DL/T 606.4-1996Guide for balance of electrical energy of thermal power plant (English PDF)
火力发电厂电能平衡导则
DL/T 606.4 | Evolution and historical versions
| Std ID | Title | Status |
|---|---|---|
| DL/T 606.4-2018 | Guide for energy balance of thermal power plant - Part 4: Electrical energy balance | Valid |
| DL/T 606.4-1996 | Guide for balance of electrical energy of thermal power plant | Obsolete |
DL/T 606.4-1996 is obsolete. It has been replaced by DL/T 606.4-2018. This page sells the obsolete edition, for projects and contracts that still cite it.
This is a limited preview
Buy now to download the full PDF
Need quotation for your management?
Get a formal quotation for DL/T 606.4-1996 in 30 minutes.
Level / Type
National · Recommended
Issue date
February 24, 1997
Implementation date
June 1, 1997
Scope
DL/T 606.4-1996 is the English-translated version of 火力发电厂电能平衡导则.
DL/T 606.4-1996 is the Chinese industry standard "Guide for balance of electrical energy of thermal power plant". It was issued on February 24, 1997, and took effect on June 1, 1997. It is obsolete: it has been replaced by DL/T 606.4-2018.
Found what you need?
Document preview — DL/T 606.4-1996
Contents
- Document data
1 Document data
Sector: Electricity & Power (industry standard).
Date of issue: 1997-02-24.
Date of implementation: 1997-06-01.
Status: obsolete, replaced by DL/T 606.4-2018.
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — all pages — is available in the English PDF.
How to Download DL/T 606.4-1996
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
DL/T 606.5-2024 — Energy balance guidelines for thermal power plants - Part 5: Water balance test
DL/T 606.3-1996 — Guide for thermal energy balance of thermal power plant
DL/T 606.5-2009 — Guide for energy balance of thermal power plant. Part 5: water balance test
Secure payment via Stripe
Payments accepted
DL/T 606.4-1996
$285.00