Valid

GB/T 14099.4-2010Gas turbines -- Procurement -- Part 4: Fuels and environment (English PDF)

燃气轮机 采购 第4部分:燃料与环境

Preview PDF

This is a limited preview

Buy now to download the full PDF (13 pages)

Need quotation for your management?

Get a formal quotation for GB/T 14099.4-2010 in 30 minutes.

Issued by

Standardization Administration of China

Level / Type

National · Recommended

Issue date

November 10, 2010

Implementation date

March 1, 2011

Scope

GB/T 14099.4-2010 is the English-translated version of 燃气轮机 采购 第4部分:燃料与环境.

GB/T 14099.4-2010 — This section GB/T 14099 gives a gas turbine procurement guide about fuel quality and environmental performance is. The guidelines also pointed out Information about the fuel gas turbine sets and buyers should provide quantification and prediction of the environmental impact of the type of information necessary. Burn Material specification as a reference, and not the rule.

Found what you need?

Document preview — GB/T 14099.4-2010

National Standard of the People's Republic of China

ICS
27.040
Classification
K 56

Issued by: Standardization Administration of China

Contents

  • Introduction
  • Introduction
  • 1 Scope
  • 2 Normative references
  • 3 Terms and definitions
  • 4 Symbols and abbreviations
  • 5 Sets of purchaser and provider of fuel requirements
  • 6 Environmental requirements
  • Appendix A (Informative Appendix) Wobbe Index Calculation
  • References

Foreword

GB/T 14099 "gas turbine procurement" consists of the following components.

--- Part 1. General principles and definitions;

--- Part 2. Standard reference conditions and ratings;

--- Part 3. Design requirements;

--- Part 4. Fuel and Environment;

--- Part 5. Application of the oil and gas industry;

--- Part 6. Combined Cycle;

--- Part 7. Technical information;

--- Part 8. inspection, testing, installation and commissioning;

--- Part 9. Reliability, availability, maintainability and safety.

This section GB/T Part of 414,099.

This part identical with ISO 3977-4:2002 "gas turbine procurement - Part 4. Fuel & Environment" (in English).

ISO 3977-4:2002 replaces ISO 3977:1997 "gas turbine procurement" in the relevant sections. ISO 3977. 1978 is the equivalent of Adopted as GB/T 14099-1993 "gas turbine procurement." And GB/T 14099-2005 instead of GB/T 14099-1993 "burning Gas turbine procurement ", GB/T 14099.1-2004" turbines - Procurement - Part 1. General principles and definitions "and GB/T 14099.2-2004 "turbines - Procurement - Part 2. Standard reference conditions and ratings." Therefore, this part of the corresponding section in place GB/T 14099-2005 corresponding Chapters 8 and 9. And GB/T 14099-2005 has not been replaced by the remaining part is still valid, Until all the rest of the promulgation, when the GB/T 14099-2005 was only partial replacement of all nine.

For ease of use, this section made the following editorial changes.

--- The "international standards in this section" to "this Part";

--- Use the decimal symbol instead of as a decimal comma ",". ",";

--- Delete foreword international standards, national standards increase the preface.

Appendix A of this section is an informative annex.

This part is proposed by China Machinery Industry Federation.

This section of the gas turbine of the National Standardization Technical Committee (SAC/TC259) centralized.

This section is drafted. Jiangsu Electric Power Design Institute, Zhejiang Electric Power Design Institute, Shanghai Power Equipment Research Institute, Shanghai Electric Gate Gas Turbine Power Generation Co., Ltd., China Dongfang Electric Corporation, Zhejiang Zhenhai Power Company Limited jointly.

Introduction

This section GB/T 14099 is to establish the compliance of the gas turbine power plant using enacted. Current gas turbine manufacturing and Install the rapid growth of the world are concerned about the regional and global environmental problems. This section discusses the use of such a gas turbine power plant Fuel and operational issues related to generating emissions. This section details the requirements of the parties should be determined in advance, in order to achieve the shortest possible schedule delays, Optimal performance and minimal environmental impact of building purposes.

Gas turbines - Procurement Part 4. Fuel & Environment

1 Scope

This section GB/T 14099 gives a gas turbine procurement guide about fuel quality and environmental performance is. The guidelines also pointed out Information about the fuel gas turbine sets and buyers should provide quantification and prediction of the environmental impact of the type of information necessary. Burn Material specification as a reference, and not the rule.

2 Normative references

The following documents contain provisions which, through reference GB/T 14099 in this section constitute provisions of this section. For dated reference documents Member, all subsequent amendments (not including errata content) or revisions do not apply to this section, however, encouraged to reach under this section Parties to research agreement to use the latest versions of these documents. For undated reference documents, the latest versions apply to this section.

GB/T 14099-2005 turbines - Procurement (ISO 3977:1991, IDT) GB/T 14099.3-2009 turbines - Procurement - Part 3. Design requirements (ISO 3977-3:2004, IDT) GB/T 15135-2002 turbine Vocabulary (ISO 11086:1996, MOD) GB/T 18345.1-2001 gas turbine flue gas emission - Part 1. Measurement and Evaluation (idt ISO 11042-1:1996) GB/T 18345.2-2001 gas turbine flue gas emission - Part 2. Automated emission monitoring (idt ISO 11042-2.

1996)

ISO 4261:1993 Petroleum products - Fuels (F class) boats and industrial gas turbine fuel specifications ISO 10494:1993 gas turbine and gas turbine engineering measuring airborne noise measurement method

3 Terms and Definitions

GB/T 14099-2005, GB/T 14099.3-2009 and GB/T 15135-2002 established and the following terms and definitions applicable for this part of GB/T 14099 of.

Density

rho =

pref

R · Tref

Which is usually selected reference temperature 15 °C, the reference pressure 101.325kPa.

Integrated gasification combined cycle IGCC Combined cycle thermal process to gasify coal or other low-grade fuel energy.

Fuel nitrogen fuel-boundnitrogen FBN Results in the generation of fuel NOx nitrogen components.

Note. This does not include gaseous nitrogen N2.

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 13 pages — is available in the English PDF.

Referenced standards

How to Download GB/T 14099.4-2010

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
13 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

GB/T 14099.4-2010

$265.00