Scope

GB 15579.2-2014 is the English-translated version of 弧焊设备 第2部分:液体冷却系统.

GB 15579.2-2014 — GB 15579 of the provisions of this part of the arc welding and similar processes for cooling torch (gun) used by industrial or professional liquid cooling system System security requirements and structural requirements.

This section applies to stand-alone liquid cooling systems. The cooling system may be provided inside or outside the welding power source. This section does not apply to the refrigeration system.

Note 1. The typical similar processes such as plasma arc cutting and spraying. Note 2. This section does not include electromagnetic compatibility (EMC) requirements.

Found what you need?

Document preview — GB 15579.2-2014

National Standard of the People's Republic of China

ICS
25.160.30
Classification
J 64

Issued by: Standardization Administration of China

Contents

  • Introduction
  • 1 Scope
  • 2 Normative references
  • 3 Terms and definitions
  • 4 1 Environmental conditions
  • 5 Test
  • 5.1 Test conditions
  • 5.2 Measuring Instruments
  • 5.3 Compliance component
  • 5.4 Type test
  • 5.5 Routine Tests
  • 6 Protection against electric shock
  • 6.1 Overview
  • 6.2 Normal use protection against electric shock (direct contact)

Foreword

Part 3 of this chapter are recommended, the rest are mandatory.

GB 15579 "arc welding equipment" is divided into 13 parts.

--- Part 1. Welding power sources;

--- Part 2. Liquid cooling systems;

--- Part 3. Arc and Arc Stabilisation Unit;

--- Part 4. Periodic inspection and testing;

--- Part 5. Wire feeders;

--- Part 6. Load limits for manual metal arc welding power source;

--- Part 7. torch (gun);

--- Part 8. Welding and plasma cutting system gas path means;

--- Part 9. Installation and Use;

--- Part 10. Electromagnetic compatibility (EMC) requirements;

--- Part 11. Electrode holders;

--- Part 12. Coupling devices for welding cables;

--- Part 13. Welding clamp.

This is Part 2 GB 15579's.

This section drafted in accordance with GB/T 1.1-2009 given rules.

This section uses the translation method is equivalent to using IEC 60974-2:2007 "Arc welding equipment - Part 2. Liquid cooling systems." Correspondence between the consistency of the standards of international documents and normative references of the following documents.

--- GB 15579.10-2008 welding equipment - Part 10. Electromagnetic compatibility (EMC) requirements (IEC 60974-10:2007, IDT) this part is proposed by the China Electrical Equipment Industrial Association.

This part of the National Welding Standardization Technical Committee (SAC/TC70) centralized.

This section drafted by. Kai Erda Welder Co., Ltd., Hangzhou, Chengdu tripartite Electric Co., Ltd., Zhejiang Juba Welding Equipment Manufacturing Limited, Shenzhen Christie Technology Co., Ltd., Zhejiang Kende Mechanical & Electrical Co., Ltd., Beijing Times Technology Co., Ltd., Shanghai Positive special welding equipment Manufacturing Co., Ltd., Tangshan Matsushita Industrial Equipment Co., Ltd., Chengdu Institute of electric welding.

1 Scope

GB 15579 of the provisions of this part of the arc welding and similar processes for cooling torch (gun) used by industrial or professional liquid cooling system System security requirements and structural requirements.

This section applies to stand-alone liquid cooling systems. The cooling system may be provided inside or outside the welding power source.

This section does not apply to the refrigeration system.

Note 1. The typical similar processes such as plasma arc cutting and spraying.

Note 2. This section does not include electromagnetic compatibility (EMC) requirements.

2 Normative references

The following documents for the application of this document is essential. For dated references, only the dated version suitable for use herein Member. For undated references, the latest edition (including any amendments) applies to this document.

GB 15579.1-2013 welding equipment - Part 1. Welding power sources (IEC 60974-1:2005, IDT) GB 15579.7-2013 welding equipment - Part 7. torch (gun) (IEC 60974-7:2005, IDT) IEC Part 1060974-10 arc welding equipment. Electromagnetic compatibility (EMC) requirements [Arcweldingequipment-Part 10.

Electromagneticcompatibility (EMC) requirements]

3 Terms and Definitions

GB 15579.1-2013 and GB 15579.7-2013 defined and the following terms and definitions apply to this document.

Cooling power Cooling energy under the rated flow.

Liquid cooling system for reducing the cooling liquid circulation system for arc welding and similar processes the temperature of the device is used with.

4 Environmental conditions

Chapter 4 should be consistent with GB 15579.1-2013 provisions.

5 Test

5.1 Test conditions

Shall comply with the provisions of 5.1 GB 15579.1-2013.

Independent external liquid cooling system can not be tested welding power supply.

Built-in liquid cooling system shall be tested together with the welding power source.

5.2 Measuring Instruments

Measuring instrument accuracy or precision requirements.

a) electrical measuring instruments. 0.5 (± 0.5% of full scale), insulation resistance and dielectric strength measurement exceptions for measuring insulation Precision resistance and dielectric strength of the instrument does not require, but shall be tested for accuracy problems;

b) temperature measurement devices. ± 2K;

c) pressure measuring instruments. 2.5;

d) flow measurement instruments. 2.5.

Compliance 5.3 components GB 5.3 shall comply with the provisions of 15579.1-2013.

5.4 Type inspection

Unless otherwise specified, all type of inspection should be carried out under the same cooling system.

Type test according to the following order.

a) general visual inspection (see GB 15579.1-2013 3.7);

b) Enclosure protection (see GB 15579.1-2013 6.2.1);

c) mechanical requirements (see Chapter 7);

d) Insulation resistance (see 6.1.4);

e) Dielectric strength (see 6.1.5).

Above in this section may be other tests that are not mentioned in any convenient order.

5.5 Routine Tests

Each cooling system should be followed by the following routine tests.

a) general visual inspection (see GB 15579.1-2013 3.7);

b) protection circuit continuity (see GB 15579.1-2013 10.4.2);

c) Dielectric strength (see 6.1.5);

d) general visual inspection (see 3.7 GB 15579.1-2013, such as liquid leakage inspection and checks the traffic regulations according to the manufacturer's Action or pressure sensor).

6 Protection against electric shock

6.1 Overview

6.1.1 General

GB 6.1.1 shall comply with the provisions of 15579.1-2013.

6.1.2 CLEARANCE

GB 6.1.2 shall comply with the provisions of 15579.1-2013.

6.1.3 Creepage distance

GB 6.1.3 shall comply with the provisions of 15579.1-2013.

6.1.4 Insulation resistance

GB 6.1.4 shall comply with the provisions of 15579.1-2013.

Test may be carried out when impassable coolant.

6.1.5 Dielectric strength

GB 6.1.5 shall comply with the provisions of 15579.1-2013.

Test may be carried out when impassable coolant.

6.2 Normal use protection against electric shock (direct contact)

GB 6.2 shall comply with the provisions of 15579.1-2013.

Protection against electric shock (non-direct contact) 6.3 when the accident occurred

6.3.1 Protective measures

GB 6.3.1 shall comply with the provisions of 15579.1-2013.

6.3.2 Input isolation circuit and the welding circuit

GB 6.3.2 shall comply with the provisions of 15579.1-2013.

6.3.3 Input circuit winding insulation and welding circuit between the windings

GB 6.3.3 shall comply with the provisions of 15579.1-2013.

6.3.4 Internal conductors and connections

GB 6.3.4 shall comply with the provisions of 15579.1-2013.

6.3.5 Primary leakage current

GB 6.3.7 shall comply with the provisions of 15579.1-2013.

Connecting 6.4 Power supply Chapter 10 should be consistent with GB 15579.1-2013 provisions.

In addition, the power supply of 125V, rated current plug shall not be less than 70% of the input current, measured the fan motor or pump set in the stall state, the measured value, whichever is higher.

6.5 Welding circuit leakage current between the protective earth

According to the manufacturer's instructions in the liquid cooling system, fill the coolant [see 12.1e)], between the torch and protective earthing system of cooling DC leakage current should not exceed 10mA.

Torch design structure will affect the leakage current value, therefore, compliance checks should be used when conventional analog brass torch.

Compliance check. at room temperature, in the protection of ground and through a hose length of not more than 0.5m and cooling systems connected to the brass Applying a direct current of 500V (analog torch) between the test, see Figure 1. The minimum diameter of the hose is 5mm. It should not be shorter than the length of copper pipe 10cm, the minimum inner diameter of 5mm. During the test, the cooling system should be filled and simulation torch coolant pump should run correctly.

Explanation.

1 --- liquid cooling system;

2 --- hose;

3 --- brass.

Figure 1 Measurement of leakage current structural layout

7 Mechanical requirements

7.1 Basic requirements

Chapter 14 should be consistent with GB 15579.1-2013 provisions.

During the test, the cooling system should be filling coolant.

7.2 Coolant overflow

When filling in accordance with the manufacturer's coolant spilled liquid should not cause electric shock.

Compliance check. a container filled with a liquid coolant, and then 15% of the container capacity of the cooling liquid coolant or 0.25L (both Whichever is the greatest) in not more than 60s time continuously into the container. Then, immediately between the input circuit and the conductive member exposed by 6.1.5 dielectric strength test, the cooling system should be able to withstand the test.

7.3 Hose couplings and hose connections

If the hose connecting means coupling device or hoses require frequent removal and placed on top of or close to live parts live parts bit Set these live parts shall be protected by splash-proof housing, drains or other suitable means. Except the welding circuit live parts.

8 Cooling System

8.1 The maximum rated pressure the manufacturer shall determine the maximum rated pressure of the cooling system can be achieved [see 11.3c) number 12)].

Compliance check. block coolant outlet, pressure was measured.

8.2 Thermal performance requirements

8.2.1 Heating test

Liquid cooling system should be able to work properly without causing any member exceeding its rated temperature at rated cooling power.

Compliance Check. Press the Chapter 10 requirements.

8.2.2 Tolerance test parameters

a) p Pressure. p 10% -2%

b) qV Flow. qV

c) T temperature. T ± 2K

8.2.3 Test duration of fever

GB 7.1.3 shall comply with the provisions of 15579.1-2013.

8.3 Pressure and temperature

Maximum pressure and coolant temperature is 70 °C, the liquid cooling system should work without leakage.

Compliance check. After the heating test immediately blocked coolant outlet of the cooling system, the cooling system to run 120s or to protect the system from Turn off automatically.

9 Unconventional run

9.1 General requirements

Cooling System 9.2 under operating conditions should not be electrical breakdown or fire hazard. When these tests do not take into account any part reached Temperature, and the cooling system is able to continuously work properly. The only requirement is that the cooling system should not become unsafe. These tests it may be performed on other cooling systems.

For the cooling system with a protective device (such as circuit breakers and thermal protection), and if the protective device in the cooling system unsafe Factors before action should be considered to achieve this requirement.

Compliance check.

a) At the bottom of the cooling system put a layer of dry absorbent cotton, extend the cooling system each side 150mm.

b) cooling system started from cold, according to the requirements of 9.2.

c) During the test the cooling system does not appear flames, molten metal, or other material to ignite absorbent cotton phenomenon.

d) After the test within 5min cooling system should be able to withstand the dielectric strength test 6.1.5.

9.2 Stall test

By cooling fan or pump to achieve the required cooling system 8.2, the next generation of the maximum heat output 8.2.1 condition fan or pump blocked Turn, the cooling system runs 4h at rated input voltage or a rated load speed.

NOTE. The purpose of this test is to test the cooling system running under the fan stationary condition. The fan should not be connected to a mechanical or stall.

10 Cooling power

10.1 Test Procedure

Shall be given an ambient temperature of 25 °C (see 8.2.2 test parameter tolerance), the coolant flow is 1L/min, 100% duty cycle Cooling power value (the coolant recommended by the manufacturer), expressed as kW.

The test shall be performed on a separate cooling system.

Built-in liquid cooling system may be supplied with welding power heating. In this case, the test shall be welded together into power Line, and should be in the welding power supply is at the maximum heating situation.

Compliance check.

a) a liquid cooling system is recommended by the manufacturer's instructions and fill in the amount of category Fill the Coolant;

b) a liquid cooling system should be connected to the test circuit in accordance with FIG. 2;

c) adjusting the flow rate of coolant 1L/min ± 0.1L/min;

d) adjusting the electrical heater so that the liquid cooling system inlet temperature above ambient temperature 40K ± 2K;

e) direct measurement of the liquid cooling system of the inlet and outlet temperature, should minimize heat loss test apparatus;

f) the duration of the test is not less than 60min, and to a liquid cooling system temperature does not exceed 2K h time/date.

Cooling power calculated by the following formula.

P = (T1-T2) qmC qm = qVrho where.

P --- cooling power, kW;

T1 --- liquid inlet temperature, K;

T2 --- liquid temperature at the outlet, K;

Temperature difference T1-T2 ---, K;

--- of qm medium flow, kg/s;

--- qV volume flow, L/s;

C --- heat capacity (see Table 1), kJ/(kg · K);

p --- coolant density (see Table 1), kg/L.

Explanation.

1 --- liquid cooling system; 4 --- thermometer (T2); 7 --- electric heater;

2 --- liquid inlet; 5 --- regulating valve; 8 --- thermometer (T1).

3 --- liquid outlet; 6 --- flowmeter;

2 a cooling power test circuit of FIG.

Table 1 Coolant state index at 60 °C

liquid

Heat capacity C

kJ/(kg · K)

Density rho

kg/L

Water/ethanol (50/50) 3.85 0.88 Water/glycol (50/50) 3.44 1.07 Water/propylene glycol (50/50) 3.69 1.04 Water/glycol (10/90) 2.670 1.10 Water/propylene glycol (10/90) 2.846 1.02 Note. Figures in brackets in the first column volume ratio.

11 Nameplate

11.1 Basic requirements

GB 15579.1-2013 shall comply with the provisions of Chapter 15.

11.2 Description

Plate should be divided into three parts.

a) flag independent external liquid cooling system;

b) energy independent external liquid cooling system input;

c) a liquid cooling system.

Order data should be as shown in Figure 3 (see example in Appendix B) will be shown in principle.

Plate size is not specified, you can choose.

Note. If desired, you can give additional information on the dedicated nameplate. Some useful technical information can be incorporated into the manufacturer's technical documentation, see Chapter 12.

For internal liquid cooling system, Figure 3 c) should be added to the contents of the welding power supply nameplate, see the GB 15579.1-2013 Chapter 15.

a) Sign

twenty three)

b) energy input

5) 6) 7)

8) 9), if any

c) a liquid cooling system

10) 11) 12)

3 stand-alone liquid cooling system nameplate diagram consisting principle

11.3 Content

a) Sign

No. 1) manufacturer's name and address and, if necessary, gives sellers, importers, trademark name and country of origin no. 2) model given by the manufacturer (marker) no. 3) design and manufacturing information (such as serial number) no. 4) number of this standard part of the cooling system in order to confirm compliance with this requirement

b) energy input

No. 5) Power supply symbol no. 6) U1V/1 (3) ~ Hz rated supply voltage, number of phases (such as single-phase or three-phase), and the amount of alternating current symbol ~ Fixed frequency (eg 50Hz or 60Hz) no. 7) I1maxA maximum rated input current no. 8) IP protection class, such as IP21S or IP23S no. 9) II class protection symbol (if applicable)

c) a liquid cooling system no. 10) was cooled symbol no. 11) P1L/minkW temperature is 25 °C, coolant flow is the rated cooling power 1L/min when no. 12) pmaxPa (bar) rated maximum pressure Compliance check. visual and data checking.

11.4 Tolerance

The manufacturer shall devices and precision control of the cooling system to meet the nameplate tolerance specified value.

a) P cooling power, kW, not less than the value specified on the nameplate;

b) pmax rated maximum pressure, Pa (bar), can not exceed the value of nameplate.

Compliance check. comparison of data.

12 User's Guide

12.1 documents and information provided by each liquid cooling system should provide contain the following information (if any) Description.

a) Overview;

b) the weight of independent external liquid cooling system and the correct connection method;

c) a variety of indicator and graphical symbols explanation;

d) of the welding power source interface requirements. The control power supply, control signal, static characteristics and connections;

e) the liquid cooling system proper use, such as coolant, cooling conditions, placed, the characteristics of the pump, the cooling power characteristics, antifreeze Agents, additives recommended pressure range;

f) thermal protection restrictions and instructions (if applicable);

g) the degree of protection provided by restrictions on the use (for example, protection class IP21S cooling system suitable for rain or snow Storage and use);

h) welding and cutting should be of particular concern to the working conditions, such as greater danger of electric shock environment;

i) maintain the liquid cooling system;

j) the necessary circuit diagram and a list of recommended spare parts;

k) does not apply to the case and warning coolant and antifreeze having conductivity;

l) If the liquid cooling system need to be placed on an inclined plane, should take measures to prevent tipping;

m) coolant proper handling and disposal;

n) determined in accordance with the requirements of IEC 60974-10 EMC classification (only for independent external liquid cooling systems);

o) to make a statement. nameplate data within an ambient temperature of 20 °C ~ 25 °C range available, and operating temperature range is -10 °C ~ 40 °C.

Compliance Check. read the instructions.

13 Identified

13.1 Universal identification

GB 15579.1-2013 shall comply with the provisions of 17.2.

13.2 Inlet and outlet

At the inlet and outlet of the coolant should be clear, easy to wear identification.

a) imports.

b) export.

In addition, the use of color identification.

13.3 Pressure Warning

If the maximum pressure of the liquid cooling system is higher than 0.5MPa (5bar), shall be accompanied by a warning symbol.

Appendix A

(Informative)

A schematic view of a built-in liquid cooling system and independent external liquid cooling system Explanation.

1 --- coolant tank; 6 --- welding circuit;

2 --- heat exchanger; 7 --- welding transformer;

3 --- pump; 8 --- transformer;

4 --- grounded cooling pipe;. 9 --- contact tip.

5 --- torch;

Figure A.1 built-in liquid cooling system diagram

Explanation.

1 --- coolant tank; 5 --- torch;

2 --- heat exchanger; 6 --- welding circuit;

3 --- pump;. 9 --- contact tip.

4 --- grounded cooling duct;

Figure A.2 independent external liquid cooling system diagram

Appendix B

(Informative)

Plate example independent external liquid cooling system

a) Sign

1) Manufacturer

Address trademark

2) Model 3) Serial number

4) GB 15579.2

b) energy input

5) 6) U1 = 220V/1 ~ 50Hz 7) I1max = 1.2A

8) IP23S 9) -

c) a liquid cooling system

11) P1L/min = 0.55kW 12) pmax = 0.38MPa

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 11 pages — is available in the English PDF.

Referenced standards

How to Download GB 15579.2-2014

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
11 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

GB 15579.2-2014

$195.00