Obsolete

DL/T 5198-2004Code for the construction of crane girders anchored to rock face for hydropower and water resources projects (English PDF)

水电水利工程岩壁梁施工规程

Preview PDF

DL/T 5198 | Evolution and historical versions

Std IDTitleStatus
DL/T 5198-2013Code for the Construction of Crane Girders Anchored To Rock Face for Hydropower and Water Resources ProjectsObsolete
DL/T 5198-2004Code for the construction of crane girders anchored to rock face for hydropower and water resources projectsObsolete

DL/T 5198-2004 is obsolete. It has been replaced by DL/T 5198-2013. This page sells the obsolete edition, for projects and contracts that still cite it.

This is a limited preview

Buy now to download the full PDF

Need quotation for your management?

Get a formal quotation for DL/T 5198-2004 in 30 minutes.

Issued by

SDPC

Level / Type

National · Recommended

Issue date

October 20, 2004

Implementation date

April 1, 2005

Scope

DL/T 5198-2004 is the English-translated version of 水电水利工程岩壁梁施工规程.

DL/T 5198-2004 is the Chinese industry standard "Code for the construction of crane girders anchored to rock face for hydropower and water resources projects". It was issued on October 20, 2004 by SDPC, and took effect on April 1, 2005. It is obsolete: it has been replaced by DL/T 5198-2013.

Found what you need?

Document preview — DL/T 5198-2004

National Standard of the People's Republic of China

Issued by: SDPC

Contents

  • Document data
1 Document data

Sector: Electricity & Power (industry standard).

Issuing body: SDPC.

Date of issue: 2004-10-20.

Date of implementation: 2005-04-01.

Status: obsolete, replaced by DL/T 5198-2013.

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — all pages — is available in the English PDF.

How to Download DL/T 5198-2004

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

DL/T 5198-2004

$135.00