Valid

GB/T 17215.811-2017Electricity metering equipment ((a.c.) -- Acceptance inspection -- Part 11: General acceptance inspection methods (English PDF)

Preview PDF

This is a limited preview

Buy now to download the full PDF (58 pages)

Need quotation for your management?

Get a formal quotation for GB/T 17215.811-2017 in 30 minutes.

Issued by

General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China

Level / Type

National · Recommended

Issue date

December 29, 2017

Implementation date

July 1, 2018

Scope

GB/T 17215.811-2017 (Electricity metering equipment ((a.c.) -- Acceptance inspection -- Part 11: General acceptance inspection methods) is available as an English-translated PDF.

GB/T 17215.811-2017 — This part of GB/T 17215 specifies a generic method for acceptance testing of AC measuring equipment. This section applies to the production and supply of batches of not less than 50 newly manufactured energy meters.

Found what you need?

Document preview — GB/T 17215.811-2017

National Standard of the People's Republic of China

ICS
17.220.20
Classification
N 22

Issued by: General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China

Contents

  • Foreword
  • 1 Scope
  • 2 Normative references
  • 3 Terms and Definitions
  • 3.1 Data Source
  • 3.2 Sample Type
  • 3.3 Specifications, Values, and Test Results
  • 3.4 Inspection Type
  • 3.5 Type 6 Acceptance Sampling Inspection
  • 3.6 Relevant Terms of Acceptance Sampling Inspection System
  • 3.7 Reception criteria
  • 3.8 Type 8 operating characteristic curve
  • 3.9 Terms related to operational characteristics
  • 3.10 Check Out Quality Concept
  • 3.11 Other Terms
  • 4 Symbols and Abbreviations
  • 4.1 Symbol
  • 4.2 Abbreviations
  • 5 General rule
  • 5.1 Acceptance Test Target
  • 5.2 Acceptance Sampling Plans, Plans and Systems
  • 5.3 Practical and Economic Advantages of Using Standard Sampling Plans
  • 5.4 Agreement of All Parties
  • 5.5 Selection of Sampling Plans and Sampling Plans
  • 5.6 Considerations for Impact Selection
  • 5.7 Disqualification and Nonconformance
  • 5.8 Unqualified classification
  • 5.9 Operating Characteristics (OC) Curves
  • 5.10 Producer Risk (PR) and Consumer Risk (CR)
  • 5.11 AQL, PRQ, LQ, and CRQ
  • 5.12 Transfer Rules for Normal Inspection, Strict Inspection and Relaxation Inspection
  • 5.13 Inspection Level
  • 5.14 Sample size code
  • 5.15 Inspection Site
  • 5.16 Submission of Acceptance Inspection Products
  • 5.17 Sample extraction
  • 5.18 Batch Acceptability
  • 6 100% inspection
  • 6.1 Application of this method
  • 6.2 Batch and Receive Number
  • 6.3 Receiving and not receiving
  • 7 Batch-by-lot inspection
  • 7.1 Method Application
  • 7.2 Sample extraction
  • 7.3 Level of inspection
  • 7.4 Sampling plan
  • 7.5 Normal, tightened and relaxed inspections (see 5.12)
  • 7.6 Operating Characteristics (OC) Curves
  • 7.7 Process Average
  • 7.8 Average Outgoing Quality (AOQ)
  • 7.9 Average Quality of Detection (AOQL)
  • 7.10 Consumer Risk (CR)
  • 7.11 Producer Risk (PR)
  • 8 Isolated Batch Test
  • 8.1 Application Method
  • 8.2 Provisions Procedure
  • 8.3 Limit Quality
  • 8.4 Procedure A
  • 8.5 Program B
  • 8.6 Rules Received and Not Received
  • 9 Batch inspection
  • 9.1 Application Method
  • 9.2 Producer Qualification
  • 9.3 Product Qualification
  • 9.4 Detailed Procedure
  • 10 Batch measurement inspection
  • 10.1 Application Method
  • 10.2 Choice Between "s Method" and "sigma Method"
  • 10.3 Standard Plan
  • 10.4 Preparation
  • 10.5 Standard multivariable "s method" program with independent quality characteristics of combination control
  • 10.6 Independent Characteristics with Combination Control Standard Multivariable "sigma Method"
  • 10.7 Procedures for Continuous Inspection
  • 10.8 Normality and Outliers
  • 10.9 Record
  • 10.10 Normal, tightened and relaxed inspections (see 5.12)
  • 10.11 Inspection and Restoration
  • 10.12 Conversion between "s Method" and "sigma Method"
  • 10.13 Consumer Protection
  • 10.14 Operating Characteristic Curve
  • 10.15 Consumer Risk (CR)
  • 10.16 Producer Risk (PR)
  • Appendix A (Normative) Random Number
  • Appendix B (Normative Appendix) Obtaining s or sigma Programs
  • References
  • Figure 1 Sampling plan and program selection process
  • Figure 2 Transfer Rules Figure
  • Fig. 3 OC curve of one sampling scheme with AQL=1.0 (normal inspection)
  • Fig. 4 OC curve of one sampling scheme with AQL=1.0 (tightened test)
  • Fig. 5 Ac=0 sampling scheme OC curve
  • Figure 6 Operation curve of a sampling plan for non-critical nonconforming items (Procedure B)
  • Figure 7 Normal test OC curve for AQL=1.0
  • Figure 8 Strictly Tested OC Curve for AQL = 1.0
  • Figure 9 AQL = 1.0 relaxation test OC curve
  • Table 1 Number of Acceptances for the 100% Inspection Ac
  • Table 2 One-time sampling plan for normal, tightened and relaxed tests (AQL=1.0)
  • Table 3 Example 1 (Batch 80, Inspection Level II)
  • Table 4 Example 2 (Batch 400, Inspection Level II)
  • Table 5 Example 3 (Batch 800, Inspection Level III)
  • Table 6 Sampling scheme for key nonconformities (Ac=0)
  • Table 7 Secondary sampling plan for normal, tightened and relaxed tests (AQL=1.0)
  • Table 8 Calculation of Transfer Score
  • Table 9 One-time sampling OC curve list value of AQL=1.0
  • Table 10. Single sampling scheme for Ac=0 List of OC curves (normal inspection)
  • Table 11 Upper limit of average detection quality (AOQL) for AQL=1.0
  • Table 12 Average Detection Upper Limit (AOQL) of Ac=0 for Sampling Plans
  • Table 13 Consumer risk quality (CRQ) 32 for the AQL=1.0 scheme
  • Table 14 Consumer Risk Quality (CRQ) for Zero Receiver Plan
  • Table 15 Producer Risk (PR) with AQL=1.0
  • Table 16 Producer Risk (PR) for Zero Receiver Plan
  • Table 17 Sampling plans for non-critical nonconformities (Procedure A, LQ=5.0)
  • Table 18 Sampling Plan for Critical Nonconformities (Procedure A)
  • Table 19 Receiving Probability of Zero Receiver Scheme
  • Table 20 One sampling plan for non-critical nonconformities (Procedure B, LQ=5.0)
  • Table 21 Equivalent sample size for one sampling and subsampling 38
  • Table 22 Equivalent acceptances for one sampling and subsampling 38
  • Table 23 Sample size of "s method" and "sigma method" (AQL=1.0)
  • Table 24 S-method sampling plan
  • Table 25 Value of alphan
  • Table 26 "Sigma method" sampling plan
  • Table 27 Receiving Constants for Relaxation Inspection Qualification
  • Table 28 The cU value of the control limit on sample standard deviation
  • Table 29 Normally Tested OC Curve Table Column Values for AQL=1.0
  • Table 30 Strictly Tested OC Curve Table AQL=1.0 Column Value
  • Table 31 Relaxation check OC curve table column value 51 for AQL=1.0
  • Table 32 Consumer Risk Quality of "s Method"
  • Table 33 Consumer Risk Quality (CRQ) for the sigma Method
  • Table 34 Producer Risk (s) of "S Method"
  • Table 35 Producer Risk (PR) for "sigma Method"
  • Table A.1 Random Number

Foreword

GB/T 17215.8 "Acceptance Inspection of AC Measurement Equipment" is divided into the following three parts.

--- Part 11. General Acceptance Test Methods;

--- Part 21. Special requirements for electromechanical active energy meters (Class 0.5, Class 1, and Class 2);

--- Part 31. Particular requirements for static active energy meters (0.2S, 0.5S, 1 and 2).

This part is Part 11 of GB/T 17215.8.

This section was drafted in accordance with the rules given in GB/T 1.1-2009.

This section partially replaces GB/T 3925-1983 "Acceptance Method for Class 2.0 AC Wattmeter" and GB/T 17442-1998 "Level 1 and Level 2 Direct Access Static Power Meter Acceptance Test. Comparing with GB/T 3925-1983 and GB/T 17442-1998 the technical changes are as follows.

--- Related to sampling plans, inspection methods, and acceptance criteria in GB/T 3925-1983 and GB/T 17442-1998 the contents are unified into this section. Test requirements and test methods are specified in Parts 821 and 831 of this standard, respectively;

--- According to ISO 2859 and ISO 3951, modified count sampling inspection procedures and measurement sampling inspection procedures;

--- In accordance with the strictness of inspections, the inspections are divided into normal inspections, relaxed inspections, tightened inspections, and the transfer criteria are stipulated;

--- specifies the selection criteria for batch-by-batch inspection, batch-batch inspection and isolated batch inspection;

--- The standard deviation method (sigma method), sample standard deviation method (s method) and its acquisition procedure are defined for the measurement and acceptance sampling inspection;

--- Specifies acceptance criteria for acceptance testing;

---Distinguish key non-conformities and non-critical non-conformities;

--- Modify the implementation process of measurement test and count test, and stipulate its statistical parameters;

--- Defines the degree of influence of the risk quality of the producer and the risk quality of the consumer on the receiving quality;

--- Modified the random number table.

This section uses the translation method equivalent to the use of IEC 62058-11:2008 "acceptance test of AC measuring equipment, part 11. general test Receive inspection method." this section also made the following editorial changes.

--- Modify the index U, wU, yU, tU, pU, etc. of the second set of wU formulas in the calculation example of 10.5.5 to L;

--- Modify the data used in Figure 9 to the values in Table 31.

1 Scope

This part of GB/T 17215 specifies a generic method for acceptance testing of AC measuring equipment.

This section applies to the production and supply of batches of not less than 50 newly manufactured energy meters.

2 Normative references

The following documents are indispensable for the application of this document. For dated references, only dated versions apply to this article Pieces. For undated references, the latest version (including all amendments) applies to this document.

GB/T 2828.1-2012 Count sampling inspection procedures Part 1. Batch inspection sampling based on AQL Plan (ISO 2859-1:1999, IDT) GB/T 2828.3-2008 Count sampling inspection procedures Part 3. Skipping batch sampling procedures (ISO 2859-3:2005, IDT) GB/T 3358.2-2009 Statistical vocabulary and symbols Part 2. Application statistics (ISO 3534-2:2006, IDT) GB/T 4882-2001 Statistical processing and interpretation of data for normality testing (ISO 5479:1997, IDT) GB/T 6378.1-2008 Measurement and Sampling Inspection Procedures Part 1. Qualitative Single Quality Retrieval Based on Acceptance Quality Limit (AQL) Sampling scheme for batch-by-batch inspection of sex and individual AQL (ISO 3951-1:2005, IDT) ISO 2859-2:1985 Count-sampling inspection program Part 2. Sampling scheme for isolated lot inspections by LQ test [Samplingproceduresforinspectionbyattributes-Part 2: Samplingplansindexedbylimitingquality (LQ)forisolatedlotinspection] ISO 3951-2:2006 Measurement sampling inspection procedure Part 2. Individual quality characteristics searched for by acceptance quality limit (AQL) Sampling procedures for inspection by variables-Part 2.

General specification forsinglesamplingplansindexedbyacceptancequalitylimit(AQL)forlot-by-Lotinspectionofindependentqualitycharacteristics]

3 Terms and Definitions

The terms and definitions defined in GB/T 3358.2-2009 and the following apply to this document. For ease of use, the following is repeated Some terms and definitions in GB/T 3358.2-2009.

Note. In this section, the term "instrument" refers to any type of measurement equipment within the scope of SAC/TC104/SC1, ie, active or reactive energy meters, time switches, and patterns.

Wave control receiver etc. The terms "customer" and "consumer" mean "manufacturer" and "supplier".

3.1 Sources of data

3.1.1

Characteristic Features that can be distinguished.

Note 1. Characteristics can be inherent or given.

Note 2. Characteristics can be qualitative or quantitative.

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 58 pages — is available in the English PDF.

Referenced standards

How to Download GB/T 17215.811-2017

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
58 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

GB/T 17215.811-2017

$845.00