Valid

GB/T 22198-2008Acceptance tests for steam turbine speed control systems (English PDF)

汽轮机转速控制系统验收试验

Preview PDF

This is a limited preview

Buy now to download the full PDF (12 pages)

Need quotation for your management?

Get a formal quotation for GB/T 22198-2008 in 30 minutes.

Issued by

Standardization Administration of China

Level / Type

National · Recommended

Issue date

July 16, 2008

Implementation date

April 1, 2009

Scope

GB/T 22198-2008 is the English-translated version of 汽轮机转速控制系统验收试验.

GB/T 22198-2008 — This standard applies acceptance test driven alternator speed in a given power plant turbine speed control system. Speed \u200b\u200bcontrol system System includes speed control system and overspeed protection system.

For other types of turbines, all suitable may be used. Turbine speed control system and overspeed protection system acceptance test purpose is to verify the manufacturer to ensure that the indicators proposed in the book. through Often, this test is to verify these indicators and GB/T 5578 standard compliance.

These indicators may include. a) speed droop; b) local speed droop; c) When an empty load, corresponding to the lower limit of the speed range synchronizer; d) slow rate of speed control system; e) stability of the speed control system; F) After the rejection to the part load and full load in the speed control system, the maximum instantaneous speed increases value; g) overspeed shutoff setting value; h) speed control system malfunction thrown under maximum instantaneous speed value to full load after.

Other test procedures and selection of pilot projects not included in this standard, agreed upon by both parties.

Found what you need?

Document preview — GB/T 22198-2008

National Standard of the People's Republic of China

ICS
27.040
Classification
K 54

Issued by: Standardization Administration of China

Contents

  • Foreword
  • 1 Scope and purpose
  • 2 Normative references
  • 3 Terminology, symbols, definitions and units

Foreword

This standard is identical with IEC 61064:1991 "turbine speed control system acceptance test" (in English).

This standard is equivalent translation IEC 61064:1991.

For ease of use, this standard made the following editorial changes.

a) Remove IEC 61063:1991 original "preface" and so on;

b) to IEC 61064:1991 in the original part of the body (such as. terminology, etc.), according to China described the proper habits when compiled and unity;

c) to IEC 61064:1991 Part of the original chart will be recompiled.

Appendix A of this standard is a normative appendix.

The standard proposed by China Electrical Equipment Industrial Association.

This standard by the National Standardization Technical Committee turbine (SAC/TC172) centralized.

This standard was drafted. Shanghai Power Equipment Research Institute, Xi'an Thermal Power Research Institute Co., Ltd.

1 Scope and purpose

This standard applies acceptance test driven alternator speed in a given power plant turbine speed control system. Speed \u200b\u200bcontrol system System includes speed control system and overspeed protection system. For other types of turbines, all suitable may be used.

Turbine speed control system and overspeed protection system acceptance test purpose is to verify the manufacturer to ensure that the indicators proposed in the book. through Often, this test is to verify these indicators and GB/T 5578 standard compliance. These indicators may include.

a) speed droop;

b) local speed droop;

c) When an empty load, corresponding to the lower limit of the speed range synchronizer;

d) slow rate of speed control system;

e) stability of the speed control system;

F) After the rejection to the part load and full load in the speed control system, the maximum instantaneous speed increases value;

g) overspeed shutoff setting value;

h) speed control system malfunction thrown under maximum instantaneous speed value to full load after.

Other test procedures and selection of pilot projects not included in this standard, agreed upon by both parties.

2 Normative references

The following documents contain provisions which, through reference in this standard and become the standard terms. For dated references, subsequent Amendments (not including errata content) or revisions do not apply to this standard, however, encourage the parties to the agreement are based on research Whether the latest versions of these documents. For undated reference documents, the latest versions apply to this standard.

GB/T 5578-2007 stationary power generation steam turbine specification (IEC 60045-1:1991, MOD)

3 Terminology, symbols, definitions and units

The standard recommended in Table 1, the symbols given in Table 2 and Figure 1, definitions and units. Table 1 lists the basic terminology, symbols and units,

Table 2 shows the terminology, symbols, definitions and units of this standard specific parameters. Definitions GB/T 5578-2007 are also suitable.

Table 1

Symbol Unit No. term Power or load Pressure Temperature Angular velocity angularspeed Speed \u200b\u200brotationalspeed Voltage Current Oil Motive position or stroke positionorstrokeofservomotors Valve position or stroke positionorstrokeofvalves Wrong throttle position or stroke positionorstrokeofpilots Characteristic time constant of the time, members of the timeconstant, characteristictimeofel-ement MW or kW MPa or bar K or °C rad/s Hz, r/s (r/min) mm, rad or (°) mm, rad or (°) mm, rad or (°) GB/T 22198-2008/IEC 61064:1991

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 12 pages — is available in the English PDF.

Referenced standards

How to Download GB/T 22198-2008

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
12 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

GB/T 22198-2008

$295.00