DL/T 665-1999The acceptance standard of water and steam integrated sampling and on-line analysing unit (English PDF)
水汽集中取样分析装置验收标准
DL/T 665 | Evolution and historical versions
| Std ID | Title | Status |
|---|---|---|
| DL/T 665-2009 | Inspection guide for water and steam integrated sampling and on-line analysing unit | Valid |
| DL/T 665-1999 | The acceptance standard of water and steam integrated sampling and on-line analysing unit | Obsolete |
DL/T 665-1999 is obsolete. It has been replaced by DL/T 665-2009. This page sells the obsolete edition, for projects and contracts that still cite it.
This is a limited preview
Buy now to download the full PDF
Need quotation for your management?
Get a formal quotation for DL/T 665-1999 in 30 minutes.
Issued by
Ministry of Electric Power Industry
Level / Type
National · Recommended
Issue date
August 2, 1999
Implementation date
October 1, 1999
Scope
DL/T 665-1999 is the English-translated version of 水汽集中取样分析装置验收标准.
DL/T 665-1999 is the Chinese industry standard "The acceptance standard of water and steam integrated sampling and on-line analysing unit". It was issued on August 2, 1999 by the Ministry of Electric Power Industry, and took effect on October 1, 1999. It is obsolete: it has been replaced by DL/T 665-2009.
Found what you need?
Document preview — DL/T 665-1999
National Standard of the People's Republic of China
Issued by: Ministry of Electric Power Industry
Contents
- Document data
1 Document data
Sector: Electricity & Power (industry standard).
Issuing body: Ministry of Electric Power Industry.
Date of issue: 1999-08-02.
Date of implementation: 1999-10-01.
Status: obsolete, replaced by DL/T 665-2009.
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — all pages — is available in the English PDF.
How to Download DL/T 665-1999
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
DL/T 5458-2026 — Regulations for content and depth of detailed design of substation project
DL/T 1010.3-2025 — High voltage static reactive power compensation devices - Part 3: Control and protection system
DL/T 1078-2025 — Test specification for operating performance of surface condenser
Secure payment via Stripe
Payments accepted
DL/T 665-1999
$265.00