GB/T 17215.676-2018Electricity metering data exchange -- The DLMS/COSEM suite -- Part 76: The 3-layer, connection-oriented HDLC based communication profile (English PDF)
Also coversGBT17215.676-2018
Open the GB/T 17215.676-2018 preview as PDF
This is a limited preview
Buy now to download the full PDF
Issued by
State Administration for Market Regulation, China National Standardization Administration
Level / Type
National · Recommended
Issue date
December 28, 2018
Implementation date
July 1, 2019
Scope
GB/T 17215.676-2018 (Electricity metering data exchange -- The DLMS/COSEM suite -- Part 76: The 3-layer, connection-oriented HDLC based communication profile) is available as an English-translated PDF.
GB/T 17215.676-2018 — This part of GB/T 17215.6 specifies HDLC-based connection-oriented DLMS/COSEM three-layer communication configuration.
Document preview — GB/T 17215.676-2018
National Standard of the People's Republic of China
- ICS
- 17.220.20
- Classification
- N 22
Issued by: State Administration for Market Regulation, China National Standardization Administration
Contents
- Foreword
- 1 Scope
- 2 Normative references
- 3 Terms, definitions and abbreviations
Foreword
GB/T 17215 "AC measuring equipment" is divided into several parts, GB/T 17215.6 "DLMS/COSEM component electrical measurement data
Exchange is divided into the following sections.
--- Part 10. Intelligent Measurement Standardization Framework;
--- Part 11. DLMS/COSEM communication configuration standard template;
--- Part 31. Local area network use based on twisted pair carrier signals;
--- Part 46. Data link layer using HDLC protocol;
--- Part 47. DLMS/COSEM transmission layer based on IP network;
--- Part 53. DLMS/COSEM application layer;
--- Part 61. Object Identification System (OBIS);
--- Part 62. COSEM interface class;
--- Part 73. Wired and wireless M-Bus communication configurations for local and community networks;
--- Part 76. HDLC-based connection-oriented three-layer communication configuration;
--- Part 91. Communication configuration using the WEB service to access the COSEM server via CAS;
--- Part 97. Communication configuration based on TCP-UDP/IP network.
This part is the 76th part of GB/T 17215.6.
This part is drafted in accordance with the rules given in GB/T 1.1-2009.
This section uses the translation method equivalent to IEC 62056-7-6.2013 "Electrical Measurement Data Exchange DLMS/COSEM Components Sections 7-6
Part. HDLC-based connection-oriented Layer 3 communication configuration.
The documents of our country that have a consistent correspondence with the international documents referenced in this part are as follows.
---GB/T 17215.646-2018 Electrical measurement data exchange DLMS/COSEM components - Part 46. Based on HDLC
Data link layer of the protocol (IEC 62056-46.2002, IDT);
---GB/T 17215.653-2018 Electrical Measurement Data Exchange DLMS/COSEM Components Part 53. DLMS/CO-
SEM application layer (IEC 62056-5-3..2017, IDT);
--- GB/T 19897.1-2005 Automatic meter reading system - Low-level communication protocol - Part 1. Direct local data exchange (IEC 62056-
21.2002, MOD);
--- GB/T 19897.3-2005 Automatic meter reading system - Low-level communication protocol - Part 4. Connection-oriented asynchronous data exchange
Physical layer service process (IEC 62056-42.2002, IDT).
This section has made the following editorial changes.
--- The standard name was changed from part 7-6 to part 76.
1 Scope
This part of GB/T 17215.6 specifies HDLC-based connection-oriented DLMS/COSEM three-layer communication configuration.
2 Normative references
The following documents are indispensable for the application of this document. For dated references, only dated versions apply to this article.
Pieces. For undated references, the latest edition (including all amendments) applies to this document.
IEC 62056-21.2002 Electrical measurement data exchange, meter reading, rate and load control - Part 21. Direct local data exchange
(Electricitymeteringdataexchangeformeterreading,tariffandloadcontrol-Part 21.Directlocal
Dataexchange)
IEC 62056-42.2002 Electrical measurement data exchange, meter reading, rates and load control - Part 42. Connection-oriented asynchronous data
Physical layer services and processes exchanged (Electricitymeteringdataexchangeformeterreading,tariffandloadcon-
trol-Part 42. Physicallayerservicesandproceduresforconnection-orientedasynchronousdataex-
Change)
IEC 62056-46.2002 Data exchange for metering, rate and load control - Part 46. s
Data link layer (Electricity metering-Dataexchangeformeterreading, tariffandloadcontrol-Part 46.
DatalinklayerusingHDLCprotocol)
Amendment1.2006
IEC 62056-5-3.2013 Electrical Measurement Data Exchange DLMS/COSEM Components Part 5-3. DLMS/COSEM
Use layer (Electricity meteringdataexchangeTheDLMS/COSEMsuitePart 5-3. DLMS/COSEMapplica-
Tionlayer)
3 Terms, definitions and abbreviations
The following abbreviations apply to this document.
AA. Application Association (ApplicationAssociation);
AARQ. Application Connection Request - one of the ACPDUs of the ACSE (A-AssociateRequest-anAPDU of theACSE);
ACSE. Connection Control Service Element (AssociationControlServiceElement);
AL. Application Layer (ApplicationLayer);
APDU. Application Layer Protocol Data Unit (ApplicationLayerProtocolDataUnit);
ASO. Application Service Object (ApplicationServiceObject);
Client. The site requesting service, in the HDLC-based connection-oriented three-layer communication configuration as the primary station (Astation, asking
forservices.Inthecaseofthe3-layer,COHDLCbasedprofileitisthemasterstation);
.cnf. confirm the service primitive (confirmserviceprimitive);
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — all pages — is available in the English PDF.
Referenced standards
Normative references
IEC 62056
How to Buy GB/T 17215.676-2018
- 1Add to cart. Click the "Buy GB/T 17215.676-2018" button on this page. You can add more standards before checkout.
- 2Checkout. Enter your email and billing details. Payment is processed securely by Stripe (cards, Apple Pay, Google Pay supported).
- 3Instant delivery (0–9 sec). Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4Invoice included. A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
GB/T 17215.211-2021 — Electricity metering equipment(AC) - General requirements, tests and test conditions - Part 11: Metering equipment
GB/T 17215.221-2021 — Electricity metering equipment(a. c. ) - General requirements, tests and test conditions - Part 21: Tariff and load control equipment
GB/T 17215.231-2021 — Electricity metering equipment (AC) - General requirements, tests and test conditions - Part 31: Product safety requirements and tests
Secure payment via Stripe
Payments accepted
GB/T 17215.676-2018
$210.00