YS/T 3008-2012The norm of energy consumption per unit product of fuel (diesel) activated carbon regeneration process (English PDF)
燃油(柴油)加热活性炭再生工艺能源消耗限额
This is a limited preview
Buy now to download the full PDF (6 pages)
Need quotation for your management?
Get a formal quotation for YS/T 3008-2012 in 30 minutes.
Issued by
Ministry of Industry and Information Technology
Level / Type
National · Recommended
Issue date
May 24, 2012
Implementation date
November 1, 2012
Scope
YS/T 3008-2012 is the English-translated version of 燃油(柴油)加热活性炭再生工艺能源消耗限额.
YS/T 3008-2012 — This standard specifies the fuel (diesel fuel) activated carbon regeneration process heating energy consumption per operation (hereinafter referred to limit energy consumption) requirements, namely, Calculation methods, energy management.
This standard applies to fuel (diesel) heating the activated carbon regeneration process to calculate energy consumption, assessment and control of new energy projects.
Found what you need?
Document preview — YS/T 3008-2012
National Standard of the People's Republic of China
- ICS
- 27.010
- Classification
- D 46
Issued by: Ministry of Industry and Information Technology
Contents
- What this standard covers1
- Document data2
- Standards quoted by this document3
What this standard covers
This standard specifies the fuel (diesel) heating the activated carbon regeneration process of energy consumption per operation (hereinafter referred to as energy consumption limits) requirements, calculation methods and energy management. This standard a
Document data
International classification (ICS): 27.010.
Chinese classification (CCS): D46.
Estimated length of the Chinese original: 8,820 words.
Standards quoted by this document
GB/T 2589; GB 17167
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 6 pages — is available in the English PDF.
Referenced standards
How to Download YS/T 3008-2012
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
GB 17167-2025 — General rules for energy measuring instrument equipping and managing of energy user
GB/T 2589-2020 — General rules for calculation of the comprehensive energy consumption
GB/T 25890.1-2026 — Railway applications - Fixed installations - DC switchgear - Part 1: General
Secure payment via Stripe
Payments accepted
YS/T 3008-2012
$165.00