Valid

GB/T 18269-2024Hand tools for live working with 1 kV AC, 1.5 kV DC and below (English PDF)

交流1 kV、直流1.5 kV及以下电压等级带电作业用手工工具

Preview PDF

This is a limited preview

Buy now to download the full PDF (46 pages)

Need quotation for your management?

Get a formal quotation for GB/T 18269-2024 in 30 minutes.

Issued by

State Administration for Market Regulation, China National Standardization Administration

Level / Type

National · Recommended

Issue date

September 29, 2024

Implementation date

April 1, 2025

Scope

GB/T 18269-2024 is the English-translated version of 交流1 kV、直流1.5 kV及以下电压等级带电作业用手工工具.

GB/T 18269-2024 — This document specifies the hand tools for live working at voltage levels of 1 kV AC and 1.5 kV DC and below (referred to as "live working" in the document).

The technical requirements and inspection rules for hand tools for live working are described, and the test methods for hand tools for live working are given. Assortment of hand tools.

This document applies to insulated hand tools and coverings used for live working at voltage levels of AC 1kV, DC 1.5kV and below. Design, manufacture and testing of insulated hand tools and hybrid hand tools.

Found what you need?

Document preview — GB/T 18269-2024

National Standard of the People's Republic of China

ICS
13.260; 25.140
Classification
F 20
Replacing
GB/T 18269-2008

Issued by: State Administration for Market Regulation, China National Standardization Administration

Contents

  • Preface
  • 1 Scope
  • 2 Normative references
  • 3 Terms and Definitions
  • 4 Categories
  • 5 Technical Requirements
  • 6 Experiment
  • 7 Inspection Rules
  • 8 Marking, packaging, transportation and storage
  • Appendix A (Informative) Structure Number Comparison List
  • Appendix B (Informative) List of Technical Differences and Their Causes
  • Appendix C (Informative) Classification diagram of hand tools for live working and list of commonly used tools
  • Appendix D (Normative) Design requirements for assembly tools
  • Appendix E (Normative) Calculation of insulation coverage length and allowable leakage current
  • Appendix F (Normative) Locking test mold design requirements
  • Appendix G (Normative) Defect Classification and Testing
  • References

Foreword

This document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for standardization work Part 1: Structure and drafting rules for standardization documents" Drafting.

This document replaces GB/T 18269-2008 "Insulating hand tools for live working at voltage levels of 1 kV AC, 1.5 kV DC and below" Compared with GB 18269-2008, in addition to structural adjustments and editorial changes, the main technical requirements have changed as follows.

a) The scope of application has been changed (see Chapter 1, Chapter 1 of the 2008 edition);

b) The definitions of the terms "sheathed insulated hand tools" and "insulated hand tools" have been changed (see 3.2, 3.3, 3.1, 3.2 of the 2008 edition).

c) Added definitions of the terms "hand tool", "combined hand tool", "end", "assembled tool" and "hand guard" (see 3.1, 3.4, 3.5, 3.6 and 3.7);

d) Added the classification, schematic diagram and list of commonly used tools for hand tools (see Chapter 4);

e) The requirements for hand tool safety in the general requirements have been changed (see 5.1.1, 4.1.1 of the 2008 edition);

f) The requirements for mechanical properties of hand tools in the general requirements have been changed (see 5.1.2, 4.1.2 and 4.1.3 of the 2008 edition);

g) Deleted the relevant requirements for the use of insulating materials in hand tools in the general requirements (see 4.1.5 and 4.1.6 of the 2008 edition);

h) The scope of low temperature environment in the general requirements has been changed (see 5.1.5, 4.1.7 of the 2008 edition);

i) The requirements for the locking force of assembled tools in the general requirements have been deleted (see 4.1.8 of the 2008 edition);

j) The requirements for double-ended tools in the general requirements have been changed (see 5.1.4, 4.1.9 of the 2008 edition);

k) The requirements for exposed metal parts in the general requirements have been deleted (see 4.1.10 of the 2008 edition);

l) Added relevant requirements for assembly tools (see 5.2.1);

m) Changed the requirements for screwdrivers and wrenches in the specific requirements, and changed the dimensions of the conductor part of the end in the flat-blade screwdriver diagram Requirements. The type of wrench has been changed (see 5.2.2, 5.2.3, 4.2.1 of the 2008 edition);

n) Added the types of screwdrivers and technical requirements for screwdrivers with replaceable tips, added the illustration of adjustable wrench and the requirements for protective Hand requirements (see 5.2.2, 5.2.3);

o) Changed the terms "hand pliers", "stripping pliers", "cable cutters" and "cable cutting tools" to "hand pliers" and changed the description of the requirements for the insulation layer of the hand guard of the pliers.

(see 5.2.4, 4.2.2 of the 2008 edition);

p) Added insulation diagrams of adjustable clamps and multi-function clamps (see 5.2.4);

q) Changed the description of the requirements for the insulation layer of the tool guard (see 5.2.5, 4.2.3 of the 2008 edition);

r) Added technical requirements for scissors (see 5.2.6);

s) Changed the requirements for the insulation layer of the tweezers hand guard and the description of the terminal (see 5.2.7, 4.2.4 of the 2008 edition);

t) The requirement for fully insulated tweezers has been deleted (see 4.2.4 of the 2008 edition);

u) The requirement that the test results should have a 5% error in the test environment conditions has been deleted (see 5.1 of the 2008 edition);

v) The methods of appearance and dimensional inspection during the test have been changed (see 6.2, 5.2 of the 2008 edition);

w) The impact test was changed and the test method b) in the mechanical impact test was deleted (see 6.3, 5.3 of the 2008 edition);

x) The expression of test conditions in electrical tests has been changed (see 6.4.1, 5.4.1 of the 2008 edition);

y) Changed the term "coated insulated tools" in the electrical test to "coated insulated tools" and "mixed insulated tools" (see 6.4.2, 2008 edition).

5.4.2);

z) Added requirements for the conductivity of test water in electrical tests (see 6.4.1, 6.4.2.1);

aa) Added the test method for assembled tools in electrical tests (see 6.4.2.2);

bb) Changed the adhesion test to adhesion test, and changed the working end to end (see 6.6, 5.6 of the 2008 edition);

cc) Changed the criteria for judging the results of the insulation layer test of the whole tool in the adhesion test (see 6.6.1.4, 2008 edition) 5.6.4);

dd) Added adhesion test for mixed insulating tools and moving parts (see 6.6.2, 6.6.3);

ee) Changed the fuel types and specific requirements in the flame retardancy test (see 6.7, 5.7 of the 2008 edition);

ff) The handle and handgrip in the mechanical test were changed to clamp handles. At the same time, the requirements for the rotation angle in the torsion test were increased.

Requirements for tweezers test specimens in the test (see 6.8.1, 6.8.2, 5.8.1, 5.8.2 of the 2008 edition);

gg) Added general requirements for locking test (see 6.9.1);

hh) Changed the tools with spring steel balls and screw-fastening tools to non-mechanical locking tools and mechanical locking tools, and changed the non-Parameters of the test piece in the mechanical locking tool (see 6.9.2, 6.9.3, 5.9.1, 5.9.2 of the 2008 edition);

i) The type test procedure has been changed (see 7.1, 6.1 of the 2008 edition);

j) Modified the number of products in the sampling test (see 7.2, 6.2 of the 2008 edition);

kk) Added relevant requirements for preventive testing (see 7.5);

l) The description of the voltage in the double triangle diagram in the marking has been changed (see 8.1.4, 7.1.3 of the 2008 edition);

mm) The instructions on other identification in the marking have been deleted (see 7.1.5 of the 2008 edition);

nn) Deleted the requirements for box materials during transportation (7.3 of the 2008 edition);

oo) Deleted the quality assurance system (see Chapter 8 of the 2008 edition);

pp) Added normative appendixes on design requirements for assembly tools, design requirements for locking test dies, and defect classification and testing (see Appendix Appendix D, Appendix F and Appendix G).

This document is modified to adopt IEC 60900:2018 "Live working - Manual work for voltage levels of 1 kV AC and 1.5 kV DC and below" Tool".

Compared with IEC 60900:2018, there are more adjustments in structure. Appendix A gives the structural number changes between the two documents.

According to the list.

This document has many technical differences compared with IEC 60900:2018.

Appendix B provides a list of technical differences and their causes.

Compared with IEC 60900:2018, this document has made the following editorial changes.

--- To be consistent with my country's standard system, the name of this document is changed to "Live Work of AC 1kV, DC 1.5kV and below voltage levels Industrial Hand Tools";

--- Deleted the informative Appendix B and Appendix H.

1 Scope

This document specifies the hand tools for live working at voltage levels of 1 kV AC and 1.5 kV DC and below (referred to as "live working" in the document).

The technical requirements and inspection rules for hand tools for live working are described, and the test methods for hand tools for live working are given.

Assortment of hand tools.

This document applies to insulated hand tools and coverings used for live working at voltage levels of AC 1kV, DC 1.5kV and below.

Design, manufacture and testing of insulated hand tools and hybrid hand tools.

2 Normative references

The contents of the following documents constitute essential clauses of this document through normative references in this document.

For referenced documents without a date, only the version corresponding to that date applies to this document; for referenced documents without a date, the latest version (including all amendments) applies to this document.

GB/T 2900.55 Electrical terminology - Live working GB/T 3390.2 Manual socket wrench drive square tenon and square hole (GB/T 3390.2-2013, ISO 1174-1:2011, MOD) GB/T 6290 General technical requirements for twist pliers and shear pliers GB/T 14286 Terminology of tools and equipment for live working DL/T 972 Guidelines for quality assurance of tools, devices and equipment for live working DL/T 976 Preventive testing procedures for tools, devices and equipment for live working

3 Terms and definitions

The terms and definitions specified in GB/T 2900.55, GB/T 14286 and the following terms and definitions apply to this standard.

Hand tool

A small hand-held tool that acts on an object with human power or control by the human hand.

Note 1 to entry. Hand tools may be. coated insulated hand tools, insulated hand tools and hybrid hand tools.

Note 2.Hand tools are some common tools, such as assembly tools, screwdrivers, wrenches, pliers, knives, scissors, tweezers, etc.

[Source. GB/T 2900.55-2016, 651-21-19, modified] 3.2 Insulated hand tool insulated hand tool A hand tool made of conductive material and partially or completely surrounded by insulating material.

[Source. GB/T 2900.55-2016, 651-21-20] 3.3 Insulating hand tool Hand tools made entirely or substantially of insulating materials may be lined with conductive materials to increase strength, but no conductive materials may be used as outer linings.

Exposed conductive parts.

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 46 pages — is available in the English PDF.

Referenced standards

How to Download GB/T 18269-2024

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
46 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

GB/T 18269-2024

$770.00