DL/T 1056-2019Technical supervision guide for instrument and control in power plant (English PDF)
发电厂热工仪表及控制系统技术监督导则
This is a limited preview
Buy now to download the full PDF
Need quotation for your management?
Get a formal quotation for DL/T 1056-2019 in 30 minutes.
Issued by
National Energy Administration
Level / Type
National · Recommended
Issue date
June 4, 2019
Implementation date
October 1, 2019
Scope
DL/T 1056-2019 is the English-translated version of 发电厂热工仪表及控制系统技术监督导则.
DL/T 1056-2019 is the Chinese industry standard "Technical supervision guide for instrument and control in power plant". It was issued on June 4, 2019 by the National Energy Administration, and took effect on October 1, 2019. It is in force and replaces DL/T 1056-2007.
Found what you need?
Document preview — DL/T 1056-2019
National Standard of the People's Republic of China
Issued by: National Energy Administration
Contents
- Document data
1 Document data
Sector: Electricity & Power (industry standard).
Issuing body: National Energy Administration.
Date of issue: 2019-06-04.
Date of implementation: 2019-10-01.
Status: valid, replaces DL/T 1056-2007.
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — all pages — is available in the English PDF.
Editions of DL/T 1056
| Edition | Title | Revision | Status |
|---|---|---|---|
| DL/T 1056-2019 | Technical supervision guide for instrument and control in power plant | — | Valid |
| DL/T 1056-2007 | Technical supervision guide for instrument and control system in power plant | — | Obsolete |
This page sells the current edition, DL/T 1056-2019. Earlier editions are listed for reference only.
How to Download DL/T 1056-2019
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Fast delivery
After payment you'll receive an email confirmation. The English PDF is sent to the same address, usually within minutes and at the latest within 1 business day.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
DL/T 1008-2026 — Functional specification for technical support system of medium and long term electricity trading
DL/T 1027-2026 — Code for testing of wet cooling towers
DL/T 1041-2026 — Guide for on-site tests of electromagnetic transients in power systems
DL/T 1056-2019
$285.00