DL/T 5149-2020Code for design of substation monitoring and control system (English PDF)
This is a limited preview
Buy now to download the full PDF
Need quotation for your management?
Get a formal quotation for DL/T 5149-2020 in 30 minutes.
Level / Type
National · Recommended
Scope
DL/T 5149-2020 (Code for design of substation monitoring and control system) is available as an English-translated PDF.
DL/T 5149-2020 is the Chinese industry standard "Code for design of substation monitoring and control system". It is in force and replaces DL/T 5149-2001.
Found what you need?
Document preview — DL/T 5149-2020
Contents
- Document data
1 Document data
Sector: Electricity & Power (industry standard).
Status: valid, replaces DL/T 5149-2001.
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — all pages — is available in the English PDF.
Referenced standards
Cited by
- NB/T 11106-2023Technical requirements for unattended monitoring and control system of underground power supply in coal mine
- GB/T 40773-2021Technical specification of monitoring and control system for auxiliary facilities in substation
- NB/T 10321-2019Technical specifications for monitoring and control system of wind farm
- NB/T 33005-2013Technical Specification for Monitoring System of Electric Vehicle Charging Station and Battery Swap Station
Editions of DL/T 5149
| Edition | Title | Revision | Status |
|---|---|---|---|
| DL/T 5149-2020 | Code for design of substation monitoring and control system | — | Valid |
| DL/T 5149-2001 | Technical code for designing computerized monitoring and control system of 220~500kV substations | — | Obsolete |
This page sells the current edition, DL/T 5149-2020. Earlier editions are listed for reference only.
How to Download DL/T 5149-2020
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Fast delivery
After payment you'll receive an email confirmation. The English PDF is sent to the same address, usually within minutes and at the latest within 1 business day.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
DL/T 1008-2026 — Functional specification for technical support system of medium and long term electricity trading
DL/T 1027-2026 — Code for testing of wet cooling towers
DL/T 1041-2026 — Guide for on-site tests of electromagnetic transients in power systems
DL/T 5149-2020
$330.00