Valid

DL/T 1995-2019Insulating platform for live working in substation or converter station (English PDF)

Preview PDF

This is a limited preview

Buy now to download the full PDF (7 pages)

Need quotation for your management?

Get a formal quotation for DL/T 1995-2019 in 30 minutes.

Issued by

National Energy Administration

Level / Type

National · Recommended

Issue date

June 4, 2019

Implementation date

October 1, 2019

Scope

DL/T 1995-2019 (Insulating platform for live working in substation or converter station) is available as an English-translated PDF.

DL/T 1995-2019 — This standard specifies the classification, technical requirements, test methods, inspection rules, and transportation of insulating platforms for live work in substations/converter stations and custody, etc. This standard is applicable to AC 110(66)kV~1000kV substations and ±500kV~±800kV converter stations in areas with an altitude of 1000m and below Insulated platform for electrical work.

Found what you need?

Document preview — DL/T 1995-2019

National Standard of the People's Republic of China

ICS
29.240.20
Classification
K 47

Issued by: National Energy Administration

Contents

  • Foreword
  • 1 Scope
  • 2 Normative references
  • 3 Terms and definitions
  • 4 Classification
  • 5 Technical requirements
  • 6 Test method
  • 7 Inspection rules
  • 8 Identification, packaging, transportation and storage

Foreword

This standard is based on the rules given in GB/T 1.1-2009 "Guidelines for Standardization Part 1: Structure and Compilation of Standard Compilation" grass.

This standard was proposed by the China Electricity Council.

This standard is under the jurisdiction of the National Technical Committee for Standardization of Live Work (SAC/TC36).

The main drafting organizations of this standard. China Electric Power Research Institute Co., Ltd., State Grid Jinhua Power Supply Company, State Grid North Hebei Electric Power Research Institute Institute Co., Ltd., Yixing Yi'an Electric Power Equipment Manufacturing Co., Ltd., Kunming Feixiang Material Technology Co., Ltd.

1 Scope

This standard specifies the classification, technical requirements, test methods, inspection rules, and transportation of insulating platforms for live work in substations/converter stations and custody, etc.

This standard is applicable to AC 110(66)kV~1000kV substations and ±500kV~±800kV converter stations in areas with an altitude of 1000m and below Insulated platform for electrical work.

2 Normative references

The following documents are indispensable for the application of this document. For dated reference documents, only the dated version applies to this article Pieces. For undated references, the latest version (including all amendments) applies to this document.

GB/T 2900.55 Electrician Terminology Live Work GB/T 5130 Test method for industrial hard laminate of thermosetting resin for electrical use GB/T 13035 Insulated rope for live working GB 13398 Hollow insulating pipe, foam-filled insulating pipe and solid insulating rod for live working GB/T 14286 Terminology for live working tools and equipment GB/T 16927.1 High Voltage Test Technology Part 1: General Definition and Test Requirements GB/T 18037 Basic technical requirements and design guidelines for live working tools GB 26860 Electrical Safety Work Rules for Electrical Parts of Power Plants and Substations DL 779 Insulated rope tools for live working DL/T 878 Test guidelines for insulating tools for live working DL/T 974 Tool warehouse for live working DL/T 976 Preventive test procedures for live working tools, devices and equipment

3 Terms and definitions

The following terms and definitions defined by GB/T 2900.55 and GB/T 14286 apply to this document.

Insulating platform

It is a working platform that is made of insulating materials or the main material is insulating material, carrying live workers and providing main insulation protection.

Main insulation

The insulating parts of the insulating platform used to bear the phase-to-earth voltage play the role of main insulation and are a necessary condition for safe operation.

Impact load

The hanging point of the safety belt of the insulated platform is subjected to the impact force of the free fall of the heavy object at a height.

Custom workload

Work load of the insulated platform determined by the user and the manufacturer through negotiation.

4 Categories

4.1 The insulating platform is divided according to the structure and function, which can be divided into fixed bracket type and mobile lifting type. The fixed bracket type should be the insulating material and the connecting parts are assembled. The mobile lifting type can be composed of a mobile base and a multi-section suit lifting platform, and the number of installation sections can be adjusted according to the level the height of the platform is determined, or the lifting platform with a scissor structure is adopted.

4.2 The insulation platform is divided into Class I, Class II, and Class III according to the load-bearing capacity, which can be selected according to the weight of the operator and the weight of the equipment.

5 Technical requirements

5.1 General requirements

5.1.1 The design and overall assembly of the insulation platform should meet the requirements of GB/T 18037.

5.1.2 The raw materials of the insulation platform shall pass the type test.

5.1.3 When the hard insulating parts of the insulating platform are made of insulating plates, pipes, profiles, or foam-filled pipes, they shall comply with the regulations of GB 13398.

set.

5.1.4 When the soft insulating parts of the insulating platform adopt load-bearing insulating ropes and wind-proof insulating ropes, they shall comply with the regulations of GB/T 13035 and DL 779.

set.

5.1.5 The metal parts in the insulating platform should be made of high-strength, light-weight metal materials, generally high-strength aluminum alloy materials.

5.1.6 The surface of the aluminum alloy material parts in the insulation platform shall be anodized, and the surface of the shaft steel parts shall have a protective coating and insulation layer.

The surface of pressure material parts should be treated with insulating paint.

5.1.7 The shape of each part of the insulation platform shall not have sharp edges and corners.

5.2 Structure height and main insulation length

5.2.1 The structural height of the insulation platform and the length of the main insulation shall meet the requirements of Table 1.

5.2.2 The length of the main insulation should be removed from the length of the intermediate connecting devices such as metal joints and the length of short-circuiting during climbing or operation by operators.

Degree, the length of the metal joint includes the part embedded in the insulating surface.

5.3 Electrical performance indicators

5.3.1 The electrical performance test items and requirements of the 110kV~1000kV voltage level insulation platform shall meet the requirements of Table 2.

5.3.2 The power frequency withstand voltage and operation shock withstand voltage test shall have no breakdown, no flashover, and no overheating.

5.4.2 The mechanical properties of the insulated platform of the customized workload shall be the customized workload as the rated load, according to the relationship in Table 4.

Count.

5.4.3 After the mechanical performance test is unloaded, the components of the insulation platform should not be permanently deformed or damaged, and the auxiliary mechanism should be intact.

5.5 Constraint cable requirements

5.5.1 In addition to its own support, the insulated platform should be equipped with insulated cables to impose constraints on the platform. The electrical performance requirements of the insulated cables are the same as those of the platform.

5.5.2 When the overall height of the platform exceeds 10m, a layered cable shall be set, and the restraint position shall be at the top and middle of the platform. Multi-layer lifting platform erected After that, each layer should be equipped with insulated cables, and the angle between the cables and the ground should not be greater than 45°.

5.5.3 Insulated cables should be no less than 4 in each layer, and they should be evenly arranged on the same plane along the circumference.

5.6 Other requirements

5.6.1 The working area of the insulated platform should have the function of interphase safety limit, and be equipped with anti-high fall fence, the height of the fence should not be less than 0.9m.

5.6.2 The inter-node connection of the multi-segment suit platform shall be provided with an anti-dropping locking device.

6 Test method

6.1 Visual inspection

6.1.1 Check the structural height and main insulation length of the insulation platform in accordance with 5.2.

6.1.2 The surface of each part of the insulating platform should be smooth, and the insulating parts should be free of bubbles, wrinkles, or cracks, and should comply with 5.1.3 and 5.1.4 Requirements. The metal parts should be free of deformation or damage, and should meet the requirements of 5.1.5 and 5.1.6.

6.2 Insulation material test

6.2.1 The electrical and mechanical test methods of insulating plates shall be carried out in accordance with the regulations in GB/T 5130.

6.2.2 The electrical and mechanical test methods for insulating pipes shall be carried out in accordance with the regulations in GB 13398.

6.2.3 The electrical and mechanical test methods of insulated ropes shall be carried out in accordance with the regulations in GB/T 13035.

6.3 Overall electrical test

6.3.1 The high voltage test method shall be carried out in accordance with the provisions of GB/T 16927.1.

6.3.2 The electrical test wiring is shown in Figure 1.Assemble the insulation platform to the working state, and select the length L of the main insulation component as the test section.

Test electrodes are set at the upper and lower ends of the test section. The upper part is the high-voltage electrode, and the lower part is the ground electrode. The electrode width is 20mm.

6.3.3 The applied voltage for the power frequency withstand voltage and operating impulse test should meet the requirements of Table 2 and Table 3.

6.3.4 During the leakage current test, connect the ammeter string between the grounding electrode and the grounding body, and apply the corresponding power frequency voltage.

6.3.5 The applied voltage for the power frequency withstand voltage and leakage current test shall be increased at a uniform speed.

Figure 1 Schematic diagram of electrical performance test wiring

6.4 Overall mechanical performance test

6.4.1 Static load test

6.4.1.1 The insulating platform is assembled to the working state, the working platform is raised to the maximum height, the pull wire is at an angle of 45° to the ground and is under stress.

Apply the weight corresponding to the load in Table 4 on the top surface of the platform and let it stand for 5 minutes.

6.4.1.2 The applied load should be stable and no impact force should appear.

6.4.2 Dynamic load test

6.4.2.1 The lifting platform fixes the base, the platform is lowered to the lowest position, and the corresponding load in Table 4 is applied to the top surface of the platform.

Raise the platform to the highest position, then lower it to the lowest position, and repeat the lifting 3 times.

6.4.2.2 The lifting process should be stable and the speed should not exceed 0.5m/s.

6.4.2.3 During the test, there should be no component damage or jamming.

6.4.3 Destructive load test

6.4.3.1 Assemble the insulating platform to the working condition, apply the weight corresponding to the load in Table 4 on the top surface of the platform, and let it stand for 5 minutes.

6.4.3.2 The applied load should be stable and no impact force should appear.

6.4.4 Impact load test of seat belt suspension point

6.4.4.1 A rope that can withstand the impact load is fastened at the position of the safety belt hanging point of the insulated platform, according to the rated load in Table 4 or customized working load Worth hanging heavy objects of the same weight.

6.4.4.2 Drop the test weight freely from the hanging point of the safety belt of the platform, with a stroke height of 1m, and impact 3 times with an interval of 3 minutes each time.

7 Inspection rules

7.1 Type test

7.1.1 Type test should be carried out in one of the following cases, and the sample used for type test should be randomly selected from a batch of products in the production line Samples, but not less than 3 pieces. If the same batch of products is less than 3 pieces, all samples will be taken.

a) Trial formulation of new products into production or old products transfer to factory production;

b) After formal production, when the product structure or material composition is changed;

c) When the product is stopped for more than one year and resumes production;

d) When the national quality supervision and inspection agency issues type test requirements.

7.1.2 The type test items are shown in Table 5.If any one of the test items in Table 5 is not met, the inspection is considered unqualified.

7.2 Factory test

7.2.1 The product shall be checked and accepted by batch. A batch of products with the same brand of raw materials, the same specification and continuous production;

7.2.2 The products should be inspected one by one after leaving the factory, and the factory tests listed in Table 4 should be carried out.

7.2.3 User acceptance can be carried out according to the factory test items, or the acceptance test items can be determined through consultation with the manufacturer.

7.3 Preventive test

7.3.1 Preventive tests can be carried out with reference to DL/T 976, and the test items meet the requirements of Table 5.

7.3.2 The preventive test cycle is 12 months.

8 Identification, packaging, transportation and storage

8.1 Identification

8.1.1 The nameplate of the insulation platform should include. tool name, voltage level, manufacturing unit, and manufacturing date.

8.1.2 The effective insulation interval shall be marked on the insulating parts of the platform.

8.2 Packaging

8.2.1 The packaging of the insulated platform should be packaged in segments such as canvas sleeves, plastic sleeves or wooden boxes. The integrated platform can be packaged as a whole.

8.2.2 The inspection certificate and installation instructions should be enclosed in the packing box.

8.2.3 The packaging box should be marked with the name of the manufacturer, the name of the product, the gross weight, the net weight and the date of manufacture. In addition, it should be marked as "moisture proof" "Handle with care", "Do not press", "Do not touch", etc.

8.3 Transportation

8.3.1 During the transportation of the insulating platform, measures should be taken to prevent the insulating material from getting wet.

8.3.2 During transportation, the insulating platform shall be properly fixed, with measures to prevent bumps and scratches.

8.4 Storage

8.4.1 The insulating platform should be stored in a well-ventilated, clean and dry room. The insulating parts should not directly touch the ground during storage, and should be away from the ground.

The height should not be less than 20cm.

8.4.2 The insulated platform can also be stored in the warehouse of live working tools and equipment, and the warehouse conditions should meet the requirements of DL/T 974.

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 7 pages — is available in the English PDF.

Referenced standards

How to Download DL/T 1995-2019

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
7 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

DL/T 1995-2019

$184.00