aspects.
This document covers the roles and responsibilities of all parties involved in the assessment (the client, the assessors, and representatives of the assessed entity), as well as the assessment process.
The various stages of the EDD process [planning, information gathering, verification and/or approval, evaluation, and reporting]. The evaluation process for EDD is shown in Figure 1.
This document may be used in matters relating to the transfer of responsibilities and obligations, as well as to support the fulfillment, implementation, and oversight of compliance obligations. EDD Assessments can help organizations improve or gain a deeper understanding of their performance in accordance with environmental, social, and governance (ESG) guidelines.
0.3 Conduct EDD assessment
The sources of information used during the EDD assessment may include, but are not limited to, environmental management system (EMS) audits, compliance audits, and environmental...
Impact assessment, environmental performance evaluation, on-site investigation or on-site assessment. Additional information sources include historical data, the organization's environmental reports, or...
Sustainability reports show the footprint of an organization, project, or product. Applicable guidelines and methods for generating supporting information may include international, national, or regional standards.
Standards, such as criteria and methodologies for broader due diligence assessments. This involves evaluating both existing and newly acquired information.
EDD assessments aim to draw conclusions about the operational consequences related to environmental aspects, environmental issues, and environmental conditions, including.
---Legacy debts from historical operations, such as pollution;
---Debts incurred from current activities, such as those resulting in pollution or non-compliance with control standards;
---Potential adverse impacts from environmental conditions on the assessed object;
---Failure to make adequate investments to address known current or future risks, such as those related to climate change mitigation or adaptation.
question;
---The process for identifying and determining the consequences of potential risks or opportunities is inadequate;
---Risks arising from inadequate supply chain management and oversight.
These conclusions and related business consequences can be combined with information and conclusions from other parts of the broader due diligence assessment.
Taking all factors into consideration.
EDD assessments should be based on objective information. In the absence of verified and/or approved information, an EDD assessment may be required.
Assessors make professional judgments when assessing available environmental information and drawing conclusions.
Organizations can use the principles and guidelines in this document to gain a deeper understanding of their own environmental issues and to better understand their role in managing the environment.
Adequacy of strategies and arrangements regarding factors, risks, and opportunities.
Figure 1 illustrates the process of implementing an EDD assessment.
Note. The numbers in parentheses refer to the clauses and sub-clauses in this document. Dashed lines indicate that the evaluated object may not necessarily participate in the EDD evaluation described in this document.
Figure 1.The process of implementing EDD assessment
Environmental Management Environmental Due Diligence Assessment Guidelines
1 Scope
This document provides a systematic process for identifying environmental aspects, environmental issues, and environmental conditions, and, where applicable, determining their operational consequences.
The assessment guidelines for conducting environmental due diligence (EDD) in the process.
This document does not provide guidance on how to conduct other types of environmental assessments, such as.
a) Environmental audit;
b) Environmental impact assessment;
c) Environmental performance, efficiency, or reliability assessment;
d) Invasive environmental investigation and remediation.
2 Normative references
This document has no normative references.
3 Terms and Definitions
The following terms and definitions apply to this document.
The assessed object
The assets being evaluated (3.4).
assessor
Personnel with sufficient competence who are designated to conduct or participate in specific environmental due diligence assessments (3.11).
Note. The assessors may be from within or outside the assessed entity (3.1). To fully cover all relevant matters, multiple assessors may be required, for example...
For example, when specific professional knowledge is required.
assessment provider
The organization that conducts an environmental due diligence (EDD) assessment (3.11) on behalf of the client (3.6) (3.16).
Note. The assessor (3.2) is the individual who participates in the EDD assessment.
assets
Organizations (3.16), projects, or things that have potential or actual value.
Note 1.The boundaries of an asset may be physical and/or organizational, or intangible.
Note 2.Tangible assets typically refer to equipment, inventory, and property owned by an organization. Tangible assets are the opposite of intangible assets, which are non-tangible assets, such as leased property.
Leasing, brand, digital assets, usage rights, licenses, intellectual property, reputation, or agreements.
Business consequences the actual or potential consequences or impacts of the environmental problems (3.13) identified and assessed.
Note 1.Results or effects may be financial or other, tangible or intangible, positive or negative, qualitative or quantitative, internal or external.
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 20 pages — is available in the English PDF.
How to Download GB/T 24015-2026
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
GB/T 10003-2026 — Biaxially oriented polypropylene (BOPP) film
GB/T 10004-2026 — Plastic/Plastic laminated films and pouches for packaging
GB/T 10007-2026 — Rigid cellular plastics - Determination of shear properties
Secure payment via Stripe
Payments accepted
GB/T 24015-2026
$495.00