DL/T 5210.6-2009Specification for construction quality acceptance and evaluation of electric power construct. Part 6: The equipment and the system with the water treatment and hydrogen generation (English PDF)
电力建设施工质量验收及评价规程 第6部分:水处理及制氢设备和系统
DL/T 5210.6 | Evolution and historical versions
| Std ID | Title | Status |
|---|---|---|
| DL/T 5210.3-2018 | Code for construction quality acceptance of electric power construct Part 3: steam turbine generator unit | Valid |
| DL/T 5210.6-2009 | Specification for construction quality acceptance and evaluation of electric power construct. Part 6: The equipment and the system with the water treatment and hydrogen generation | Obsolete |
DL/T 5210.6-2009 is obsolete. It has been replaced by DL/T 5210.3-2018. This page sells the obsolete edition, for projects and contracts that still cite it.
This is a limited preview
Buy now to download the full PDF
Need quotation for your management?
Get a formal quotation for DL/T 5210.6-2009 in 30 minutes.
Issued by
National Development and Reform Commission
Level / Type
National · Recommended
Issue date
July 22, 2009
Implementation date
December 1, 2009
Scope
DL/T 5210.6-2009 is the English-translated version of 电力建设施工质量验收及评价规程 第6部分:水处理及制氢设备和系统.
DL/T 5210.6-2009 is the Chinese industry standard "Specification for construction quality acceptance and evaluation of electric power construct. Part 6: The equipment and the system with the water treatment and hydrogen generation".
It was issued on July 22, 2009 by the National Development and Reform Commission, and took effect on December 1, 2009. It is obsolete: it has been replaced by DL/T 5210.3-2018.
Found what you need?
Document preview — DL/T 5210.6-2009
National Standard of the People's Republic of China
Issued by: National Development and Reform Commission
Contents
- Document data
1 Document data
Sector: Electricity & Power (industry standard).
Issuing body: National Development and Reform Commission.
Date of issue: 2009-07-22.
Date of implementation: 2009-12-01.
Status: obsolete, replaced by DL/T 5210.3-2018.
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — all pages — is available in the English PDF.
How to Download DL/T 5210.6-2009
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Fast delivery
After payment you'll receive an email confirmation. The English PDF is sent to the same address, usually within minutes and at the latest within 1 business day.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
DL/T 5210.5-2009 — Code for construction quality acceptance and evaluation of electric power construct. Part 5: Piping and System
DL/T 5210.5-2018 — Code for construction quality acceptance of electric power construct - Part 5: welding
DL/T 5210.4-2009 — Code for construction quality acceptance and evaluation of electric power construct. Part 4: Instrumentation and control
DL/T 5210.6-2009
$1,200.00