GA/T 527.4-2018Road traffic signal control mode--Part 4: Requirements for implementation of coordinated control mode for arterial roads (English PDF)
道路交通信号控制方式 第4部分:干线协调信号控制方式实施要求
This is a limited preview
Buy now to download the full PDF (7 pages)
Need quotation for your management?
Get a formal quotation for GA/T 527.4-2018 in 30 minutes.
Issued by
Ministry of Public Security
Level / Type
National · Recommended
Issue date
March 26, 2018
Implementation date
March 26, 2018
Scope
GA/T 527.4-2018 is the English-translated version of 道路交通信号控制方式 第4部分:干线协调信号控制方式实施要求.
GA/T 527.4-2018 — This part of GA/T 527 specifies the classification, setting conditions, implementation flow, control period division and control of trunk coordination signal control methods.
Sub-area determination, control mode selection, control parameter determination, control scheme transition, and control scheme evaluation. This section applies to the design and application of trunk line coordination signal control methods.
Found what you need?
Document preview — GA/T 527.4-2018
National Standard of the People's Republic of China
- ICS
- 93.080.30
- Classification
- R 87
Issued by: Ministry of Public Security
Contents
- Foreword
- 1 Scope
- 2 Normative references
- 3 Terms and definitions
- 4 Classification
- 4.1 According to the control method
- 4.2 According to the direction of coordination
- 4.3 According to the control strategy
- 5 Setting conditions
- 5.1 Road conditions
Foreword
GA/T 527 "Road Traffic Signal Control Method" is divided into the following sections.
--- Part 1. General technical conditions;
--- Part 2. Accessibility status and control benefit evaluation indicators and methods;
--- Part 3. Implementation requirements for single-point signal control methods;
--- Part 4. Implementation requirements for trunk line coordination signal control methods;
--- Part 5. Variable guide lane traffic control rules;
--- Part 6. Priority control rules for bus intersections;
--- Part 7. Priority control rules for tram crossings;
--- Part 8. The tidal lane traffic control rules;
--- Part 9. ramp control rules.
This part is the fourth part of GA/T 527.
This part is drafted in accordance with the rules given in GB/T 1.1-2009.
This part is proposed and managed by the Ministry of Public Security Road Traffic Management Standardization Technical Committee.
This section is responsible for drafting the unit. Traffic Management Science Research Institute of the Ministry of Public Security.
Participated in the drafting of this section. Guangdong Zhenye Youkong Technology Co., Ltd.
1 Scope
This part of GA/T 527 specifies the classification, setting conditions, implementation flow, control period division and control of trunk coordination signal control methods.
Sub-area determination, control mode selection, control parameter determination, control scheme transition, and control scheme evaluation.
This section applies to the design and application of trunk line coordination signal control methods.
2 Normative references
The following documents are indispensable for the application of this document. For dated references, only dated versions apply to this article.
Pieces. For undated references, the latest edition (including all amendments) applies to this document.
GB/T 31418 Road Traffic Signal Control System Terminology GA/T 527.1-2015 Road traffic signal control methods - Part 1. General technical conditions GA/T 527.2 Road traffic signal control methods - Part 2. Assessments and methods
3 Terms and definitions
The following terms and definitions as defined in GB/T 31418, GA/T 527.1-2015 apply to this document.
Intercept flow control trafficflowmetering to alleviate over-saturation in a specific area or avoid queuing overflow at the bottleneck intersection, reduce the signal control parameters of several upstream intersections to reduce Signal control measures to enter a specific area of the vehicle and equalize the queues at each intersection.
4 Classification
4.1 According to the control method
According to the coordinated control mode of trunk lines, it is divided into trunk line timing coordination, trunk line induction coordination and trunk line adaptive coordination.
4.2 According to the direction of coordination
According to the direction of trunk coordination, it is divided into one-way coordination and two-way coordination.
4.3 According to the control strategy
According to the coordinated control strategy of the trunk line, it is divided into green wave coordination and interception control.
5 Setting conditions
5.1 Road conditions
To implement trunk coordination signal control, the following road conditions should be met.
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 7 pages — is available in the English PDF.
Referenced standards
Normative references
How to Download GA/T 527.4-2018
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
GB/T 31418-2025 — Terminology for road traffic signal control systems
GA/T 527.1-2015 — Road traffic signal control mode - Part 1: General technical requirements
GA/T 527.2-2024 — Road traffic signal control mode - Part 2: Evaluation index and methods for traffic state and control performance
Secure payment via Stripe
Payments accepted
GA/T 527.4-2018
$145.00