EJ/T 20150.18-2018Post-irradiation inspection of PWR rod-bundle fuel assemblies-Part 18: Technical requirements for fuel rod sampling (English PDF)
压水堆棒束型燃料组件辐照后检查 第18部分:燃料棒取样技术要求
This is a limited preview
Buy now to download the full PDF
Need quotation for your management?
Get a formal quotation for EJ/T 20150.18-2018 in 30 minutes.
Level / Type
National · Recommended
Issue date
December 28, 2018
Implementation date
March 1, 2019
Scope
EJ/T 20150.18-2018 is the English-translated version of 压水堆棒束型燃料组件辐照后检查 第18部分:燃料棒取样技术要求.
EJ/T 20150.18-2018 is the Chinese industry standard "Post-irradiation inspection of PWR rod-bundle fuel assemblies-Part 18: Technical requirements for fuel rod sampling".
It was issued on December 28, 2018, and took effect on March 1, 2019. It is in force.
Found what you need?
Document preview — EJ/T 20150.18-2018
Contents
- Document data
1 Document data
Sector: Nuclear (industry standard).
Date of issue: 2018-12-28.
Date of implementation: 2019-03-01.
Status: valid.
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — all pages — is available in the English PDF.
How to Download EJ/T 20150.18-2018
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Fast delivery
After payment you'll receive an email confirmation. The English PDF is sent to the same address, usually within minutes and at the latest within 1 business day.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
EJ/T 20150.19-2018 — Post-irradiation inspection of pressurized water reactor bundles - Part 19: Tensile test for fuel cladding tubes
EJ/T 20150.17-2018 — Post-irradiation inspection of pressurized water reactors - Part 17: Analysis of hydrazine and hydraz
EJ/T 20150.21-2018 — Post-irradiation inspection of pressurized water reactor bundle beam assemblies - Part 21: Internal pressure burst test for fuel cladding tubes
EJ/T 20150.18-2018
$180.00