GB 27881-2011Safety requirements for working on high voltage equipment underwater (English PDF)

Preview PDF

Also coversGB27881-2011

This is a limited preview

Buy now to download the full PDF

Need quotation for your management?

Get a formal quotation for GB 27881-2011 in 30 minutes.

Issued by

General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China

Level / Type

National · Mandatory

Issue date

December 30, 2011

Implementation date

July 1, 2012

Scope

GB 27881-2011 (Safety requirements for working on high voltage equipment underwater) is available as an English-translated PDF.

GB 27881-2011 — This standard specifies the duties of staff during underwater high-voltage equipment jobs, job safety rules, maintenance work preparation, isolation and maintenance of close, Test requirements, fire safety, as well as alert notifications requirements. This standard applies to surface art AC or DC voltage at 380V ~ 11kV (inclusive) underwater high-voltage equipment operation and maintenance operation.

Found what you need?

Document preview — GB 27881-2011

National Standard of the People's Republic of China

ICS
03.220.40
Classification
R 09

Issued by: General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China

Contents

  • Foreword
  • 1 Scope
  • 2 Terms and Definitions
  • 3 officers of duty
  • 3.1 supervise diving or ROV (ROV) Supervision
  • 3.2 Equipment maintenance personnel
  • 4 Job security rules
  • 4.3 Prior to conduct operations should be carried out risk assessments and ensure.
  • 5 Maintenance job preparation
  • 5.3 should provide adequate lighting to ensure safe access and operation.
  • 5.7 before maintenance, after the test, should be safe discharge.
  • 6 Maintenance isolated close
  • 6.1 maintenance equipment should always be followed.
  • 6.12 should prevent access to the live wire enclosure lock.
  • 7 testing requirements
  • 8 Fire Safety
  • 8.2 extinguishing type apparatus should be compatible with the use of the safety device.
  • 8.3 should be trained personnel and the use of the fire extinguishing apparatus aspects of SOS.
  • 9 Warning Notice
  • 9.2 Warning notices should be durable materials.

Foreword

All technical contents of this standard is mandatory.

This standard was drafted in accordance with rules GB/T 1.1-2009 given.

This standard corresponds to the International Marine Contractors Association (IMCA) "High-voltage equipment Safety code" (AODC060) and "high voltage set

Preparation. ROV safe rules "(IMCAR005), and the degree of non-uniformity AODC060 and IMCAR005

Equivalent.

The standard proposed by the People's Republic of China Ministry of Transport.

This standard and underwater engineering Standardization Technical Committee by the Ministry of Transport salvage.

This standard was drafted. Underwater Engineering Institute of Marine Science, Shanghai Jiao Tong University.

1 Scope

This standard specifies the duties of staff during underwater high-voltage equipment jobs, job safety rules, maintenance work preparation, isolation and maintenance of close,

Test requirements, fire safety, as well as alert notifications requirements.

This standard applies to surface art AC or DC voltage at 380V ~ 11kV (inclusive) underwater high-voltage equipment operation and maintenance

operation.

2 Terms and Definitions

The following terms and definitions apply to this document.

2.1

High voltage highvoltage

But not greater than the voltage exceeds 380V AC or DC voltage of 11kV.

2.2

Close close

Worker can enter the working position to the live conductor is smaller than the distance of 500mm.

3 officers of duty

3.1 supervise diving or ROV (ROV) Supervision

3.1.1 full operational safety related equipment electrical installations responsible for underwater work site.

3.1.2 should have the ability to give commands to engage in the operations of technical personnel, organization and complete the task.

3.1.3 Ensure that all electrical equipment according to the procedure for implementing the operations have been developed.

Carrying out its mandate, it should be able to control and correct implementation of emergency procedures 3.1.4, to protect the right to terminate the operations of health equipment maintenance personnel

Health and safety.

3.2 Equipment maintenance personnel

3.2.1 should have appropriate professional qualifications, familiar and safe work practices related provisions, and the ability to complete the work.

3.2.2 Electrical installations should be noted, warning notices on the device or program description, familiar treatment protocol when subjected to electric shocks and precautions.

3.2.3 shall be subject to high voltage electrical training courses and first aid techniques, master the basic on-site emergency medical rescue methods, and by the appropriate exam

qualified.

3.2.4 Equipment maintenance personnel should be aware, be familiar with the relevant electrical equipment performance, can handle any situation affecting the normal operation of the device,

ROV and diving supervision or monitoring reports.

3.2.5 operating personnel to operate the equipment, maintenance and testing process, should ensure that according to the use manual, in strict accordance with operating procedures.

4 Job security rules

Owner 4.1 devices in the equipment life and it should develop and update appropriate to the type of electrical installation equipment, including maintenance and

Operating and safety rules or procedures needed to close the safety of the device.

4.2 in near high-voltage facility operation, site should have at least two people. Where. a person a job, a person responsible for safety isolation.

4.3 Prior to conduct operations should be carried out risk assessments and ensure.

--- All parties were informed underwater operations to be carried out;

--- The safe operation/copy operations manual to the side of the ship or facility;

--- for the special case of work to make the necessary modifications to the safe operation of writing/Operations Manual.

4.4 In order to avoid a variety of factors make backup emergency generator or accidental activation caused by an accident, the implementation of operations should set the appropriate protective measures.

4.5 During the operation, all personnel should pay attention to the results of the risk assessment, warning notices on the device, and according to the actual need for the precautions

Item or program description.

5 Maintenance job preparation

5.1 equipment maintenance of premises should be left clean, accessible work space and into and out of the channel.

5.2 spare parts, tools, equipment, separation barrier, insulation equipment, as well as job security related items should be kept in good condition and stored in

Within the available container.

5.3 should provide adequate lighting to ensure safe access and operation.

5.4 allows the use of low-voltage self-powered hand tools. These devices should be inspected and tested on a regular basis.

5.5 It is noted from moisture, dirt intrusion electrical equipment, the enclosure should be promptly after the reset operation. Front compartment closed, should be carefully examined to ensure that

Items left behind or loose parts does not occur.

5.6 Before maintenance work on high voltage wires, make sure that all the wires are not live. It should be tested before the voltage meter used to verify

Its function well.

5.7 before maintenance, after the test, should be safe discharge.

5.8 All maintenance and modification of equipment, both the format and specifications shall be credited to the equipment maintenance records and save.

6 Maintenance isolated close

6.1 maintenance equipment should always be followed.

a) secure and reliable isolation;

b) an effective ensure uncharged;

c) directly to ground.

6.2 should avoid live maintenance work. When you must live maintenance work (eg. look for equipment failure), should apply for work permits live, and to develop

Specific safety operating procedures. Unrelated persons may not be close to the work area.

6.3 A person in charge of isolation, a maintenance person occasion, is responsible for device isolation should ensure that the device is not charged and safety, and

It has charged again avoid security measures.

6.4 exposure to high-voltage lines should be supervised. Not immediately when the power switch is turned off to perform maintenance work on the device, the switch should be

Next to arrange third party. The third person should be able to keep in touch with people working on high voltage lines.

6.5 should take protective measures to ensure the isolation of the device will not power on, and should be placed written "warning on the power switch. High Voltage

Circuit is working "signs content.

6.6 before and after maintenance should ensure that the equipment is not charged, and grounded. Ground connection and it should have a sufficient work required to adapt

Ability.

6.7 for isolation switches should be locked to prevent it from moving to the "ON" position. Any possible access to live close to the entrance of the conductor should

Locked in the "off" position.

6.8 maintenance to be provided a sufficient number of locking means, and alert notifications isolation barrier to prevent accidental charging lead wires, and any

Charging conductor alert notifications. Meanwhile, should the switch box before, and after setting the identification flag circuit device.

Terminal 6.9 and the return wire when the main circuit is turned off, respond to possible accidental contact shield isolation is provided, and labeled alert notifications. with

When, special attention should avoid the risk of the reverse power from the voltage or current of the transformer secondary circuit.

6.10 to avoid double insertion, or should a fuse tab connection removal, prohibit the use of an isolated manner as a contactor.

6.11 disconnector operating with the locking device, the locking device should be used is specified, not just use the lock release key or destroyed

Locking means.

6.12 should prevent access to the live wire enclosure lock.

6.13 completed maintenance work line should be tested to ensure that after the switch is turned off before the reset, power will not be connected.

6.14 after the test is completed, it should remove the warning notice, notify the relevant personnel.

7 testing requirements

7.1 should be used in test equipment adapted to the type of measurement, the insulation resistance and dielectric strength should meet the safety requirements.

7.2 All equipment should be tested in test within the validity period, and to maintain a normal working condition.

7.3 test instrument case should always be grounded, and at any time to ensure that it can reliably achieve security features.

7.4 When testing multiple long cable insulation test should be removed before the detector wire insulation.

7.5 Test multiplexed between each two cable insulation, and should lead conductor under test have been measured separately (ground) short-circuited to discharge the electric charge and then

carry out testing.

8 Fire Safety

8.1 risk of fire or heat treatment of the combustible material, fire extinguishing means to be provided.

8.2 extinguishing type apparatus should be compatible with the use of the safety device.

8.3 should be trained personnel and the use of the fire extinguishing apparatus aspects of SOS.

9 Warning Notice

9.1 Warning notices should be clear, straightforward, placed prominently, and in accordance with relevant regulations.

9.2 Warning notices should be durable materials.

Examples of alert notifications about 9.3 as follows.

--- "DO NOT TURN. Some people work on the device";

--- "Danger. high voltage test area";

--- "Warning. high voltage circuits are operating."

END: Draft Version (GB 27881-2011)

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — all pages — is available in the English PDF.

Referenced standards

How to Download GB 27881-2011

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

GB 27881-2011

$70.00