Superseded

GB/T 21391-2008Measurement of natural gas flow by turbine meter (English PDF)

Preview PDF

This is a limited preview

Buy now to download the full PDF (48 pages)

Need quotation for your management?

Get a formal quotation for GB/T 21391-2008 in 30 minutes.

Issued by

General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China

Level / Type

National · Recommended

Issue date

February 2, 2008

Implementation date

August 1, 2008

Scope

GB/T 21391-2008 (Measurement of natural gas flow by turbine meter) is available as an English-translated PDF.

GB/T 21391-2008 — This standard specifies the measurement conditions, requirements, performance, installation, real-flow calibration and field inspection of gas turbine flow meter (hereinafter referred to as flow meter) for natural gas flow measurement.

The natural gas component measured by the flow meter shall be within the range specified in GB 17820-1999, GB/T 17747.1-1999, GB/T 17747.2-1999 and GB/T 17747.3-1999, AND the true relative density of natural gas is 0.55 ~ 0.80.

This standard specifies that the standard reference conditions for the measurement of natural gas flow and the combustion standard reference conditions for the calorific value measurement are absolute pressure Pn =

Found what you need?

Document preview — GB/T 21391-2008

National Standard of the People's Republic of China

ICS
75.180.30
Classification
E 98

Issued by: General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China

Contents

  • Foreword...3
  • 1 Scope...5
  • 2 Normative references...5
  • 3 Terms, definitions and symbols...6
  • 4 Measurement principle...9
  • 5 Metering performance...10
  • 6 Flow meter requirements...11
  • 7 Installation requirements, use and maintenance...17
  • 8 Flow calculation method and measurement uncertainty estimation...23
  • Appendix A (Normative) Real-flow calibration...29
  • Appendix B (Informative) Other performance characteristics of flow meter...41
  • Appendix C (Informative) Field test of flow meter...46
  • Appendix D (Informative) Example of natural gas flow calculation...48

Foreword

This standard is non-equivalent to the European standard EN 12261.2002 "Gas

flow meter - gas turbine flow meter", makes reference to AGA No.7.2004

"Measurement of fuel gas by turbine meters", ISO 9951.1993 "Measurement of

gas flow in closed conduits - Turbine meters", and JJG 198-1994 "Verification

regulation of velocity flow meter", AND is, combining with the actual

requirements for local use, added with the standard reference conditions for the

calculation of natural gas volume and calorific value, the explosion proof

requirements for using turbine meter to measure the natural gas flow, the

requirements for integrated intelligent flow meter, the calculation for using

turbine meter to measure the natural gas flow, the calculation of compression

factor, the estimation of uncertainty, real-flow calibration, and the application

after calibration, and the other technical provisions.

The main differences between this standard and EN 12261.2002 are as follows.

- ADD Chapter 4 "Measurement principles", Chapter 6 "Flow meter

requirements", Chapter 7 "Installation requirements, use and maintenance",

and Chapter 8 "Flow calculation methods and measurement uncertainty

estimation";

- ADD Appendix B "Additional performance characteristics of the flow meter",

Appendix C "Field test of flow meters", and Appendix D "Example of natural

gas flow calculation".

- DELETE Chapter 4 "Flow meter classification" and some contents on type

tests from Chapter 5 and 6 of EN 12261;

- MODIFY some of the statements that apply to international standards into

the statements applicable to Chinese standard.

Appendix A to this standard is a normative appendix.Appendix B, Appendix C

and Appendix D are informative.

This standard was proposed by China National Petroleum Corporation.

This standard shall be under the jurisdiction of the Oil & Gas Measurement and

Analysis Method Professional Standardization Technical Committee.

The responsible drafting organizations of this standard. National Crude Oil Flow

Measurement Station Chengdu Natural Gas Flow Substation.

The participating drafting organizations of this standard. China Petroleum

Southwest Oil and Gas Field Branch.

Measurement of natural gas flow by turbine meters

1 Scope

This standard specifies the measurement conditions, requirements,

performance, installation, real-flow calibration and field inspection of gas turbine

flow meter (hereinafter referred to as flow meter) for natural gas flow

measurement.

The natural gas component measured by the flow meter shall be within the

range specified in GB 17820-1999, GB/T 17747.1-1999, GB/T 17747.2-1999

and GB/T 17747.3-1999, AND the true relative density of natural gas is 0.55 ~

0.80.

This standard specifies that the standard reference conditions for the

measurement of natural gas flow and the combustion standard reference

conditions for the calorific value measurement are absolute pressure Pn =

0.101325 MPa and the thermodynamic temperature Tn = 293.15 K. It may also

use the contracted pressure and temperature as the reference conditions.

Unless otherwise stated, the pressure referred to in this standard is gauge

pressure.

2 Normative references

The provisions in following documents become the provisions of this Standard

through reference in this Standard. For the dated references, the subsequent

amendments (excluding corrections) or revisions do not apply to this Standard;

however, parties who reach an agreement based on this Standard are

encouraged to study if the latest versions of these documents are applicable.

For undated references, the latest edition of the referenced document applies.

GB 3836.1-2000 Explosive atmospheres - Part 1.Equipment - General

requirements (eqv IEC 60079-0.1998)

GB 3836.2-2000 Electrical apparatus for explosive gas atmospheres - Part

2 Flameproof enclosure d (eqv IEC 60079-1.1990)

GB 3836.4-2000 Electrical apparatus for explosive gas atmospheres - Part

4 Intrinsic safety i (eqv IEC 60079-11.1999)

GB/T 4208 Degree of protection of enclosure (IP code)

GB/T 11062-1998 Natural gas - Calculation of calorific values, density,

relative density and Wobbe index from composition (neq ISO 6976.1995)

GB/T 13610-2003 Analysis of natural gas by gas chromatography

GB/T 15464 General purpose specification for the packaging of

instrumentation products

GB/T 17747.1-1999 Natural gas - Calculation of compression factor - Part 1.

Introduction and guideline (eqv ISO 12213-1.1997)

GB/T 17747.2-1999 Natural gas - Calculation of compression factor - Part 2.

Calculation using molar (eqv ISO 12213-2.1997)

GB/T 17747.3-1999 Natural gas - Calculation of compression factor - Part 3.

Calculation using physical properties (eqv ISO 12213-3.1997)

GB 17820-1999 Natural gas

GB/T 18603-2001 Technical requirements for measuring systems for natural

gas

GB/T 18940-2003 Measurement of gas flow in closed conduits - Turbine

meters (ISO 9951.1993, IDT)

JJG 198 Verification regulation of velocity flow meter

SY/T 6143-2004 Measurement of natural gas flow with standard orifice flow

meter

3 Terms, definitions and symbols

The following terms and definitions apply to this standard.

3.1

Turbine gas meter

It refers to the metering equipment for which the rotation speed and gas

volume flow are in functional relationship when the impeller rotates under the

effect of gas flow. The gas volume flow passing through the flow meter is

obtained based on the number of impeller rotations.

3.2

Rangeability

5.2.2 Error requirements for integrated intelligent flow meter

As for the integrated intelligent flow meter, within its designated flow range, its

error shall not be more than ± 1.5%.

5.3 Repeatability

The repeatability of the flow rate of each flow meter at each flow point under

operating condition shall not exceed 1/3 of the maximum allowable error of the

flow meter. The repeatability of an integrated intelligent flow meter shall not

exceed 1/2 of the maximum allowable error of the flow meter.

5.4 Calibration

It shall, based on the working pressure as specified by the user, calibrate the

flow meter under one or more pressures. If the flow meter is calibrated under

the calibration pressure ptest, the suitable pressure range of this flow meter is

0.5 ptest ~ 2.0 ptest. The choice of flow meter ptest is given in Appendix A.

5.5 Short-term overload

The flow meter shall be capable of operating at a flow rate of 1.2 qmax for 30

minutes without damage, AND its performance is not affected.

5.6 Working temperature range

The temperature range of the gas flow that complies with the performance

requirements of the flow meter shall be at least -10 °C ~ 40 °C.

5.7 Installation conditions

The influence of the installation conditions on the flow meter shall not exceed

1/3 of the maximum allowable error as specified in Table 2.The test of influence

of the installation conditions on the flow meter is described in Appendix E of

GB/T 18940-2003.

5.8 Maximum allowable pressure loss

The manufacturer shall provide pressure loss data for the flow meter or flow

meter components of various types and caliber. For more details, SEE

Appendix B.

6 Flow meter requirements

6.1 General

Normally on the flow meter shall be provided with at least one pressure taps for

measurement, in order to measure the static pressure at the turbine impeller

under measurement conditions. This pressure tap is marked with "pm"; if there

are more than one "pm" pressure taps, when using the air under normal

pressure (± 10 kPa) is used for test, the difference between the pressure

readings at each pressure tap shall not exceed 50 Pa.

6.4.2 Other pressure taps

The other pressure taps on the flow meter are marked with "p".

6.4.3 Size

The diameter of the circular pressure tap shall be between 3 mm and 12 mm,

AND its length shall be equal to the aperture. In addition, the others shall comply

with the provisions of SY/T 6143-2004.

The size of the grooved pressure tap in the direction of flow shall be at least 2

mm, the maximum size of 10 mm, cross-se...

......

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 48 pages — is available in the English PDF.

Referenced standards

How to Download GB/T 21391-2008

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
48 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

GB/T 21391-2008

$120.00