Valid

GB/T 14598.8-2008Electrical relays -- Part 20: Protection systems (English PDF)

Preview PDF

This is a limited preview

Buy now to download the full PDF (18 pages)

Need quotation for your management?

Get a formal quotation for GB/T 14598.8-2008 in 30 minutes.

Issued by

Standardization Administration of China

Level / Type

National · Recommended

Issue date

June 18, 2008

Implementation date

March 1, 2009

Scope

GB/T 14598.8-2008 (Electrical relays -- Part 20: Protection systems) is available as an English-translated PDF.

GB/T 14598.8-2008 — GB/T 14598 provisions of this part of the whole protection system and each part of the composition of performance requirements. This section applies to the protection of the system and its performance impact protection devices and protective devices connected to it.

This section applies to the following objects. --- Protection system or its components manufacturer; --- User protection system; --- Control panel factory; --- Electrical equipment installers; --- Consultant engineer.

Different IEC standard specifies the technical requirements for the various components of the protection system, prepare the relevant parts of this section refers to these standards.

Appendix A lists a block diagram of a protection system, the figure also shows the development of the various components of the system to protect the relevant technical specifications IEC technical committees.

Decided to recommend that the user should be made consistent with the provisions related to the technical committees, these technical committees of the whole protection system be responsible for.

Found what you need?

Document preview — GB/T 14598.8-2008

National Standard of the People's Republic of China

ICS
29.120.70
Classification
K 45
Replacing
GB/T 14598.8-1995

Issued by: Standardization Administration of China

Contents

  • Introduction
  • 1 Scope
  • 2 Normative references
  • 3 Terms and definitions
  • 4 Protection system used in instrument transformers
  • 5 AC input excitation circuit
  • 6 Auxiliary power supply
  • Trip and closing circuit 7
  • 8 Logic circuit
  • 9 Protection system communication link requirement
  • 10 Signal indicates
  • 11 6 insulation
  • 12 Ground
  • 13 General performance and test requirements
  • 14 Test
  • Appendix A (informative) protection system block
  • And transient characteristics of Annex B (informative) Response of the current transformer protection performance of the device
  • Annex C (informative) auxiliary power protection device
  • Annex D (informative) auxiliary circuit ground
  • Annex E (informative) protection against external disturbance
  • Annex F (informative) trip and close circuit
  • Annex G (informative) instrument transformers grounded

Foreword

The partial modification of international standard IEC 60255-20. 1984 "Electrical relays - Part 20. Protection System" (in English).

For ease of use, this section made the following editorial changes.

a) 'this International Standard' to replace the word 'this section';

b) with a decimal point '. 'Instead of as a decimal point,' ';

c) Remove the preface to international standards.

This Part replaces GB/T 14598.8-1995 "Electrical relays - Part 20. Protection System." Section compared with the GB/T 14598.8-1995 The main changes are as follows.

--- Added "Normative References" chapter and referenced standards;

--- Appendix B Note 2 to 3 °;

--- Remove the Appendix H.

This section of the Appendix A, Appendix B, Appendix C, Appendix D, Appendix E, Appendix F, Appendix G is an informative annex.

This part is proposed by the China Electrical Equipment Industrial Association.

The measure in part by the National Standardization Technical Committee centralized relays and protection equipment.

This part mainly drafted by. Jicheng Electronics Co., Xuchang Relay Research Institute, XJ Electric Co., Ltd., Nanjing South Swiss Relays Electric Co., Ltd., Beijing Sifang Automation Co., Ltd., Guodian Nanjing Automation Co., Ltd., Beijing Purple measured Control Limited.

1 Scope

GB/T 14598 provisions of this part of the whole protection system and each part of the composition of performance requirements.

This section applies to the protection of the system and its performance impact protection devices and protective devices connected to it.

This section applies to the following objects.

--- Protection system or its components manufacturer;

--- User protection system;

--- Control panel factory;

--- Electrical equipment installers;

--- Consultant engineer.

Different IEC standard specifies the technical requirements for the various components of the protection system, prepare the relevant parts of this section refers to these standards.

Appendix A lists a block diagram of a protection system, the figure also shows the development of the various components of the system to protect the relevant technical specifications

IEC technical committees.

Decided to recommend that the user should be made consistent with the provisions related to the technical committees, these technical committees of the whole protection system be responsible for.

2 Normative references

The following documents contain provisions which, through reference GB/T 14598 in this section constitute provisions of this section. For dated reference documents Member, all subsequent amendments (not including errata content) or revisions do not apply to this section, however, encouraged to reach under this section Parties to research agreement to use the latest versions of these documents. For undated reference documents, the latest versions apply to this section.

GB/T 2900.49-2004 Electrotechnical terminology - Power System Protection (IEC 60050-448:1995, IDT) GB 1207-2006 electromagnetic voltage transformer (IEC 60044-2:2003, MOD) GB 1208-2006 current transformers (IEC 60044-1:2003, MOD) GB/T 8367 Measuring relays and protection equipment and auxiliary energizing quantity interrupt AC component (ripple) (GB/T 8367-1987, eqv IEC 60255-11. 1980) GB/T 14047 for measuring relays and protection equipment (GB/T 14047-1993, idt IEC 60255. 1988) GB/T 14598.1 Electrical relays - Part 23. Contact performance (GB/T 14598.1-2002, IEC 60255-23:1994, IDT) GB/T 14598.3-2006 Electrical relays - Part 5. Measuring relays and protection equipment insulation coordination requirements and tests (IEC 60255-5:2000, IDT) GB/T 14598.7 Electrical relays - Part 3. dependent or independent time Single input energizing quantity measuring relays (GB/T 14598.7-1995, idt IEC 60255-3. 1989) GB/T 14598.13 Electrical relays - Part 22-1. Electrical disturbance tests for measuring relays and protection equipment --- 1MHz Burst immunity test (GB/T 14598.13-2008, IEC 60255-22-1:2007, MOD) GB/T 15166 (all parts) AC high voltage circuit breakers

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 18 pages — is available in the English PDF.

Referenced standards

Normative references

GB/T 14598 · IEC 60050 · GB 1207-2006 · IEC 60044 · GB 1208-2006 · GB/T 8367 · GB/T 8367-1987 · IEC 60255 · GB/T 14047 · GB/T 14047-1993 · GB/T 14598.1 · GB/T 14598.1-2002 · GB/T 14598.3-2006 · GB/T 14598.7 · GB/T 14598.7-1995 · GB/T 15166

How to Download GB/T 14598.8-2008

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
18 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

GB/T 14598.8-2008

$994.00