GB/T 17989.1-2020Control charts - Part 1: General guidelines (English PDF)
Also coversGBT17989.1-2020
Open the GB/T 17989.1-2020 preview as PDF
This is a limited preview
Buy now to download the full PDF
Issued by
State Administration for Market Regulation, China National Standardization Administration
Level / Type
National · Recommended
Issue date
March 6, 2020
Implementation date
October 1, 2020
Scope
GB/T 17989.1-2020 (Control charts - Part 1: General guidelines) is available as an English-translated PDF.
GB/T 17989.1-2020 — This part of GB/T 17989 gives the key elements and basic principles of the control chart method, and defines various types of control charts (including general Control chart related control charts, control charts that emphasize process acceptance or online process adjustment, and special control charts). This section only gives basic principles and concepts, and illustrates the relationship between various control chart methods to help in specific situations Choose the most suitable control chart method. This section does not give the statistical control method used in the control chart, which is described in GB/T 17989 Detailed in the other sections of.
Document preview — GB/T 17989.1-2020
National Standard of the People's Republic of China
- ICS
- 03.120.30
- Classification
- A 41
Issued by: State Administration for Market Regulation, China National Standardization Administration
Contents
- Foreword
- Introduction
- 1 Scope
- 2 Normative references
- 3 terms and definitions
Foreword
The plan of GB/T 17989 "Control Chart" is divided into the following 9 parts.
--- Part 1. General guidelines;
--- Part 2. Conventional control chart;
--- Part 3. Acceptance control chart;
--- Part 4. Cumulative and control charts;
--- Part 5. Special control charts;
--- Part 6. Exponentially weighted moving average control chart;
--- Part 7. Multiple control charts;
--- Part 8. Short cycle and small batch control methods;
--- Part 9. Autocorrelation process control chart.
This part is the first part of GB/T 17989.
This section is drafted in accordance with the rules given in GB/T 1.1-2009.
This section replaces GB/T 17989-2000 General Principles and Guidance for Control Charts. Compared with GB/T 17989-2000, the main technical changes
The transformation is as follows.
--- Added "terms and definitions" (see Chapter 3);
--- Added "Symbols" (see Chapter 4);
--- Added "concepts" (see Chapter 5);
--- Deleted "economic considerations" (see Chapter 13 of the.2000 edition).
This section uses the redrafting method to modify and adopt ISO 7870-1..2014 Control Chart Part 1. General Guidelines, and ISO 7870-1.
The technical differences in.2014 and their causes are as follows.
--- Regarding the normative references, this section has made adjustments with technical differences to adapt to China's technical conditions and the situation of adjustment.
The situation is reflected in Chapter 2 "Regulatory Reference Documents", and the specific adjustments are as follows.
* Replace ISO 3534-2 with GB/T 3358.2 equivalent to the international standard (see Chapter 3);
* Added reference to GB/T 17989.2 (see 5.1);
* Added reference to GB/T 17989.3 (see 5.3);
* Added reference to GB/T 17989.4 (see 7.2.3.2).
The following editorial changes have been made in this section.
--- Adjusted the order of references, added references ISO 7870-5, ISO 7870-6, ISO 22514-1, ISO 22514-7.
This part was proposed and managed by the National Technical Committee for Standardization of Statistical Methods (SAC/TC21).
This section was drafted. Huzhou Mingfeng Enterprise Management Consulting Co., Ltd., Xiamen Minghongtang Crafts Co., Ltd., China Standardization Research
Institute, Tsinghua University, Huzhou Hongtuo Enterprise Information Service Co., Ltd., Liyang Market Comprehensive Inspection and Testing Center.
Introduction
Each production, service or management process has certain variations under the influence of various factors. Therefore, the results observed in the process
The results are not the same. The variability of the research process will help to understand its characteristics and provide a basis for taking corresponding measures.
Control charts are the basic tool for statistical process control (SPC). They provide a simple graphical method that can be used for.
a) Determine whether the process is stable, that is, whether the process is running in a system with only random causes, and the process is mutated at this time
Called inherent variation, also known as the process is in a "statistically controlled state";
b) estimate the degree of inherent variation in the process;
c) Compare sample information representing the current state of the process with control limits that reflect this variation to determine if the process variation is consistent
Remain stable or change;
d) identify, investigate and possibly reduce/eliminate the effects of specific mutations that may lead to unacceptable processes
Level;
e) assist in the adjustment process by identifying various variation patterns such as trends, processes, cycles, etc .;
f) determine whether the process is predictable and stable in order to assess whether the process meets specifications;
g) determine whether the measured characteristics in the process meet the expected process capability required to meet product or service requirements;
h) When using statistical models for prediction, provide a basis for process adjustment;
i) Help evaluate the performance of the measurement system.
The main advantage of control charts is that they are easy to draw and use. It is for production or service operators, engineers, managers and operators
The staff provided online indicators on process behavior. However, in order to make the control chart a reliable and efficient
Paragraph, pay attention to the process to be studied, choose the appropriate control chart type, and determine the correct sampling plan.
This section of GB/T 17989 gives the general concepts for the successful design of a control chart.
Control Charts
Part 1. General guidelines
1 Scope
This part of GB/T 17989 gives the key elements and basic principles of the control chart method, and defines various types of control charts (including general
Control chart related control charts, control charts that emphasize process acceptance or online process adjustment, and special control charts).
This section only gives basic principles and concepts, and illustrates the relationship between various control chart methods to help in specific situations
Choose the most suitable control chart method. This section does not give the statistical control method used in the control chart, which is described in GB/T 17989
Detailed in the other sections of.
2 Normative references
The following documents are essential for the application of this document. For dated references, only the dated version applies to this article
Pieces. For undated references, the latest version (including all amendments) applies to this document.
GB/T 3358.2 Statistics Vocabulary and Symbols Part 2. Applied Statistics (GB/T 3358.2-2009, ISO 3534-2..2006,
IDT)
GB/T 17989.2 Control Chart Part 2. General Control Chart (GB/T 17989.2-2020, ISO 7870-2..2013, MOD)
GB/T 17989.3 Control Chart Part 3. Acceptance Control Chart (GB/T 17989.3-2020, ISO 7870-3..2012, MOD)
GB/T 17989.4 Control Chart Part 4. Cumulative and Control Chart (GB/T 17989.4-2020, ISO 7870-4..2011,
MOD)
3 terms and definitions
The terms and definitions defined in GB/T 3358.2 and the following apply to this document. For ease of use, the following is repeated
Some terms and definitions in GB/T 3358.2.
3.1
Controlchart
In order to monitor the process, control and reduce process variability, a series of sample statistic value sequences are plotted in a specific order.
Note 1. The specific order usually refers to the order of time or sample acquisition.
Note 2. Control charts are most effective when used to monitor the characteristics of the final product or service.
[GB/T 3358.2-2009, definition 2.3.1]
3.2
Control limits
A statistical value used to determine the expected degree of stability of a characteristic.
Note 1. Control charts usually have one or two control limits.
Note 2. "Stability" is not only for controlled processes, it can also be for the stability of the target value.
3.3
General control chart Shewhartcontrolchart
Shewhart control chart
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — all pages — is available in the English PDF.
Referenced standards
Normative references
- GB/T 17989.2Control charts - Part 2: Shewhart control charts
- GB/T 17989.2-2020Control charts - Part 2: Shewhart control charts
- GB/T 17989.3Control charts - Part 3: Acceptance control charts
- GB/T 17989.3-2020Control charts - Part 3: Acceptance control charts
- GB/T 17989.4Control charts - Part 4: Cumulative sum charts
- GB/T 17989.4-2020Control charts - Part 4: Cumulative sum charts
GB/T 3358.2 · GB/T 3358.2-2009 · ISO 3534 · ISO 7870
Cited by
- GB/T 46130-2025Guidance for statistical process control for EMC test laboratories
- GB/T 17989.6-2022Statistical method of quality control in production process - Control charts - Part 6: EWMA control charts
- GB/T 17989.2-2020Control charts - Part 2: Shewhart control charts
- GB/T 17989.3-2020Control charts - Part 3: Acceptance control charts
- GB/T 17989.4-2020Control charts - Part 4: Cumulative sum charts
How to Buy GB/T 17989.1-2020
- 1Add to cart. Click the "Buy GB/T 17989.1-2020" button on this page. You can add more standards before checkout.
- 2Checkout. Enter your email and billing details. Payment is processed securely by Stripe (cards, Apple Pay, Google Pay supported).
- 3Instant delivery (0–9 sec). Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4Invoice included. A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
GB/T 17989.2-2020 — Control charts - Part 2: Shewhart control charts
GB/T 17989.3-2020 — Control charts - Part 3: Acceptance control charts
GB/T 17989.4-2020 — Control charts - Part 4: Cumulative sum charts
Secure payment via Stripe
Payments accepted
GB/T 17989.1-2020
$240.00