GB/T 14099.8-2009Gas turbines -- Procurement -- Part 8: Inspection, testing, installation and commissioning (English PDF)
燃气轮机 采购 第8部分:检查、试验、安装和调试
This is a limited preview
Buy now to download the full PDF (11 pages)
Need quotation for your management?
Get a formal quotation for GB/T 14099.8-2009 in 30 minutes.
Issued by
Standardization Administration of China
Level / Type
National · Recommended
Issue date
April 13, 2009
Implementation date
January 1, 2010
Scope
GB/T 14099.8-2009 is the English-translated version of 燃气轮机 采购 第8部分:检查、试验、安装和调试.
GB/T 14099.8-2009 — This standard specifies the principles and procedures of the system. This section provides a complete and equipment inspection, testing, installation and commissioning guidance.
Found what you need?
Document preview — GB/T 14099.8-2009
National Standard of the People's Republic of China
- ICS
- 27.040
- Classification
- K 56
Issued by: Standardization Administration of China
Contents
- What this standard covers1
- Document data2
What this standard covers
This standard specifies the principles and procedures of the system. This section provides a complete and equipment inspection, testing, installation and commissioning guidance. This section outlines the purchaser and turbine manufacturers in the inspection, coordination, reporting and record-keeping duties.
Document data
International classification (ICS): 27.040.
Chinese classification (CCS): K56.
Estimated length of the Chinese original: 16,183 words.
Adopted international standard: ISO 3977-8-2002, IDT.
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 11 pages — is available in the English PDF.
Referenced standards
How to Download GB/T 14099.8-2009
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
GB/T 14099.1-2004 — Gas turbines -- Procurement
GB/T 14099.2-2026 — Gas turbines - Procurement - Part 2: Standard reference conditions and ratings
GB/T 14099.3-2009 — Gas turbines -- Procurement -- Part 3: Design requirements
Secure payment via Stripe
Payments accepted
GB/T 14099.8-2009
$299.00