YDB 119-2013Technical requirement for SWP between UICC-CLF (English PDF)
数字移动通信终端通用集成电路卡(UICC)与非接触通信模块(CLF)间单线协议(SWP)技术要求
This is a limited preview
Buy now to download the full PDF (32 pages)
Need quotation for your management?
Get a formal quotation for YDB 119-2013 in 30 minutes.
Issued by
Ministry of Industry and Information Technology
Level / Type
National · Mandatory
Issue date
March 6, 2013
Implementation date
March 6, 2013
Scope
YDB 119-2013 is the English-translated version of 数字移动通信终端通用集成电路卡(UICC)与非接触通信模块(CLF)间单线协议(SWP)技术要求.
YDB 119-2013 — Technical requirement for SWP between UICC-CLF
Found what you need?
Document preview — YDB 119-2013
National Standard of the People's Republic of China
- ICS
- 35.240.15
- Classification
- L 64
Issued by: Ministry of Industry and Information Technology
Contents
- What this standard covers1
- Document data2
- Standards quoted by this document3
What this standard covers
This standard specifies the Universal Integrated Circuit Card (UICG) and non-contact communication module (CLF) between Single Wire Protocol (SWP) technical requirements, including the basic principles, system architecture, physical characteristics, elect
Document data
International classification (ICS): 35.240.15.
Chinese classification (CCS): L64.
Estimated length of the Chinese original: 48,447 words.
Adopted international standard: ETSI TS 102 613, IDT.
Standards quoted by this document
ISO/IEC 13239; ISO/IEC 14443-2; ISO/IEC 14443-3; ISO/IEC 14443-4; ISO/IEC 18092; ETSI TS 102 221; ETSI TS 102 223; ETSI TS 102 600
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 32 pages — is available in the English PDF.
How to Download YDB 119-2013
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
YDB 195-2018 — Technical requirements and test method for quick charge of mobile telecommunication terminal equipment
YDB 196.2-2018 — Technical requirements and test methods for wireless power supply devices--Part 2: Magnetic inductive coupling equipment
YDB 196.3-2018 — Technical requirements and test methods for wireless power supply devices -- Part 3: Magnetic resonance equipment
Secure payment via Stripe
Payments accepted
YDB 119-2013
$899.00