Valid

GB/T 12726.2-2013Nuclear power plants -- Instrumentation important to safety -- Radiation monitoring for accident and post-accident conditions -- Part 2: Equipment for continuous off-line monitoring of radioactivity in gaseous effluents and ventilation air (English PDF)

核电厂安全重要仪表 事故及事故后辐射监测 第2部分:气态排出流及通风中放射性离线连续监测设备

Preview PDF

This is a limited preview

Buy now to download the full PDF (9 pages)

Need quotation for your management?

Get a formal quotation for GB/T 12726.2-2013 in 30 minutes.

Issued by

Standardization Administration of China

Level / Type

National · Recommended

Issue date

December 17, 2013

Implementation date

August 1, 2014

Scope

GB/T 12726.2-2013 is the English-translated version of 核电厂安全重要仪表 事故及事故后辐射监测 第2部分:气态排出流及通风中放射性离线连续监测设备.

GB/T 12726.2-2013 — This section GB/T 12726 specifies the gaseous discharge after the nuclear power plant accident and flow and ventilation equipment for continuous monitoring of radioactivity offline the general principles for design and performance requirements.

GB/T 12726.1-2013 specifies the technical characteristics of the equipment, test methods, radiation characteristics, electrical characteristics, mechanical characteristics and particular environmental Sex.

Unless otherwise noted, these requirements apply to this section. This section applies to. --- Inert gas activity monitor, the gaseous emissions at the point for measuring the accident and the conditions of the apparatus of radioactive effluents Time change volume activity of inert gas, and with the volume of activity.

The monitor can also be used to determine the timing of the idle period Total emissions of radioactive gases. --- Inert gases, aerosols and monitor specific nuclide (usually refers to different forms of a particular radionuclide iodine include. inorganic iodine, organic iodine gas Sol iodine species), the device used to measure the air or gas ventilation systems (control room ventilation, reactor leak collection, Reactor Pit ventilation, exhaust fuel processing plant, reactor building ventilation exhaust purification) of radioactive volume of activity, and exploration any significant increase of radioactivity measured during and after the accident in the accident.

This section applies only to off-line continuous monitoring equipment that is suitable for those discharged from the total gaseous stream flow or ventilation ducts removed part of the Generation Table of the sample sent to a remote location (through the sampling device) detector and then measuring their equipment.

This section does not apply to those detectors straight Then installed in ventilation ducts or gaseous effluents stream, or installed near the discharge flow or ventilation airflow monitor device, such monitors Belonging to GB/T 12726.4 of the scope of application.

Complete exhaust stream monitoring programs necessary samples for laboratory analysis is not within the scope of this section.

Found what you need?

Document preview — GB/T 12726.2-2013

National Standard of the People's Republic of China

ICS
27.120.20
Classification
F 69
Replacing
GB/T 12726.2-1991; GB/T 12726.5-1997

Issued by: Standardization Administration of China

Contents

  • Preface
  • Introduction
  • 1 Scope
  • 2 Normative references
  • 3 Terms and definitions
  • 4 Design Principle
  • 4.1 Overview
  • 4.2 The basic requirements relating to the function
  • 4.3 Sampling device
  • 5 Function Test
  • 5.1 Overview
  • 5.2 Reference Source
  • 5.3 Performance characteristics. a response to other radioactive gases or particles
  • Test 5.4 Characteristics of air circuit
  • Supplementary Table 2 GB/T 12726.1-2013 specified tests Additional tests

Foreword

GB/T 12726 "after the nuclear power plant safety is important instruments accident and radiation monitoring" is divided into four parts.

--- Part 1. General requirements;

--- Part 2. gaseous effluents and ventilation equipment for continuous monitoring of radioactivity in the offline;

--- Part 3. High range area gamma continuous monitoring equipment;

--- Part 4. Process flow tube or inner tube beside continuous radioactivity monitoring equipment.

This section GB/T Part of 212,726.

This section drafted in accordance with GB/T 1.1-2009 given rules.

This Part replaces GB/T 12726.2-1991 "after the nuclear power plant accident and radiation monitoring equipment Part II. gaseous effluents Specific requirements for radioactive noble gas continuous monitoring equipment "and GB/T 12726.5-1997" after the nuclear power plant accident and radiation monitoring provided Preparation Part V. air radioactivity monitoring equipment. " This portion of the GB/T 12726.2-1991 and GB/T 12726.5-1997 compared the main technical changes are as follows.

--- Added two normative references, respectively IEC 61226 "important nuclear power plant safety instrumentation and control systems and instrumentation Control classification ", ISO 2889:2010" Nuclear Facilities chimneys and ventilation duct sampling airborne radioactive material ";

--- Sampling device is designed taking into account the requirements of ISO 2889;

--- Sampling loop and material consideration of the requirements for gas-proof and anti-virus or corrosive gases;

--- Increasing the material requirements (for example, consider sampling lines and structural materials in aerosol particles and iodine sampling circuit loss as possible Low energy);

--- This section only lists the additional tests, a pilot project under standard test conditions and the amount of change impact test Test items are given in GB/T 12726.1-2013 in;

--- This part of the technical requirements and test methods were revised accordingly.

This section uses the translation method is equivalent to using IEC 60951-2. Radiation monitoring after 2009 "Instrumentation important to safety of nuclear power plants for accident and Part 2. gaseous effluents and ventilation equipment for continuous monitoring of radioactivity offline. " Consistency correspondence with international standards in this part of the country cited the following documents.

--- GB/T 15474-2010 nuclear power plant instrumentation and control functions important to safety classification (IEC 61226:2005, MOD).

This part made the following editorial changes.

--- Delete foreword international standards;

--- According to Chinese customs for some formatting has been modified (for example. Note plus behind ".", followed by a series Item Description will be. "" Replaced by ";");

--- Use the decimal symbol instead of the international standard decimal symbol ",". ",";

--- Will be in "2 Normative references" have been corresponding national standards with international standards to national standards, GB/T 12726.1-2013 "after the nuclear power plant safety is important instruments accident and radiation monitoring - Part 1. General requirements" instead of IEC 60951-1.

2009; ISO 2889 era is wrong to number 2009 2010;

--- Preserve the contents of the currently used only in voltage and frequency of the AC power supply, remove the power supply frequency of 57Hz ~ 61Hz Claim;

--- Table 2 in the first row "5.4.1" in error, to "5.3." this part of the National Nuclear Instrument Standardization Technical Committee (SAC/TC30) and focal points.

This section drafted by. China Nuclear Power Engineering Co., Ltd.

1 Scope

This section GB/T 12726 specifies the gaseous discharge after the nuclear power plant accident and flow and ventilation equipment for continuous monitoring of radioactivity offline the general principles for design and performance requirements.

GB/T 12726.1-2013 specifies the technical characteristics of the equipment, test methods, radiation characteristics, electrical characteristics, mechanical characteristics and particular environmental Sex. Unless otherwise noted, these requirements apply to this section.

This section applies to.

--- Inert gas activity monitor, the gaseous emissions at the point for measuring the accident and the conditions of the apparatus of radioactive effluents Time change volume activity of inert gas, and with the volume of activity. The monitor can also be used to determine the timing of the idle period Total emissions of radioactive gases.

--- Inert gases, aerosols and monitor specific nuclide (usually refers to different forms of a particular radionuclide iodine include. inorganic iodine, organic iodine gas Sol iodine species), the device used to measure the air or gas ventilation systems (control room ventilation, reactor leak collection, Reactor Pit ventilation, exhaust fuel processing plant, reactor building ventilation exhaust purification) of radioactive volume of activity, and exploration any significant increase of radioactivity measured during and after the accident in the accident.

This section applies only to off-line continuous monitoring equipment that is suitable for those discharged from the total gaseous stream flow or ventilation ducts removed part of the Generation

Table of the sample sent to a remote location (through the sampling device) detector and then measuring their equipment. This section does not apply to those detectors straight

Then installed in ventilation ducts or gaseous effluents stream, or installed near the discharge flow or ventilation airflow monitor device, such monitors Belonging to GB/T 12726.4 of the scope of application.

Complete exhaust stream monitoring programs necessary samples for laboratory analysis is not within the scope of this section.

2 Normative references

The following documents for the application of this document is essential. For dated references, only the dated version suitable for use herein Member. For undated references, the latest edition (including any amendments) applies to this document.

Instrumentation important to safety after the accident and radiation monitoring - Part 1 GB/T 12726.1-2013 nuclear power plant. General requirements (IEC 60951-1:2009, IDT) ISO 2889:2010 Nuclear facilities chimneys and ventilation duct sampling airborne radioactive material (Samplingairborneradioactive materialsfromthestacksandductsofnuclearfacilities) IEC 61226 Nuclear power plant instrumentation and control systems important to safety instrumentation and control functions classification (Nuclearpowerplants-Instrumentationandcontrolsystemsimportanttosafety-Classificationofinstrumentationand controlfunctions)

3 Terms and Definitions

Terms and definitions GB/T 12726.1-2013 defined apply to this document.

4 Design Principles

4.1 Overview

This section applies to all types of equipment in addition to the need to meet the requirements of this part, it must also meet the GB/T 12726.1-2013 provisions in general Requirements, unless otherwise indicated.

4.2 Basic requirements and related functions

Gaseous effluents and ventilation equipment for continuous monitoring of radioactivity in the offline generally used to measure the radioactivity of nuclear engineering plant, such as the reactor building or Fuel processing plant chimney ventilation ducts and activity levels gases path. According to the functional requirements, the device can also be used to measure the discharge Radioactivity into the environment, to detect and identify security barrier (such as. containers, pipes) leaks, as well as provide any information or cause to live Useful information about the release of the plant status.

Radioactive emissions to the environment should theoretically be fully measured, but because of effluents released from halogen and particulate activity during an accident More complex measurements, monitoring is generally considered only an inert gas is sufficient. Thus, the monitor should have detected and measured inert gaseous effluents the ability of the gas activity, such inert gas comprises an inert gas to reach equilibrium just mixed fission products to decay 10d old mixture. can You can require multiple devices to cover the effective range of the measurement required.

Since the measurement is transmitted to a remote for gaseous effluents and ventilation samples continuously, so the detection and measurement devices should be installed in easily accessible places, where the environmental conditions should be consistent with the provisions of this part of the equipment design extreme conditions. This requirement also applies to the required dimension Active parts protected sampling device (pump, flow control instruments).

Other portions (sampling nozzle, transfer line) sampling device may be designed and installed in harsh environments. In this case, e.g.

If the monitor is classified according to IEC 61226, which is part of the monitor should be classified as the same category. If you need to identify, located in harsh environments this part should be part of the sampling device in accordance with those specific environmental conditions environmental qualification.

If required, the system should be displayed at a temperature and pressure conditions at the sampling point and the measured volume of the activity related to values, but to be used by the manufacturer and users agreed. If the measuring device calibration conditions and internal conditions are different, manufacturers and users should also agree on how to correct the measurement.

4.3 Sampling device

4.3.1 Overview

Design of sampling device should refer to ISO 2889:2010 and meet the GB/T 12726.1-2013 the general requirements.

Sampling device generally includes one or more components and functional units.

--- Sampling and exhaust pipes;

--- Gas treatment apparatus (e.g. gas cooling means preventing or indoor condensation gas measurement with a device for removing condensate reheating means, in order to remove the residual gas in the collection device with an external blow Importers wash pipe connection connecting pipe);

--- Measuring chamber;

--- Airborne particulate collection device.

- Aerosol Monitors aerosol filtration unit (filter with fixed or filter);

- Only for iodine and noble gas monitors inlet dust filter;

- iodine monitors iodine zeolite or activated carbon filters or filter cartridges (filter replacement device or a fixed filter);

--- Environmental gamma radiation shielding means and/or compensation device;

--- Separate air pump or central pumping station;

--- Air flow measurement and/or control devices;

Pressure, temperature or humidity measurement and/or control unit (depending on the sampling conditions).

4.3.2 Measurement Technology Requirements

According to the measured nuclides respond air or gas filter to remove radioactive particles and iodine or incorporated volume is known and constant capacity Device. In the latter case, the measuring chamber shall be air flow through type, and should be given its volume and pressure, as well as ease of maintenance or Change detector, which should be easily disassembled, and should ensure that the detector can be accurately mounted on repeating geometrical position.

When the pressure-sensitive measurement techniques, should have the pressure measurements. Instrument calibration should take into account the actual operating pressure conditions as appropriate Amendments. Sampling means acceptable change in pressure and pressure specified by the manufacturer. Should be carefully considered to ensure that the ends of the inlet filter Pressure drop on the measurement chamber pressure is very small.

When measuring the flow of sensitive technology should provide flow measurement devices. Instrument calibration should be considered the actual operating pressure and temperature into Row appropriate amendments. Should consider regulating the flow volume measurement means. It is also desirable to provide a flow control device, the flow of the apparatus the adjustment range is sufficient to withstand changes in air pump can be used with any of the intrinsic properties of the filter. It should be based on the effects of different traffic measurement Value amendment.

If necessary, measure atmospheric humidity to control the adjustment means in order to avoid condensate in the pipeline and the monitor. When the relative humidity is over Crossing the manufacturer's specified value, it should provide an alarm signal.

These tests should be applied to all of the response depends on the traffic flow through the monitoring device known sampling and detection means.

When the device is not sensitive to changes in flow rate, but still need to meet the functional requirements of the sample flow, then shall the manufacturer and user Agreement reached between the simple fluid circuit test and any flow alarm test.

When the device is sensitive to changes in flow rate and the sample flow with the discharge flow variations, it should be agreed between manufacturer and user the appropriate test.

5.4.2 Monitor sampling efficiency
5.4.2.1 Overview

Compared to a particle collection efficiency for each given particle size, the monitor entry and collection filter between collection efficiency provided by the manufacturer, it should not differ more than 10%. If the manufacturer and the user agrees, the actual test by particle simulation test instead.

5.4.2.2 Particle size

In diameter and size range of collection efficiency measurement sampling system used by the particles, by the manufacturer and user agreement, for example. root According to the diameter of the aerosol particles being monitored, given collection efficiency filter media for different sizes of particles and the like.

5.4.2.3 Aerosol type

For aerosol collection efficiency tests There are several different types, such as.

--- Fluorescent tracer particles containing non-radioactive aerosols;

--- Non-radioactive aerosol by a latex or polystyrene spheres constituted;

--- Radioactive aerosol.

5.4.2.4 Test Method

It shall have the right by a median aerodynamic diameter of particles injected into the sampling line inlet air samples collected pipeline efficiency test Experience. Particle size distribution may be more decentralized system have smaller geometric standard deviation. Sampling device should be under standard test conditions (flow rate) jobs.

After sampling device is closed, shall determine the amount of aerosols collected on the sampling media. It should also determine the inlet gas monitor available Sol total. This amount can be measured independently of the amount of aerosol sampling obtained or determined by the following.

--- On the inner surface of the inlet pipe and the amount of aerosols collected on other air circuit upstream media surface collected;

--- Amount of aerosol collected downstream of the collecting medium.

5.4.2.5 Collection efficiency is determined

Monitor the collection efficiency (Em) shall formula (1).

100% (1)

Where.

CM --- amount deposited on the collector medium;

CT --- total aerosol.

If feasible, it is recommended to use another method to determine the total amount of aerosol CT as a means of obtaining verification value. Such methods include Through a variety of equipment and measurement techniques (such as spectrophotometers, particle analyzer and a reference sample, etc.) into the device measuring aerosol concentrations.

If the total amount of material from the inside of the total aerosol sample collected to determine the monitor, then the total amount of aerosol CT (activity, quality or micro Grains) by equation (2) gives.

CT = CM CU CD (2)

Where.

CU --- the amount collected from the upper reaches of the medium air circuit surface collected;

CD --- the amount collected in the collection medium downstream.

5.4.3 Feelings of gas or particle retention
5.4.3.1 Overview

Inert gases or particles remain in the air circuit may affect the measured results. Therefore, to prevent such retention, factory design empty Gas loop should be a reasonable choice of materials and structures.

If the manufacturer and the user agreed to instead of the actual test through simulation tests.

5.4.3.2 Requirements

The volume of activity greater than 10 times the decision threshold for injecting inert gas into the monitor. After injection of the monitor and clean air flushing, gas Retention sensitivity test indicated value should be less than 1% of the maximum reading of the results.

A certain concentration of particles injected into the monitor. After injection of the monitor and clean air flushing, feelings of particle retention test finger Indication should be less than 5% of the maximum reading of the results.

Test Method 5.4.3.3 inert gas During the test, the device will require the design of the chemical form of measurement, which is equal to about 10 times the volume of activity determination threshold inert gas injection probe Measuring device, and at least 10 times the response time of the device in the device.

Of the device does not capture system containing the gas to form a closed loop system, and inject sufficient volume of activity in this system an inert gas is equal to 1000 times the decision thresho...

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 9 pages — is available in the English PDF.

Referenced standards

How to Download GB/T 12726.2-2013

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
9 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

GB/T 12726.2-2013

$165.00