DL/T 578-1995Specification of supervisory computer control system for hydroelectric power plants (English PDF)
水电厂计算机监控系统基本技术条件
DL/T 578 | Evolution and historical versions
| Std ID | Title | Status |
|---|---|---|
| DL/T 578-2008 | Specification of Computer Supervision and Control System for Hydraulic Powerplants | Valid |
| DL/T 578-1995 | Specification of supervisory computer control system for hydroelectric power plants | Obsolete |
DL/T 578-1995 is obsolete. It has been replaced by DL/T 578-2008. This page sells the obsolete edition, for projects and contracts that still cite it.
This is a limited preview
Buy now to download the full PDF
Need quotation for your management?
Get a formal quotation for DL/T 578-1995 in 30 minutes.
Level / Type
National · Recommended
Issue date
July 13, 1995
Implementation date
December 1, 1995
Scope
DL/T 578-1995 is the English-translated version of 水电厂计算机监控系统基本技术条件.
DL/T 578-1995 is the Chinese industry standard "Specification of supervisory computer control system for hydroelectric power plants". It was issued on July 13, 1995, and took effect on December 1, 1995. It is obsolete: it has been replaced by DL/T 578-2008.
Found what you need?
Document preview — DL/T 578-1995
Contents
- Document data
1 Document data
Sector: Electricity & Power (industry standard).
Date of issue: 1995-07-13.
Date of implementation: 1995-12-01.
Status: obsolete, replaced by DL/T 578-2008.
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — all pages — is available in the English PDF.
Referenced standards
Cited by
- GB/T 40222-2021Guide for smart hydropower plant
- NB/T 42055-2015Technical code for automatic control of low-voltage hydropower unit
- NB/T 42029.7-2014Design code for gas electric power plant with reciprocating internal combustion engines - Part 7: control system
- NB/T 42033-2014Specification of centralized control system for small hydropower stations group
How to Download DL/T 578-1995
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
DL/T 5458-2026 — Regulations for content and depth of detailed design of substation project
DL/T 1010.3-2025 — High voltage static reactive power compensation devices - Part 3: Control and protection system
DL/T 1078-2025 — Test specification for operating performance of surface condenser
Secure payment via Stripe
Payments accepted
DL/T 578-1995
$255.00