DL/T 5187.2-2019Technical specification for coal transportation design in thermal power plants Part 2: Prevention of coal dust (English PDF)
This is a limited preview
Buy now to download the full PDF
Need quotation for your management?
Get a formal quotation for DL/T 5187.2-2019 in 30 minutes.
Level / Type
National · Recommended
Scope
DL/T 5187.2-2019 (Technical specification for coal transportation design in thermal power plants Part 2: Prevention of coal dust) is available as an English-translated PDF.
DL/T 5187.2-2019 is the Chinese industry standard "Technical specification for coal transportation design in thermal power plants Part 2: Prevention of coal dust". It is in force and replaces DL/T 5187.2-2004.
Found what you need?
Document preview — DL/T 5187.2-2019
Contents
- Document data
1 Document data
Sector: Electricity & Power (industry standard).
Status: valid, replaces DL/T 5187.2-2004.
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — all pages — is available in the English PDF.
Editions of DL/T 5187.2
| Edition | Title | Revision | Status |
|---|---|---|---|
| DL/T 5187.2-2019 | Technical specification for coal transportation design in thermal power plants Part 2: Prevention of coal dust | — | Valid |
| DL/T 5187.2-2004 | Technical code for designing coal handling of fossil fuel power plant Part 2: Dust prevention and control | — | Obsolete |
This page sells the current edition, DL/T 5187.2-2019. Earlier editions are listed for reference only.
How to Download DL/T 5187.2-2019
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Fast delivery
After payment you'll receive an email confirmation. The English PDF is sent to the same address, usually within minutes and at the latest within 1 business day.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
DL/T 5187.3-2012 — Technical code for the design of coal handling fossil-fired power plant. Part 3: Coal handling automation system
DL/T 5187.1-2004 — Technical coal for designing coal handling of fossil fuel power plant Part 1: Coal handling system
DL/T 5187.1-2016 — Technical Code for Designing Coal Handling of Fossil Fuel Power Plant - Part 1: Coal Handling System
DL/T 5187.2-2019
$285.00