DL/T 5475-2013Guidelines for item segregation of construction budget for garbage power generation project (English PDF)
垃圾发电工程建设预算项目划分导则
DL/T 5475 | Evolution and historical versions
| Std ID | Title | Status |
|---|---|---|
| DL/T 5475-2025 | Guidelines for Item Segregation of Construction Budget forGarbage Power Generation Project | Valid |
| DL/T 5475-2013 | Guidelines for item segregation of construction budget for garbage power generation project | Obsolete |
DL/T 5475-2013 is obsolete. It has been replaced by DL/T 5475-2025. This page sells the obsolete edition, for projects and contracts that still cite it.
This is a limited preview
Buy now to download the full PDF
Need quotation for your management?
Get a formal quotation for DL/T 5475-2013 in 30 minutes.
Issued by
National Energy Administration
Level / Type
National · Recommended
Issue date
June 8, 2013
Implementation date
October 1, 2013
Scope
DL/T 5475-2013 is the English-translated version of 垃圾发电工程建设预算项目划分导则.
DL/T 5475-2013 is the Chinese industry standard "Guidelines for item segregation of construction budget for garbage power generation project". It was issued on June 8, 2013 by the National Energy Administration, and took effect on October 1, 2013. It is obsolete: it has been replaced by DL/T 5475-2025.
Found what you need?
Document preview — DL/T 5475-2013
National Standard of the People's Republic of China
Issued by: National Energy Administration
Contents
- Document data
1 Document data
Sector: Electricity & Power (industry standard).
Issuing body: National Energy Administration.
Date of issue: 2013-06-08.
Date of implementation: 2013-10-01.
Status: obsolete, replaced by DL/T 5475-2025.
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — all pages — is available in the English PDF.
How to Download DL/T 5475-2013
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
DL/T 5458-2026 — Regulations for content and depth of detailed design of substation project
DL/T 1010.3-2025 — High voltage static reactive power compensation devices - Part 3: Control and protection system
DL/T 1078-2025 — Test specification for operating performance of surface condenser
Secure payment via Stripe
Payments accepted
DL/T 5475-2013
$620.00