DL/T 606.3-1996Guide for thermal energy balance of thermal power plant (English PDF)

火力发电厂热平衡导则

Preview PDF

DL/T 606.3 | Evolution and historical versions

Std IDTitleStatus
DL/T 606.3-2014Guidance for Energy Balance in Thermal Power Plant - Part 3: Thermal BalanceValid
DL/T 606.3-2006Guide for energy balance of thermal power plant part 3:thermal energy balanceObsolete
DL/T 606.3-1996Guide for thermal energy balance of thermal power plantObsolete

DL/T 606.3-1996 is obsolete. It has been replaced by DL/T 606.3-2006. This page sells the obsolete edition, for projects and contracts that still cite it.

This is a limited preview

Buy now to download the full PDF

Need quotation for your management?

Get a formal quotation for DL/T 606.3-1996 in 30 minutes.

Issued by

Ministry of Electric Power Industry

Level / Type

National · Recommended

Issue date

February 27, 1997

Implementation date

June 1, 1997

Scope

DL/T 606.3-1996 is the English-translated version of 火力发电厂热平衡导则.

DL/T 606.3-1996 is the Chinese industry standard "Guide for thermal energy balance of thermal power plant". It was issued on February 27, 1997 by the Ministry of Electric Power Industry, and took effect on June 1, 1997. It is obsolete: it has been replaced by DL/T 606.3-2006.

Found what you need?

Document preview — DL/T 606.3-1996

National Standard of the People's Republic of China

Issued by: Ministry of Electric Power Industry

Contents

  • Document data
1 Document data

Sector: Electricity & Power (industry standard).

Issuing body: Ministry of Electric Power Industry.

Date of issue: 1997-02-27.

Date of implementation: 1997-06-01.

Status: obsolete, replaced by DL/T 606.3-2006.

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — all pages — is available in the English PDF.

How to Download DL/T 606.3-1996

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

DL/T 606.3-1996

$255.00