DL/T 860.4-2004Communication networks and systems in substations. Part 4: System and project management (English PDF)
变电站通信网络和系统 第4部分:系统和项目管理
DL/T 860.4 | Evolution and historical versions
| Std ID | Title | Status |
|---|---|---|
| DL/T 860.4-2018 | Power automation communication networks and systems - Part 4: Systems and project management | Valid |
| DL/T 860.4-2004 | Communication networks and systems in substations. Part 4: System and project management | Obsolete |
DL/T 860.4-2004 is obsolete. It has been replaced by DL/T 860.4-2018. This page sells the obsolete edition, for projects and contracts that still cite it.
This is a limited preview
Buy now to download the full PDF
Need quotation for your management?
Get a formal quotation for DL/T 860.4-2004 in 30 minutes.
Issued by
National Development and Reform Commission
Level / Type
National · Recommended
Issue date
March 9, 2004
Implementation date
June 1, 2004
Scope
DL/T 860.4-2004 is the English-translated version of 变电站通信网络和系统 第4部分:系统和项目管理.
DL/T 860.4-2004 is the Chinese industry standard "Communication networks and systems in substations. Part 4: System and project management". It was issued on March 9, 2004 by the National Development and Reform Commission, and took effect on June 1, 2004. It is obsolete: it has been replaced by DL/T 860.4-2018.
Found what you need?
Document preview — DL/T 860.4-2004
National Standard of the People's Republic of China
Issued by: National Development and Reform Commission
Contents
- Document data
1 Document data
Sector: Electricity & Power (industry standard).
Issuing body: National Development and Reform Commission.
Date of issue: 2004-03-09.
Date of implementation: 2004-06-01.
Status: obsolete, replaced by DL/T 860.4-2018.
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — all pages — is available in the English PDF.
Referenced standards
Cited by
- NB/T 10149-2019Microgrids - Part 2: Guidelines for operation
- NB/T 32016-2013Technical Specification for Grid-connected Photovoltaic Supervision Control and Data Acquisition System
- GB/Z 25320.1-2010Power systems management and associated information exchange - Data and communications security - Part 1: Communication network and system security - Introduction to security issues
How to Download DL/T 860.4-2004
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
DL/T 860.5-2006 — Communication networks and systems in substations. Part 5: Communication requirements for functions and device models
DL/T 860.3-2004 — Communication networks and systems in substations. Part 3: General requirements
DL/T 860.10-2018 — Communication networks and systems for power utility automation -Part 10: Conformance testing
Secure payment via Stripe
Payments accepted
DL/T 860.4-2004
$420.00