GB/T 22135-2019Commissioning of electrical, instrumentation and control systems in the process industry - Specific phases and milestones (English PDF)
流程工业中电气、仪表和控制系统的试车各特定的阶段和里程碑
This is a limited preview
Buy now to download the full PDF (51 pages)
Need quotation for your management?
Get a formal quotation for GB/T 22135-2019 in 30 minutes.
Issued by
State Administration for Market Regulation, China National Standardization Administration
Level / Type
National · Recommended
Issue date
June 4, 2019
Implementation date
January 1, 2020
Scope
GB/T 22135-2019 is the English-translated version of 流程工业中电气、仪表和控制系统的试车各特定的阶段和里程碑.
GB/T 22135-2019 is the Chinese standard "Commissioning of electrical, instrumentation and control systems in the process industry - Specific phases and milestones".
Its scope clause reads: This standard defines specific stages and milestones in the commissioning of electrical, instrumentation and control systems in the process industry (see Figure 1).
Pass By way of example, this standard describes the activities of a project after the "installed in place" milestone and before the installation is accepted by the owner.
Various types of related processes/devices. NOTE. This standard assumes that the "device acceptance" milestone occurs after the performance appraisal. If the scope of work is reduced, this standard should also be modified appropriately.
Note. Construction work and pre-commissioning work can be carried out at the same time. Figure 1 Definition of phases and milestones For pharmaceuticals or other industries with special requirements, in addition to complying with current standards, such as China's GMP standards, other standards should also be complied with. [Example.
GAMP (Good Automated Manufacturing Practice)], regulations and regulatory requirements. Its clauses include terms and definitions.
Found what you need?
Document preview — GB/T 22135-2019
National Standard of the People's Republic of China
- ICS
- 25.040.40
- Classification
- N 10
- Replacing
- GB/Z 22135-2008
Issued by: State Administration for Market Regulation, China National Standardization Administration
Contents
- Preface
- Introduction
- 1 Scope
- 2 Normative references
- 3 Terms and Definitions
- 4 General preparation before device acceptance
- 5 Install in place
- 5.1 Mechanical property inspection and testing
- 5.2 Procedure
- 6 Pre-commissioning (mechanical completion)
- 6.1 General
- 6.2 Procedure
- 7 Test drive
- 7.1 General
- 7.2 Procedure
- 8 Performance assessment and device acceptance
- 8.1 General
- 8.2 Conditions for starting performance assessment
- 8.3 Implementation of Performance Assessment
- 8.4 Performance assessment report and assessment
- Appendix A (Informative Appendix) List of Documents Required for Pre-commissioning and Commissioning Phase
- Appendix B (informative) Description of pre-commissioning activities
- Appendix C (Informative Appendix) Mechanical Completion Certificate
- Appendix D (Informative Appendix) Description of Commissioning Activities
- Appendix E (Informative Appendix) Device Acceptance Certificate
- Appendix F (Informative Appendix) Special Matters in the Project
1 Scope
This standard defines specific stages and milestones in the commissioning of electrical, instrumentation and control systems in the process industry (see Figure 1). Pass
By way of example, this standard describes the activities of a project after the "installed in place" milestone and before the installation is accepted by the owner.
Various types of related processes/devices.
NOTE. This standard assumes that the "device acceptance" milestone occurs after the performance appraisal. If the scope of work is reduced, this standard should also be modified appropriately.
Note. Construction work and pre-commissioning work can be carried out at the same time.
Figure 1 Definition of phases and milestones
For pharmaceuticals or other industries with special requirements, in addition to complying with current standards, such as China's GMP standards, other standards should also be complied with.
[Example. GAMP (Good Automated Manufacturing Practice)], regulations and regulatory requirements.
2 Normative references
The following documents are essential for the application of this document. For dated references, only the dated version applies to this article pieces. For undated references, the latest edition (including all amendments) applies to this document.
ISO 10628-2 Chemical and petrochemical industry graphics - Part 2.Graphical symbols
The composition, content and presentation method of IEC 62079 specification
IEC 62424 Process Control Engineering Notation for P
Data Exchange Requirements
ISA-S7.0.01 Instrument Air Quality Standard
3 Terms and Definitions
The following terms and definitions apply to this document.
GB/T 20438.4 | GB/T 20438.5 | GB/T 20438.6 | GB/T 45616.1 | GB/T 11605 | […]
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 51 pages — is available in the English PDF.
Referenced standards
Normative references
ISO 10628 · IEC 62079 · IEC 62424
How to Download GB/T 22135-2019
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
GB/T 10003-2026 — Biaxially oriented polypropylene (BOPP) film
GB/T 10004-2026 — Plastic/Plastic laminated films and pouches for packaging
GB/T 10007-2026 — Rigid cellular plastics - Determination of shear properties
Secure payment via Stripe
Payments accepted
GB/T 22135-2019
$415.00